Senior Quantity Surveyor Engineer
hill international
Total years of experience :16 years, 7 Months
Working on Variation Orders and CVOR`S.
• Preparing BOQ for the project.
• Preparing cost estimate and study for project.
• Revising for all tender drawing and specification before tendering.
Current Project: consolidate and develop leverages in the way of Alexandria-Matrouh
Owner: The executive body for drinking water and sanitation
Consultant: EGEC
Period :From august 2013 till present
Project description: Implementation of 6 giant cranes to clean drinking water. And the areas of the El Hamam and El Alamein and Sidi Abdel Rahman and Fukah and DABAA a total cost of 450 million pounds to improve the pumping drinking water to those areas, and increase the ability to absorb the production capacity of the second phase of the water purification plant drinking flags, which will be 320 thousand cubic meters per day to meet the expansions Urban and new tourist area of north-west coast of Marsa Matrouh.
Implementation of sea water desalination plant area of Sidi Abdel Rahman card 12 thousand cubic meters at a cost of 84 million pounds.
Work description:
Quantity survey engineer for all projects including all items.
Working on Invoices for all subcontractors and for the company itself.
-Follow progress of site work.
Forth project: MARASSI RESORT . SIDI ABDEL RAHMAN
Position: CO-ORDINATOR .
Position: Senior Quantity Survey engineer.
Owner: Emaar
Consultant: Engineering Consultants Group (ECG).
Period: from September 2011 till present.
Location: Km 125, Alex. Matrouh Desert Rd. Sidi Abdel Rahman, North Coast
Project description: A 6.25 million square meter resort containing villas and townhomes with all associate infrastructure in addition to a sporting club, dancing clubs, cafes, swimming pools and spa .
Work description:
-Quantity survey for all building containting all finishing items.
-Follow progress of site work.
-Preparing all materials IR and following it with site work.
Third project
Position: Technical office engineer.
Project: REFURBISHMENT OF CHILDREN'S CANCER HOSPITAL SECTION AT ALHELAL HOSPITAL IN TANTA.
Owner: Cancer Hospital Foundation (CCHF).
Consultant: Engineering Consultants Group (ECG).
Period: from September 2010 to September 2011.
Location: Tanta
Project description: refurbishment of children cancer hospital at al helal hospital by taking 4 floors and build a new sections for the new hospital containing new equipments and machines for the new hospital needs.
Responsible for:
Preparation for workshop drawings.
Preparation for as built drawings.
Second project:
From August 2008 to May 2010
Position: Technical office engineer.
Project: Borg El Arab International Airport Modernization Project.
Owner: Egyptian Airports Company (EAC).
Consultant: Japan Airport Consultant (JAC), Netherland Airport Consultants (NACO), and Engineering Consultants Group (ECG).
Period: from August 2007 to May 2010.
Location: 40 km (25 mi) southwest of Alexandria, in Borg El Arab
Project dicribtion: Borg El Arab Airport had a major expansion in terms of the airport's passenger and cargo handling capacity in response to growing demand and the new facilities were inaugurated in 2010.
Quantity survey engineer for all projects including all items-
Working on Invoices for all subcontractors and for the company itself.
- architecture shop drawing for buildings and retaining walls in Hacienda Project
67% good grade