Hazem Hosni, Assistant Resident Engineer

Hazem Hosni

Assistant Resident Engineer

WS Atkins & Partners Overseas

Location
United Arab Emirates - Abu Dhabi
Education
Diploma, Project Management Professional (PMP)®
Experience
35 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :35 years, 4 Months

Assistant Resident Engineer at WS Atkins & Partners Overseas
  • United Arab Emirates - Abu Dhabi
  • My current job since March 2015

• Monitor the actions on site of the Contractor(s) against the project specification and drawings and immediately notify the Resident Engineer of any non-conformities
• Direct the Site Inspectors in their daily duties.
• Liaison with and coordinate with all technical disciplines.
• Attend Site Technical Coordination Meetings to discuss Contractor(s) submissions, Shop Drawings and construction related matters.
• Keep, monitor and follow up as necessary and complete records concerning the execution of the works
• Preparation of Monthly Reports on the status of the project.
• Carry out the final inspection for certification of final completion and handing over of the works
• Monitor the progress of the work against the approved contractor programme of works
• Review the site progress and review of the contractor’s interim payment application
• Ensure that safety measures on site are adequate. Advise on measures to be taken in order to protect the property and lives in and around the site and inform the Contractor(s).

Senior Project Engineer at Six Construct Ltd. (Besix Group Belgium)
  • United Arab Emirates - Dubai
  • May 2014 to February 2015

Dubai Water Canal - Infrastructure (Canal & Coastal Works) Package 3 R999/3
Project Description:
Construction of a new 3.2 km long waterway including associated utility diversion works such as bank protection to canal mainly of precast mass concrete gravity type quay walls and a small part with diaphragm wall. Construction of break water, beach and standalone groyne shelter, 6 nos. of water taxi stations. Highway modifications, utility diversion and protection of existing services. (Project Value = 800Million AED)

1) To handle the procurement activities that meets the Project requirements, according to Company policies and procedures.
2) To review / study technical Specification, BOQ (Bill of Quantity), schedule plan and Drawings to extract the enquiry of packages
3) Finding Qualified suppliers and sub-contractors suitable for the job
4) Send Invitation & RFQ with inquiry documents to suppliers and sub-contractors and meet them to reply to their queries and clarify the scope of package’s work
5) Liaising with suppliers and sub-contractors to clearly answer their Technical inquiries and ensure that they are aware of the business’ objectives
6) Reviewing quotations of identified technical and commercial specifications received from the suppliers and sub-contractors.
7) Building strong working relationship with suppliers and sub-contractors and negotiate with them their quotation such as price, excluding item, warranty and payment terms
8) conducting research to ascertain the best products and suppliers in terms of best value, delivery schedules and quality
9) Ensuring timely and cost effective procurement for all steps of package via competitor, strategic analysis and market reflective
10) Techno-commercial evaluation and preparation of comparative statements and Submit to high management
11) Including recommendation showing personal view and impression of their obligation, obviousness, past performance works and Technical capability

Package Manager at Six Construct Ltd. (Besix Group Belgium)
  • United Arab Emirates - Abu Dhabi
  • April 2011 to May 2014

Cleveland Clinic Hospital Abu Dhabi - UAE
Project Description:
Construction of a 1, 000 bed Clinic, a Car park & technical buildings, totalling a built-up area of 400.563 m², on 3 podium levels + 22 levels, height of the building: 135 m. This is a mixed structure concrete/steel. FF&E and a part of IT Equipment are included. (Project Value = one billion Euro)

• Working in Partitions and Ceiling Works (Drywall, Acoustical Ceiling Tiles, Laminated Frosted Glass Ceiling, Gypsum Board Ceiling, Perforated Metal Ceiling, Wooden Ceiling
• Coordinator of Interior and exterior Paint, Wall protection, Rollers Blinds, Internal Signage and wall covering
• Studying technical data sheet (TDS) of material to comply with project specification and project budget.
• Preparation and reviewing the material submission and acquire approval from consultant.
• Schedule the procurement of material (requisition, LPO, shipment, material delivery) as per project schedule and site need.
• Lead and Coordination workshop between client, consultant and subcontractor discussing the required specification of scope and package
• Scrutinizing method statements submitted from Subcontractor as per the specification requirements.
• Checking shop drawings submitted from Subcontractor as per the specification requirements and design drawings
• Reporting weekly Package progress Status for every package
• Calculate the manpower need for planned progressed work and compared with actual
• Analyzing all data and information to Formulate S-Curve to follow up the progress on site and compare it with baseline

Senior Project Engineer at Six Construct Ltd. (Besix Group Belgium)
  • United Arab Emirates - Abu Dhabi
  • December 2009 to March 2011

Al Mafraq Hospital-package 1(Enabling Works) - UAE

• Meeting with the client and consultant discussing the required specification of materials and the alternatives proposed
• Procuring the material as the requirement of project specification of project and the Budget of the materials
• Responsible for the preparation of inquiries and purchase orders.
• Coordination with Site for the required Materials needed.
• Preparation of material’s submittal including material delivery.
• Preparation of variation orders.
• Review of suppler quality against contract requirements and material certificates
• Organize quality control inspections on site & off site and Monitor all quality related activities on the project
• Propositioning requests for information (RFI) to consultants proposing solution site problem and following it up
• Reporting weekly and monthly Report
• Preparation monthly progress claims of executed work.
• Prepare and submit the method statements for site activations in cooperation with consultants and following the specifications.
• Meeting with the Engineer or the Management to solve the Technical problem
• Preparing and submitting concrete shop drawings as per the specification requirements and design drawings
• Prepare contracts (LOA) and negotiate revisions, changes and additions to contractual agreements with suppliers and subcontractors.
• Obtain all necessary permits and licenses from ADM and government department

Senior Civil Engineer at Six Construct Ltd. (Besix Group Belgium)
  • United Arab Emirates - Abu Dhabi
  • March 2008 to December 2009

YAS Island - Ferrari Experience - UAE

•Preparing and reviewing the bar bending schedules for steel reinforcement and Ordering the steel as per site requirements and Plan schedule
•Preparing and submitting concrete shop drawings as per the specification requirements and design drawings
•Rise requests for information (RFI) to consultants and follow up it
•Submit Field change notice (FCN) to site and Engineer to solve problem in site or cover NCR
•Sending notice of any field change to Q.S. for variation order submittal.
•Prepare and submit the method statements for site activations in cooperation with consultants and following the specifications.
•Meeting with the Engineer or the Management to solve the Technical problem

Senior Coordination Engineer at Al Hamed Development & Construction L.L.C.
  • United Arab Emirates - Abu Dhabi
  • August 2004 to February 2008

•Checking shop drawings / coordination drawings, & acquire the consultant approval.
•Studying and acquire approval for submittal of method statements, materials and sub-contractor
•Co-ordination with sub-contractor to chase progress and meet the client's deadline.
•Supervision of sub-contractor’s technical works to get work as project’s specification
•Monitoring the purchase orders with the procurement department and checking the delivery material
•Finalizing any required permits such as (Traffic Department, Municipality, etc.)
•Preparing the snag list for Initial & final Handing Over.

Civil Engineer in the Technical Design office at J.V. Besix - Orascom
  • Egypt - Cairo
  • May 2000 to July 2004

•Preparing and reviewing the monthly interim & final payments (Client & Sub-contractors)
•Studying and acquire approval for variation works due to any changing between Tender drawing and actual field design
•Updating the time schedule of work execution
•Preparing detailed cost control reports
•Designing the installation of all steel structures
•Preparing "cut and bend" to the steel reinforcement workshops
•Monitoring up the progressing of suppliers & subcontractors

Civil Engineer in the Technical Design office at Campenon Bernard- SGE joint venture, Greater Cairo Metro, Line 2 (French Company)
  • Egypt - Cairo
  • September 1995 to April 2000

•Preparing formwork drawings with respect to guide drawings issued by the mother company in France
•Revising reinforcement details & bars list
•Verifying subcontractor shop drawings
•Coordinating between the design subcontractor, the workshop & the site
•In case of any problems, I take the necessary rectifying action

Project Leader at TRANSCAD LIMITED Company (Canadian Company)
  • Egypt - Cairo
  • January 1992 to June 1995

* Supervising a group of 5 Autocad Engineers
* Document control.
* Schedule follow-up.
* Responsible for the final check-up for all the drawings of the project.

Site Engineer at TNSR Company for construction
  • Egypt - Cairo
  • May 1991 to January 1992

* Execution Engineer.
* Responsible of quantity survey.
* Preparing the monthly invoices to the client.
* Final taking over to the consulting.

Consulting Engineer at The Great Project Administration for Armed Force
  • Egypt - Cairo
  • October 1988 to March 1991

•Inspection of quality control during execution at different stages of construction to the finishing stages
•Following up all the stages of construction for civil work including excavation, waterproofing & reinforced concrete.
•Inspection, review and approval of all site activities in accordance to approved method statement & shop drawings

Education

Diploma, Project Management Professional (PMP)®
  • at Project Management Institute
  • January 2012
Bachelor's degree, Bachelor of Engineering, Civil department
  • at Faculty of Engineering Shoubra, Zagazig University
  • May 1988

Project in steel construction Grade : "very good".

Specialties & Skills

Procurement
Materials
Waterproofing
Inspection
AutoCAD 2000
Auto lisp
Microsoft Excel
Microsoft Word
Primavera
PhotoShop
power point
Internet

Languages

Arabic
Expert
English
Intermediate
French
Beginner

Memberships

El Zamalk Club for sports
  • member
  • August 1975
UAE driving license
  • Valid
  • April 2005
Project Management Institute (PMI)
  • member
  • January 2012
Egyptian syndicate of Engineers
  • Memberships
  • June 1988
Wadi Degla Club
  • Memberships
  • August 2012

Training and Certifications

Mini Master in Business Administration Certificate (Training)
Training Institute:
Warnborough College UK.
Date Attended:
April 2013
Duration:
66 hours
Project Management Professional (PMP)® (Certificate)
Date Attended:
January 2012
Valid Until:
January 2018