Hector Bandija, Civil Construction Engineer

Hector Bandija

Civil Construction Engineer

Self Employed

Location
Qatar
Education
Bachelor's degree, Civil Engineer
Experience
35 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :35 years, 3 Months

Civil Construction Engineer at Self Employed
  • Philippines
  • My current job since March 2016

• Coordination meeting with the client ~ Estimation of all materials, equipment, tools needed for the project ~ Prepare Bill of Materials (BOQ) ~ Submissions of tender/proposal & attachments such us bar chart with s-curve, pert CPM, Primavera ~ technical meetings with the client for approval of the project ~ Procurement for daily materials, equipment and tools require ~ Supervision co-ordination with production team and proper man power monitoring ~ Prepare accomplishment report and billing ~ Prepare cost variation of the project ~ Prepare weekly payroll and inventory ~ Perform all documentations for work acceptance

Civil Engineer at Al Jaber and Makhlouf WLL
  • Qatar - Doha
  • July 2015 to February 2016

• Team Leader for four (4) AutoCAD Operator.
• Prepare program of work for every auto cad operator.
• Daily supervision and give instruction for the priority scope of work.
• Prepare shop drawing needed for the entire infrastructure road development project.
Topographical Survey Plan ~ Road Layout Plan ~ Road Profile Plan ~ Road Setting Out Plan ~ Spot Levels Layout Plan ~ Pavement, Kerbing and Footpath Layout Plan ~ Road Markings and Signs Plan ~ Grading Plan ~ Traffic Signal Layout Plan ~ Street Lighting Layout Plan ~ Surface Water Layout Plan ~ Treated Sewer Effluent Layout Plan (TSE) ~ Foul Sewer Plan ~ Qatar Telecommunication Layout Plan (QTEL) ~ Qatar Armed Forces Layout Plan (QAF) ~ Intelligent Transportation System Layout Plan (ITS) ~ Security Surveillance Department Layout Plan (SSD) ~ Low Voltage (LV Layout), (MV Layout), (HV- Layout) ~ Water Services layout Plan ~ traffic diversion plan ~ Landscape ~ Plan for billing attachment.
• By AutoCAD civil 3D prepare road alignment and grade profile.
• By AutoCAD civil 3D prepare change order of plan and profile.
• Technical co-ordination meeting with the utility departments, survey department.
• Submissions & technical meetings with the ministry (ASHGHAL) and consultants.

Project Engineer at UCO Engineering WLL
  • Bahrain - Manama
  • June 2014 to July 2015

• Prepare program of work, Primavera, Bar Chart & S-Curve
• Estimates of all scope of work of the project base in the approved plan.
• Estimate for manpower, equipment and tools needed for the project.
• Prepare bill of materials of the project.
• Prepare proposal and tender and all attachments
• Daily procurement of materials needed of the project.
• Project site supervision of the road reheat asphalt recycle project.
• Technical co-ordination meeting with production team and man power monitoring.
• Daily site proper monitoring as per the project plan.
• Perform checking all scope of works for weekly accomplishment report and inventory.
• Prepare variation to contract cost.
• Prepare cost analysis regarding progress made.
• Check and settle invoices submitted by supplier in accordance agreed approved cost.
• Perform check the coring test for new pave asphalt and the existing road asphalt.
• Perform road regularity test by traveling beam, done together with the consultant.
• Perform all documentations such as daily work acceptance, etc.
• Project submissions & technical meetings with the client, ministry and consultants.
• Prepare traffic diversion plan.
• Proof of my occupation as manager, Original Bahrain visa attach in my passport.

Civil Engineer at Majed Rashed Al Jarboo Establishment (Abha, Saudi Arabia)
  • Saudi Arabia - Abha
  • November 2006 to June 2014

• Establish Control Points approved by the consultant.
• Make topographical survey with complete details.
• By Civil 3D prepare plan for road alignment and grade profile. Make a road design with the data topographic survey come from the surveyor. Make a plan with road alignment and this show the offset for left and right end of asphalt and the end of shoulder and show also the contour lines, show station label for every 25 meters and also show curve details including the transition curve detail needed for the computation of super elevation. This shows the grid line for northing and easting every 200 meters.
• By Civil 3D prepare plan for grade profile of the road. This show the natural ground level for every 25 meters and also show the road profile grade level for every 25 meters. This show the grade profile line with corresponding grade profile percentage and the natural ground line. This also show the details of vertical curve such as point of vertical intersection with corresponding station and level, also show the length of the vertical curve with corresponding station and level and also show the datum level. These also show the details of the culvert, bridges.
• By Civil 3D prepare plan and computation of road right of way (15 mtrs from centerline). Make a plan of road right of way for every lot owner. This plan shows the computation of the area of the right of way for every lot owner base on the survey. The plan of road right of way will be submit to the consultant and ministry.
• By Civil 3D prepare change order of the plan and profile. Make a plan and profile show the changes due to some problems and obstruction in actual application of the road project. The plan and profile with changes must be approved by the consultant and the ministry.
• By Civil 3D prepare plan for electrical obstruction. Make a plan for electrical obstruction and show also the new location of the new electrical line and electrical pole. This electrical plan is approved by the consultant and gives to the electrical company to change all electrical obstruction.
• By Civil 3D prepare plan for House obstruction. Make a plan for house obstruction base on the actual survey. This show the computation of the area, the owner submit this plan to the ministry together with the registration of the lot, pictures and other documents need to submit, and the government arrange the transfer of the house.
• By Civil 3D prepare plan for culvert and bridges location. Make plans for culvert and bridge location of the road project. Location of culvert and bridges is established by hydraulic engineer from the ministry. This plan show the exact location with skew of the culvert and bridges.

Civil Engineer at Self Employed
  • Philippines
  • October 2001 to October 2006

• Project planning ~ Coordination meeting with the client ~ Estimation of all materials, equipment and tools needed for the project ~ Prepare Bill of Materials (BOQ) ~ Prepare Project Program of works ~ Project submissions & technical meetings with the client ~ Procurement for daily materials, equipment and tools require ~ Supervision co-ordination with production team and proper man power monitoring ~ Prepare accomplishment report and billing ~ Prepare weekly payroll and inventory ~ Perform all documentations for work acceptance, etc.

Civil Engineer / Building Maintenance at Everlight Chemical Industrial Corporation
  • Taiwan
  • September 1998 to September 2001

• Supervision of civil work repairs such as ~ Building retaining walls and other related jobs ~ Cladding and decorative painting (beatification works) ~ Plumbing fixture, sewer, water heater and sprinkler ~ All high pressure plumbing and sanitation ~ Electrical power line and electrical fixture (cables and towers) ~ H.V.A.C. - works executed ~ Roof - slabs and High tensile sandwich sheets ~ Repair and cleaning of gas and chemical tank.

Project Engineer at Acro Industrial Development and Construction Corp
  • Philippines
  • January 1989 to August 1998

• Project Planning ~ Prepare program of work for the project ~ Prepare bill of materials (BOQ) ~ Projects Planning and Office Management and sales team ~ Technical co-ordination with production team and man power monitoring ~ Project submissions & technical meetings with consultant ~ Daily supervision and instruction to engineer, crew base on priority scope of works ~ Daily follow up of materials procurement to deliver at site as per program ~ Prepare daily materials inventory ~ Prepare estimation of concrete pouring request ~ Prepare weekly accomplishment report of all scope of work ~ Check accomplishment report base on the bar chart to minimize slippage ~ Prepare daily weather report ~ Perform daily site inspection ~ Prepare weekly payroll ~ Prepare weekly equipment and tools inventory.

Education

Bachelor's degree, Civil Engineer
  • at Holy Name University
  • March 1988

Bachelor of Science in Civil Engineering Graduate

Bachelor's degree, Civil Engineer
  • at Holy Name University
  • March 1988

Bachelor of Science in Civil Engineer Graduate

Specialties & Skills

Estimation
Cost Engineering
Cost Estimating
Quantity Surveying
civil engineer
Surveyor using Total Station
AutoCAD Civil 3D
MICROSOFT WORKS
Project Management
AutoCAD Draftsman
Project Planning
Civil Engineer
Bar Chart & S-Curve (Cost Control)
Primavera P-6

Social Profiles

Languages

English
Expert
Tagalog
Native Speaker
Arabic
Intermediate

Training and Certifications

Initiative Certification (Certificate)
Date Attended:
April 2000
Saudi Council of Engineer (Certificate)
Date Attended:
November 2013

Hobbies

  • Playing Basketball
  • Reading