Instrument Engineer
Taqa Industrial and Petroleum Services
Total years of experience :19 years, 6 Months
participating in after-sales, commissioning, supervision and services of (Instrumentations and control) related products, conducts site surveys for pre-bid and post-bid activities, keep track of projects and close contact are being maintained with contractors, communicate to senior engineers, consultants, buyers and the entire necessary element for each project for the success of the jobs.
FMC Technologies: October 2011 - April, 2013: Lead Team engineer
Liaison with clients' Drilling Supervisors / Wellheads Services Supervisors for wellhead,
installations, maintenance, integrity operations, requirements and HSE related issues,
Responsible for equipments and staff management while on site, Ensure that all HSE
policies of the company are implemented while on job, Write report about jobs done by me in the field for FMC and client.
Safety and services training: • Stop Program training (UAE)
• Service Skill Training (UAE)
• Quality Improvement Process training (QIP) (UAE)
February 2011 - October 2011 Control engineer
Preparing electrical design for installing a crude oil ultrasonic metering station (Ozair matering station), establishing required transformer and system connections, establishing PLC
controlling panel for the metering station, and enabling existing staff to work with the new metering station.
July 2008 - December 2010:
Studying Master of electrical engineering.
January 2008 - June 2008 Control engineer & instrumentation
Maintenance control systems at Buzergan oil field terminal, improving and developing the electrical desalters system in Buzergan oil field terminal, maintenance electrical
crude oil heating unit, and superior of operating and maintenance main pumps station.
June 2006 - December 2007 Control engineer & instrumentation
Preparing electrical design and control systems for 3 pumps stations (crude oil pumps) at ( AGS, FKA1, FKA2) degassing stations in Buzergan oil fields - Iraq, establishing all
electrical connections and control signal of the 3 pumps stations, installing control
panels for the 3 stations, operating the pumps, training a 12 electrical technician for operating and troubleshooting the 3 pumps stations.
July 2006 - June 2007 Control engineer and instrumentation
Superior of operating Crude Oil Main Pumps station (6.6kv, 5Mw), and training 16
electrical technician's staff of four shifts for operating, troubleshooting, and maintenance
Main pumps station.
April 2005 - June 2006 Control engineer & instrumentation
Preparing a design of Transformers and switch gear room and control room for crude oil
main pumps station (6.6kv, 5Mw) in Buzergan oil fields - Iraq, installing 2 * 6.6kv
Transformers, switch gear and control room of the main pumps station, establishing all
electrical connections and control signals required to the switch gear room and control
room, establishing the local control wiring of the main pumps motors and pumps, and wiring the local control panels.
South Oil Company:
October 2004 - March 2005 Control engineer & instrumentation
Installing new control system and instrumentation in Al-Halfaya Degassing station/Iraq,
connecting motorized operating valves to the control room, establishing new electrical
control room of the station, and establishing the electrical connections of the new local
control panel to the remote control room.
Profile: 1. Master of Electrical engineering "Electrical mechatronic and automatic control" from University technology Malaysia (Malaysia)
Certified of achieving Intensive English Course at SPACE UTM Institute, Malaysia.
2. B.Sc. in Electrical engineering from University of Baghdad (Baghdad - Iraq)
Diploma of Electrical and Electronic from Baghdad Oil Institute (Baghdad - Iraq)