Total Years of Experience: 28 Years, 10 Months
January 2022
To June 2023
MEP Manager
at ACGC
Location :
Saudi Arabia - Riyadh
KFAA PCA
March 2021
To August 2021
MEP Testing & Commissioning Manager
at Permasteelisa
Location :
Saudi Arabia - Riyadh
KACST
January 2019
To January 2021
MEP Manager
at SALINI SA
Location :
Saudi Arabia - Riyadh
SANG project, 6000 villas with associates and STP.
May 2016
To December 2018
MEP Project Manager
at MINWAL
Location :
Saudi Arabia - Riyadh
Riyadh Metro Stations. Line 03, Stations 3K1, 3 H1 & 3J2. MEP Construction works.
March 2011
To April 2016
MEP Manager
at Drake & Scull
Location :
Saudi Arabia - Riyadh
Assist and coordinate the selection of the key staff required to fill both Technical and Administrative posts and establishing the organization structure of the project with HRD.
•Produce detailed overall Staff / labor requirements for the project under my control.
•Coordinate with planning department to create manpower histogram, activities schedule, and program of work.
•Assist with senior management to prepare project management plan which shall be used as road map to execute the project.
•Manages day-to-day operational aspects of a project and scope.
•Ensure that the client is properly billed and those payments are received in a timely manner for the project.
•Ensure that all contractual and legal matters related to the projects are dealt with properly and promptly, seeking advice and guidance from Senior Manager of Projects as necessary.
•Keep the senior Manager of Projects informed of problems and progress and seeking his assistance on problems which cannot be resolved on Project.
•Ensure the proper conduct of all administrative and man-management roles required by Group policy and local labor laws.
•Monitor, identify, and analyze all project costs with a view of facilitating the completion of the projects at minimum cost and within budget limit.
•Monitor Material Procurement activities for the project under my control and ensure that all materials are submitted, approved, ordered and delivered in accordance with project time schedule.
•Ensure that the project quality system properly and efficiently satisfies the requirements of the Contract.
•Facilitates team and client meetings effectively.
•Holds regular status meetings with project team.
•Maintain an awareness of all potential risks to the company day to day objectives and progress of the works, this applies to commercial risks due to delays, non-performing direct labour, sub-contractors … etc. and or delays by others (3rd parties), observing and adhering to company and QHSE plans.
•Raise Early Warning notices to planning, commercial, senior management in view of any and all perceived delays to general progress of all works.
•Ensure that project team is assisting to provide any variation information to commercial department upon receiving of instruction of project authorized authorities.
•Ensure proper flow of information between all project team.
•Engage with department managers to prepare monthly project manager report in line with company policies.
•Committed to HSE requirements and all applicable legislations and contractual requirements affecting the HSE activities at project site and administrative offices.
•Ensures project documents are complete, current, and stored appropriately.
•Manage project closing out and insure Qualifications.
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
Role: MEP Construction Manager, Duration
•Produce detailed overall Staff / labor requirements for the project under my control.
•Coordinate with planning department to create manpower histogram, activities schedule, and program of work.
•Assist with senior management to prepare project management plan which shall be used as road map to execute the project.
•Manages day-to-day operational aspects of a project and scope.
•Ensure that the client is properly billed and those payments are received in a timely manner for the project.
•Ensure that all contractual and legal matters related to the projects are dealt with properly and promptly, seeking advice and guidance from Senior Manager of Projects as necessary.
•Keep the senior Manager of Projects informed of problems and progress and seeking his assistance on problems which cannot be resolved on Project.
•Ensure the proper conduct of all administrative and man-management roles required by Group policy and local labor laws.
•Monitor, identify, and analyze all project costs with a view of facilitating the completion of the projects at minimum cost and within budget limit.
•Monitor Material Procurement activities for the project under my control and ensure that all materials are submitted, approved, ordered and delivered in accordance with project time schedule.
•Ensure that the project quality system properly and efficiently satisfies the requirements of the Contract.
•Facilitates team and client meetings effectively.
•Holds regular status meetings with project team.
•Maintain an awareness of all potential risks to the company day to day objectives and progress of the works, this applies to commercial risks due to delays, non-performing direct labour, sub-contractors … etc. and or delays by others (3rd parties), observing and adhering to company and QHSE plans.
•Raise Early Warning notices to planning, commercial, senior management in view of any and all perceived delays to general progress of all works.
•Ensure that project team is assisting to provide any variation information to commercial department upon receiving of instruction of project authorized authorities.
•Ensure proper flow of information between all project team.
•Engage with department managers to prepare monthly project manager report in line with company policies.
•Committed to HSE requirements and all applicable legislations and contractual requirements affecting the HSE activities at project site and administrative offices.
•Ensures project documents are complete, current, and stored appropriately.
•Manage project closing out and insure Qualifications.
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
Role: MEP Construction Manager, Duration
March 2011
To April 2013
MEP Construction Manager
Project (Past): “Princess Noura University”, Riyadh.
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
October 2009
To March 2011
MEP Construction Manager
at Drake & Scull
Location :
Saudi Arabia - Riyadh
Report to the Operation Manager and lead a team of Site Engineers and Construction Supervisors and supervise a workforce of 600 + (KAPSRAC). Reported to the Project Manager and controlled a workforce of 200+ (PNU).
•Supervise all construction activities from the concept development stage through construction to final completion assuring fulfillment of construction plans and achievement of delivery & cost targets.
•Manage all resources - people, materials, equipment and budgets assuring optimum utilization and adherence to approved norms.
•Assure compliance with project specifications, approved drawings and international codes in all works executed.
•Coordinate with site & project engineers to estimate and hire required labour force.
•Supervise various trade contractors and ensure completion of works on time and meeting project specifications.
•Enforce all safety rules & regulations assuring safety of company & client assets, personnel and general public.
•Review engineering drawings & specifications, regularly monitor progress, and review daily & monthly reports from site & project engineers and support achievement of plan targets.
•Coordinate with owners, other contractors, trade contractors, vendors, designers & engineers through all phases of the project.
•Prepare periodic progress and status reports for client & management.
•Supervise and motivate workforce and ensure smooth execution of all project tasks.
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
•Supervise all construction activities from the concept development stage through construction to final completion assuring fulfillment of construction plans and achievement of delivery & cost targets.
•Manage all resources - people, materials, equipment and budgets assuring optimum utilization and adherence to approved norms.
•Assure compliance with project specifications, approved drawings and international codes in all works executed.
•Coordinate with site & project engineers to estimate and hire required labour force.
•Supervise various trade contractors and ensure completion of works on time and meeting project specifications.
•Enforce all safety rules & regulations assuring safety of company & client assets, personnel and general public.
•Review engineering drawings & specifications, regularly monitor progress, and review daily & monthly reports from site & project engineers and support achievement of plan targets.
•Coordinate with owners, other contractors, trade contractors, vendors, designers & engineers through all phases of the project.
•Prepare periodic progress and status reports for client & management.
•Supervise and motivate workforce and ensure smooth execution of all project tasks.
•@ “DRAKE & SCULL International”-KSA http://www.drakescull.com
April 2008
To October 2009
MEP Construction Manager
at AL MASHRIQ ELECTROMECHANICAL CO
King Abdullah University of Science & Technology (KAUST), Thuwal, Jeddah, KSA.
•Led the electrical construction team through all project phases - preparation of designs & shop drawings, site establishment, construction, turnarounds and completion on time, within budgets meeting quality standards.
•Monitored and supervised electrical contractors assigned to the project ensuring adherence to schedules & specifications.
•Develop, implement and update project construction schedules & work plans ensuring alignment with targeted project completion date.
•Supervised materials management including planning, procurement, storage and control of material flow in the project.
•Evaluated shop drawings prepared by engineers/designers and assured accuracy of proposed layouts.
•Conducted independent technical reviews of electrical designs to ensure completeness, accuracy and adoption of relevant codes & standards.
•Inspected the sites regularly, determined hold points, highlighted non-compliances and followed up remedial actions.
•Exercised full functional accountability for managing all completions personnel and achieving requirements of the built environment.
•Provided technical support to the supervision team in planning and executing complex tasks.
•Coordinated with planners in implementing required modifications during completion to ensure that the completed systems were as maintenance free as economically feasible.
•Monitored and ensured compliance with all safety rules and regulations.
•Implemented continuous improvement plans including optimum & safe utilization of equipment.
•Led the electrical construction team through all project phases - preparation of designs & shop drawings, site establishment, construction, turnarounds and completion on time, within budgets meeting quality standards.
•Monitored and supervised electrical contractors assigned to the project ensuring adherence to schedules & specifications.
•Develop, implement and update project construction schedules & work plans ensuring alignment with targeted project completion date.
•Supervised materials management including planning, procurement, storage and control of material flow in the project.
•Evaluated shop drawings prepared by engineers/designers and assured accuracy of proposed layouts.
•Conducted independent technical reviews of electrical designs to ensure completeness, accuracy and adoption of relevant codes & standards.
•Inspected the sites regularly, determined hold points, highlighted non-compliances and followed up remedial actions.
•Exercised full functional accountability for managing all completions personnel and achieving requirements of the built environment.
•Provided technical support to the supervision team in planning and executing complex tasks.
•Coordinated with planners in implementing required modifications during completion to ensure that the completed systems were as maintenance free as economically feasible.
•Monitored and ensured compliance with all safety rules and regulations.
•Implemented continuous improvement plans including optimum & safe utilization of equipment.
March 2007
To March 2008
MEP Construction Manager
Headquarters of the Royal Commission for “Jubail & Yanbu”, Riyadh, KSA
and Ha'el Hospital (800 Bids), Ha'el, KSA
•Reported to the Project Manager and led a workforce of 400+. Managed all electrical jobs for the project from conception through execution to completion.
•Supervised the installation, testing & commissioning of electrical systems - substations, power distribution, lighting, lightning protection, panel boards, switchgear, cables and cable trays, fire alarm, SMATV, integrated security system, master clock, public address, LAN & telephony system.
•Reviewed, initiated and executed contracts meeting scope & specification requirements.
•Developed and implemented project execution plans aligned to the overall project schedule.
•Monitored costs and initiated measures to control costs and assure budgetary compliance.
•Prepared material submittals coordinated procurement and followed up with suppliers for on time delivery of materials as per approved specifications.
•Reviewed and approved shop drawings before issue to the construction team.
•Developed project QA/QC plans, inspection & test plans and ensured achievement of all quality goals.
•Coordinated with the HSE team and enforced all safety, health and environmental rules across the site.
•Mobilized manpower and monitored optimum utilization to maintain man-hour costs within budgets.
•Managed design changes including review of technical advances and revision of designs where applicable.
•Provided technical support to the project team in resolving all site related issues.
•Liaised with the client throughout project execution and ensured smooth progress of planned jobs.
•Prepared and maintained complete project documentation.
and Ha'el Hospital (800 Bids), Ha'el, KSA
•Reported to the Project Manager and led a workforce of 400+. Managed all electrical jobs for the project from conception through execution to completion.
•Supervised the installation, testing & commissioning of electrical systems - substations, power distribution, lighting, lightning protection, panel boards, switchgear, cables and cable trays, fire alarm, SMATV, integrated security system, master clock, public address, LAN & telephony system.
•Reviewed, initiated and executed contracts meeting scope & specification requirements.
•Developed and implemented project execution plans aligned to the overall project schedule.
•Monitored costs and initiated measures to control costs and assure budgetary compliance.
•Prepared material submittals coordinated procurement and followed up with suppliers for on time delivery of materials as per approved specifications.
•Reviewed and approved shop drawings before issue to the construction team.
•Developed project QA/QC plans, inspection & test plans and ensured achievement of all quality goals.
•Coordinated with the HSE team and enforced all safety, health and environmental rules across the site.
•Mobilized manpower and monitored optimum utilization to maintain man-hour costs within budgets.
•Managed design changes including review of technical advances and revision of designs where applicable.
•Provided technical support to the project team in resolving all site related issues.
•Liaised with the client throughout project execution and ensured smooth progress of planned jobs.
•Prepared and maintained complete project documentation.
January 2003
To March 2007
Senior Project Engineer
at JAL INTERNATIONAL CORPORATION, KSA
Location :
Saudi Arabia - Jubail
Project: ARAMCO & SABIC projects.
•Reported to the Project Manager and led teams of up to 80 in managing assigned projects ensuring completion on time and within budgets.
•Managed projects for engineering, procurement, installation, testing and commissioning of electrical systems - power transformers, switchgear panels, and MV/LV power panels, MCC panels, UPS, BMVS, fire protection systems, lighting systems and earthing systems.
•Supervised all field works for installing cable trays & cables, substation works and structural steel works.
•Executed several projects involving new installations and revamping jobs for clients like Saudi Aramco, SCECO, SABIC and SAMREF.
•Reported to the Project Manager and led teams of up to 80 in managing assigned projects ensuring completion on time and within budgets.
•Managed projects for engineering, procurement, installation, testing and commissioning of electrical systems - power transformers, switchgear panels, and MV/LV power panels, MCC panels, UPS, BMVS, fire protection systems, lighting systems and earthing systems.
•Supervised all field works for installing cable trays & cables, substation works and structural steel works.
•Executed several projects involving new installations and revamping jobs for clients like Saudi Aramco, SCECO, SABIC and SAMREF.
January 2001
To January 2003
Superintendent
at AL QORS ESTABLISHMENT, KSA
Supervised electrical installations in buildings, palaces & factories. Designed, installed, commissioned and maintained electrical systems like lighting systems and telephone & fire alarm systems. Supervision of installation of power cables from substations to the premises of clients.
•@ KAWTHARANI CO FOR GENERAL CONTRACTING, (Lebanon) Executive Engineer, from 2000 until 2001 - Executed works related to new installations, rehabilitation & repairs of electrical networks, transformer substations, diesel generators, water filtration systems for residences, factories and air bases.
•@ KAWTHARANI CO FOR GENERAL CONTRACTING, (Lebanon) Executive Engineer, from 2000 until 2001 - Executed works related to new installations, rehabilitation & repairs of electrical networks, transformer substations, diesel generators, water filtration systems for residences, factories and air bases.
January 1998
To January 2000
Chief of Staff
at AL MABANI CONTRACTING CO, Mecca KSA
Led a large staff in setting up modern tents for pilgrims. Works included fireproofing, air conditioning and lighting. Installation power cables from substation to control & operation cabinets.
January 1996
To January 1998
Lebanon
at ELECTRICITé DE FRANCE
Looked after repair & rehabilitation of electric networks. Inspection transmission lines and control & protection equipment determined and rectified breakdowns. Check at site consumer violations.
January 1995
To January 1996
Assistant Manager
at BOUYGUES
Location :
Lebanon
Executed jobs for installation, rehabilitation, maintenance and repairs of electric power networks and transformer stations. Install power transmission lines, control panels.
Share on Facebook
Share on Twitter
Share Via Email