Heba Al-Gebaly, Architectural Trades Manager (Qatar Stadium Expert )

Heba Al-Gebaly

Architectural Trades Manager (Qatar Stadium Expert )

QDVC

البلد
قطر - الدوحة
التعليم
بكالوريوس, Architectural Engineering
الخبرات
15 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 11 أشهر

Architectural Trades Manager (Qatar Stadium Expert ) في QDVC
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2015

QDVC ( Qatari Diar JV VINCI Construction Grands Projets )

Lead Packaging Engineer for the Tender, commercial, Technical (design ) and construction management of Qatar stadiums to be built for 2022 World Cup.

Supplier Management :
Accountable for the interface between suppliers and projects regarding their performance management, delivery coordination and dispute resolution issues. This included the offline management and influencing of several key framework suppliers and the development of performance management and workload award tools.

Head of estimation and marketing Divisions في Profession Alum. Company ( UCC & KCT Comapnies )
  • قطر - الدوحة
  • أبريل 2013 إلى مايو 2015

From April 2013 until Now: work at ( Profession Aluminum company Sister
company To UrbaCon Trading & Contracting UCC & KC T In Doha, Qatar) as

Estimation and marketing Manager)

ISO Management representative for Profession Alum. Company


Estimation manager Job Description:
• Job Description in Profession Alum. Company:
1) Estimating all projects and made contracts to the company even estimate tender drawings too.
2) Arrange the procurement and prepare the purchasing
request (PR) also arrange the sub-contract agreements.
3) Assisting Marketing Manager in coordinating various
integrated Communication and marketing activities.
4) Prepare the project Price Quotation in accordance to the project specification in the pre-contract phase, and
sometimes in the post-contract phase in coordination with marketing manager.
5) Interfacing with Counterparts and building up relationships with them at marketing supplier
6) Developing and maintaining sales proposals and Collateral
(Sales Quotation)
7) Desktop Publishing, rate cards, newsletters, brochures & many other materials related to marketing.
8) Supervising the production or implementation of marketing materials, developing lead generation plans with targets, measures & objectives
9) Attend meetings with contractors & project manager.
10) Handle site visits if required.

Marketing Manager Job Description:

• Position purpose and objectives:
The main purpose of the Coordinator role is to lead and manage projects
coordination tasks effectively, and to ensure that they are delivered on time and agreed quality standards. The role also requires the Coordinator to contribute and
develop the workflow for the project among departments and sites.

COMMUNICATIONS AND WORKING RELATIONSH IPS
• Internal cross working relation: Design, operation, factory, planning, material & purchasing.
• External working relations: contractors, owners & consultant

Assistant Operation Director ( Project manager ) في WDEPC Alexandria Branch
  • مصر - الإسكندرية
  • يناير 2012 إلى أبريل 2013

o From January2012 until April 2013: work at (WDEPC company, In
Alexandria Branch) as Assistant to Operation Director for:
- Abu Qir Thermal Power Project (Unit 6&7) - 2x650MW Gas/Oil
Fired with WDEPC company as Owner, Orascom construction company As a
contractor, Arab contractor company As a contractor, Siemens Company As a
contractor, MITSUBISHI company As a contractor, EL ABD Company As a
contractor, ANSALDO As a contractor, PGESCO company as Consultant.

Assistant operation director ( Project manger ) في Alico Egypt Company
  • مصر - الإسكندرية
  • أبريل 2009 إلى يناير 2012

Design, Interior Design& Working Drawings)
o From April 09 until January2012: work at (Alico Egypt Company, In
Alexandria Branch) as (Assistant to Operation Director) for:
• Borg El-Arab International Airport Project with Orascom
Construction Company As a contractor, Japan airport consultant
(JAC), Engineering Consultant Group (ECG) & Netherlands Airport
Consultant (NACO) with Arab republic of Egypt -Ministry of civil
aviation -Egyptian airport Company as the Client

• Marassi Beach club Project, Marassi Villas &Town Home Project
& Marassi Main Gate Project with Emaar Misr (Egypt) as the owner,
E.C.G as the consultant & with Contrack International Construction
Company - Egypt as the main contractor.

• Marassi Power Villas Project with Emaar Misr (Egypt) as the owner, with Power Egypt Company as a main contractor & ECG as a consultant

• Marassi Villas & Town homes Project with Emaar Misr (Egypt) as a
The owner & with Contrack International construction company - Egypt as a
Main contractor

• Marassi Catania village ( Buildings) Project with Emaar Misr
(Egypt) as a The owner & with Orascom Construction Company as a Main
contractor

• OT Sphinx ( Orascom telecom Building) project with Orascom
Construction Company as a contractor at (smart village in Cairo)

• Tennis club project (Tourist Resort) Project - at Algeria with CCC
Company as a Contractor & With Horizon Company as a sub-contractor.

• Terga project (Electricity Company) Project - at Algeria with
Orascom Construction Company as a contractor & Horizon Company as a
sub-contractor


• Marassi Villas & Town homes Project with ASGC Al Shafar for real estate investment And General contracting S.A.E. --Dubai as main
contractor.

• • Jollie Ville Hotel project In Alexandria with Ramada Hotel as the Owner
• Pencilline Factory at Abu Sultan, Ismailia at Egypt with Medical
union pharmaceuticals -MUP as the Owner & ECG -
ENGINEERING CONSULTANTS GROUP S.A. as the consultant

• Center for Technological Services of Egypt Post Tower Building -
- MB3 (Cairo, Egypt) Project with Orascom Construction Company as a
contractor & ECG - ENGINEERING CONSULTANTS GROUP S.A. as the consultant.

• Chambers of Commerce tower Project with Detac as the main
contractor

• Housing and development Tower Building Bank ( cairo, Egypt)
Project with Orascom Construction Company as a contractor

• Living In Office Buildings ( cairo, Egypt) Project with Orascom
Construction Company as a contractor

• National Bank of development Tower Building ( cairo, Egypt)
Project with Orascom Construction Company as a contractor, ASHRAF
Sadek Associates Design Consultant & NBD Bank (Owner)

• El Dabaa Pump Station & El Hammam Pump Station with
Orascom Construction Company as a contractor

• MIVIDA office Park Project with ASGC Al Shafar for real estate
investment And General contracting S.A.E as main contractor & OKO
plan Architect.

• Hurghada International Airport Terminal Building & landside
Facilities Project with Arab republic of Egypt -Ministry of civil aviation
-Egyptian airport Company as the Client, Dar El Handasa Shair & Partners as the Main Consultant & Saudi Binladin Construction
Group SBG as the Main Contractor.

Gulf pioneers consultant ( Architectural designer ) في Lootah
  • الإمارات العربية المتحدة
  • أكتوبر 2008 إلى أبريل 2009

o From October 08 until April 09 work at (Gulf pioneers consultant, Lootah
Group of companies, in Dubai) individual Work private villas (Architecture

office Engineer "Interior & Exterior Designer " for housing and public في El-LAITHY Group Co
  • مصر - الإسكندرية
  • يوليو 2008 إلى أكتوبر 2008

o From July 08 until October 08 work at ( El-LAITHY Group Co. in Egypt) as office Engineer "Interior & Exterior Designer " for housing and public
Buildings

الخلفية التعليمية

بكالوريوس, Architectural Engineering
  • في Alexandria university
  • يوليو 2008

Specialties & Skills

Architecture
Project Management
Marketing
Project Estimation
Business Communications
AIRPORT TERMINAL
AVIATION
GENERAL CONTRACTING
INTERIOR DESIGN
MITSUBISHI
PLANT DESIGN
PUMP STATION
SIEMENS
TELECOM

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
مبتدئ

التدريب و الشهادات

Contract Basis ,FIDIC Forms, Claims & arbitration (تدريب)
معهد التدريب:
at Edutec center ( doha ) at November 2013
تاريخ الدورة:
November 2013
المدة:
30 ساعة
Business Communication Course (تدريب)
معهد التدريب:
New Horizon Center in Doha
تاريخ الدورة:
August 2013
المدة:
28 ساعة