Sales Engineer
Kimmco-Isover (JV: Alghanim Industries & Saint-Gobain)
Total years of experience :8 years, 10 Months
Sales of Glass wool, Stone wool and Fiberfrax® thermal & acoustic insulation construction materials.
Projects: +2000 Annual Construction, Infrastructure, Renovation, Maintenance, Water, Renewable energy Projects.
Budget: $40 Million / $150 Million annually
Locations: Kuwait, Arab League Countries, African Countries.
My Responsibilities:
Technical Office Work at Kuwait for Projects in Arabic & African Countries:
- Reviewing: tender & shop drawings, BOQs, and reports.
- Developing standard: contracts, specifications, quality assurance, processes, polices, procedures, drawings & forms for upcoming projects.
- Participation in Preparing of estimations, plans, annual budget.
- Approval authority for all engineering projects.
Site Work:
- Frequent site visits to the construction projects (Arabic & African Countries).
- Client Representative for a new branch in “Khaitan Office branch" (Kuwait).
Other:
- Meetings/Coordination with local/international consulting & contracting companies in addition to governmental entities.
- Representative the NGO in international meetings, conferences, exhibitions & awards.
- Interviewing overseas engineers for hiring.
Project: Al-Zour Refinery, the world’s largest grass-root refinery with 615, 000 bpd capacity.
Budget: $4.1 Billion / $16 Billion.
Package: #1 Main Processing Units; Engineering, Procurement & Construction (EPC-0055A).
My Company: International Joint Venture "JV" (named TSHJ). The JV is leaded by Técnicas Reunidas “TR” (Spain), and includes: Sinopec-SEG Engineering Group (China) & Hanwha Engineering and Construction (South Korea).
Client: Kuwait National Petroleum Company (KNPC), & later: Kuwait Integrated Petroleum Industries Company (KIPIC), and both are subsidiaries of Kuwait Petroleum Company (KPC).
PMC: Amec Foster Wheeler & Later Wood
My Responsibilities:
- Working within Construction Site department (Early Civil Work sector), in addition to coordination with planning & procurement departments, for civil activities in interconnecting system (main & secondary pipe racks).
- Issuing Daily Permits for Sub-contractors, with continues direct supervision of progress at site, & with full consideration for: Quality & Safety requirements.
- Preparing & submitting daily report with all activities, manpower, equipment, concerns & next days plan.
Project: Small Boat Harbours Project (Contract:1205050), the project covers marine works (dredging, breakwaters, quaywalls, pontoons, ship lift system), buildings, electrical works, mechanical works, ICT systems (marine and building management systems, telecommunication systems).
Budget: $486.5 Million.
My Company: STFA Construction Group "Main Contractor".
Client: Kuwait Oil Company (KOC).
Consultant: SSH.
Locations: Al-Ahmadi Port (South Harbour), Abu Halifa/Mangaf City (North Harbour) & Al-Ahmadi City (Pre-cast Yard), Al-Ahmadi Governorate, Kuwait
My Responsibilities (Different Durations):
- Working within Buildings department (Construction Site):
As a site engineer for many On-shore, Off-shore buildings, steel structural &
concrete buildings with full consideration of: Quality & Safety requirements. I
was preparing daily work permits as applicant & supervisor (KOC Online &
Manual systems). in addition to Full supervision at site for STFA & subcontractors manpower.
- Working within Technical Office department:
Issuing shop drawing based on tender drawings & Revising tender BOQ.
- Working within Contracts department:
Participation In preparation of some contracts & letter in English & Arabic.
- Working within Planning department:
Preparing 3 months look ahead. And in Participation In preparation of annual
Plan. addition to preparing & submitting daily report for all buildings in North
harbor including all activities, manpower, equipment, concerns & next day’s
plan.
- Working within Procurement department:
Preparing payments of subcontractors & suppliers, in addition to issuing PRs &
POs, managing petty cash for site.
Project: Grand Continental Flamingo Hotel Project.
Budget: $122.3 Million.
My Company: Syrconsult (Consultant)
Client: Sheikh Hamed Bin Khadem Bin Butti Al Hamed.
Main Contractor: Square General Contracting
My Responsibilities:
Technical Office & Construction Site
- Engineering Accreditation Commission (EAC) of Accreditation Board for Engineering and Technology (ABET). - Western Association of Schools and Colleges: Senior College and University Commission (WSCUC).