هشام فاروق خلف هندي, Deputy Project Manager & Senior Civil Engineer

هشام فاروق خلف هندي

Deputy Project Manager & Senior Civil Engineer

ECG Engineering Consultants Group S.A., Qatar Branch.

البلد
قطر
التعليم
دكتوراة, DBA: Doctor of Business Administration
الخبرات
22 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 5 أشهر

Deputy Project Manager & Senior Civil Engineer في ECG Engineering Consultants Group S.A., Qatar Branch.
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أبريل 2013

Duties include daily assisting in construction management and supervision by directing the team to ensure the required quality and completion of the project according to the specified schedule. This involves setting ECG responsibility for site operations based on the ECG manual and project contract, and acting as the primary interface between the client and contractor.
Additionally, responsibilities include:
1. Daily monitoring of the contractor's work, procedures for building construction, infrastructure (such as main networks and associated utility buildings), roads, and hard and soft landscaping.
2. Implementing and overseeing a safety and quality control program, ensuring that the contractor adheres to project contract requirements.
3. Studying the project contract documents and drawings before construction commences.
4. Daily monitoring, reviewing, and approving contractor's submittals, including shop drawings, technical data sheets, and Requests for Information (RFIs) issued by contractors.
5. Approving or rejecting contractor's submittals based on tender drawings and contract specifications.
6. Providing guidance to the contractor in overcoming technical problems.
7. Reviewing and commenting on material and equipment submittals, identifying any design items that may adversely affect the facility's operation, and seeking early remedies to such issues during the construction phase.
8. Reviewing and approving as-built drawings for final approval.
9. Studying and providing comments on contractors' claims.
10. Led team meetings to assess project progress and plan appropriately to meet delivery targets.
11. Generated weekly and monthly status reports for helpful progress tracking.
12. Conferred with engineering staff and other personnel to identify and resolve problems with design or implementation.
These duties apply to the following projects:
▪ Doha 2024 FINA World Championships & World Masters Championships.
▪ New Naval Base project (NNBP) - Buildings and Infrastructure.
Construction of New naval base buildings and infrastructure such as main networks (wet utilities) and blocks infrastructure networks and associated utility buildings, Infrastructure work shall include the following items:
1. Networks
2. Utility Buildings:
3. Civil Work
▪ Development of Internal Security Force (ISF) Camp at Duhail- The Officers' Club and Shooting Range (CPC‐07e).
▪ Development of Internal Security Force (ISF) Camp at Duhail-Health Center Care-(CPC - 06).
▪ Doha Live Project at Doha - Qatar “Lifestyle hotel and boutique retail experience”.
▪ Al Asmakh Heritage Buildings at Doha - Qatar
▪ JW Marriot Doha - Qatar.
▪ Six (6) New Schools - Package 4 - Qatar.
▪ Construction of Ten (10) New Schools in Doha - Qatar.

Senior Structural Engineer (Technical Office Engineer) في ECG Engineering Consultants Group S.A., Cairo, Egypt.
  • مصر - القاهرة
  • سبتمبر 2009 إلى مارس 2013

Studying the project contract documents and drawings before construction commences, daily monitoring of reviewed and approval of contractor's submittals including shop drawings, technical data sheets, and RFI's issued by contractors, approving or rejecting contractor's submittals according to tender drawings and contract specifications, advising the contractor to overcome technical problems, checking and commenting on material and equipment submittals and identifying any item of the design, which my adversely affect the operation of the facility and seeking out a remedy to the problem early in the construction phase, reviewing and approving as-built drawings for final approval by the Construction Manager as well as studying and giving comments on contractors claims for the following project:
▪ Etisalat Misr New Premises - Smart Village.
▪ Mega Investments New Office Building - 6th Of October City.
▪ Hyde Park - New Cairo.
▪ Children's Cancer Hospital Section at Al Helal Hospital - Tanta.
▪ Royal City Compound - 6th of October City.
▪ Universal Group Administrative Office Building - 6th of October City.
▪ Oriana Villas, Cairo Festival City - New Cairo.
▪ El rehab Quality Control Supervision, El rehab City - New Cairo.

Designer Structural Engineer في Building Agency in Ministry of Education, Al-Riyadh, Kingdom of Saudi Arabia (KSA).
  • المملكة العربية السعودية - الرياض
  • مايو 2007 إلى أغسطس 2009

Duties included Structural design of buildings in the ministry, Revision, and approval of the structural design of buildings submitted by the Consultants Office for the following project:
▪ Many kinds of school buildings in all cities of the Kingdom of Saudi Arabia such as:
•Al-Minya, Egypt Elementary School Model 5/21
• Elementary and Preparatory School Model 7/6
• Secondary School Model 7/6
• Elementary and Preparatory School Model 7/9
• Secondary School Model 7/9
• Secondary School Model 11/30
• Secondary School Model 23/12
• Elementary and Preparatory School Model 2/28
• Secondary School Model 2/26
▪ Many other buildings such as (Administration buildings - Medical units - Service buildings) in all cities for the Kingdom of Saudi Arabia like:
• Administration building of education in Qonfiza
• Student house building
• Separated Sports hall building

Project Engineer في Abbas Hussein Al Hammed EST., Al-Riyadh, Kingdom of Saudi Arabia (KSA).
  • المملكة العربية السعودية - الرياض
  • فبراير 2006 إلى أبريل 2007

Duties included daily site construction, Maintenance and finishing many buildings, processes, and activities as well as staff on site; ensuring duties are executed on time as required; ensuring daily diaries of events associated with the work on-site maintained; Supervising the commissioning and start-up activities; assisting with pre-tender and pre-construction activities for contracts relative to his site for the following project:
▪ The Technical University for Boys, Riyadh, Saudi Arabia.
▪ The Communication and the Information University, Riyadh, Saudi Arabia.
▪ The Technical Institute for Girls, Riyadh, Saudi Arabia.
▪ The Kingly Institute, Riyadh, Saudi Arabia.
▪ The Second Professional Center, Riyadh, Saudi Arabia.
▪ The Third Professional Center, Riyadh, Saudi Arabia.

Designer Structural Engineer (Part-Time) في Al-Hussan Engineering Consultants in Kingdom of Saudi Arabia (Egypt Brunch ), Al-Minya, Egypt.
  • مصر - المنيا
  • ديسمبر 2004 إلى ديسمبر 2006

Duties included Structural design of Many buildings in the Kingdom of Saudi Arabia for the following project:
▪ Many kinds of residential buildings in (Riyadh - Dammam - Alnamas), Kingdom of Saudi Arabia.
▪ Al Ahly Commercial Bank, Riyadh, Kingdom of Saudi Arabia.
▪ Commercial buildings in (Jeddah - Alnamas), Kingdom of Saudi Arabia.
▪ Gas station buildings in (Riyadh - Dammam), Kingdom of Saudi Arabia.
▪ Restaurant buildings for King Faisal University, Dammam, Kingdom of Saudi Arabia.
▪ Al Hasa Hospital buildings, Dammam, Kingdom of Saudi Arabia.
▪ Mosques in (Bisha - Alnamas - Sarat Ubeda), Kingdom of Saudi Arabia.
▪ Al Bathaa Traffic buildings, Dammam, Kingdom of Saudi Arabia.
▪ Al Falah International School buildings, Dammam, Kingdom of Saudi Arabia.

Site Structural Engineer في Rural Electrification Authority–Ministry of Electrical, Al-Minya, Egypt.
  • مصر - المنيا
  • ديسمبر 2001 إلى يناير 2006

Duties included daily site supervision of construction processes and activities as well as staff on site; ensuring duties are executed on time as required; ensuring daily diaries of events associated with the work on-site is maintained; witnessing and supervising the commissioning and start-up activities; assisting with pre-tender and pre-construction activities for contracts relative to his site; preparing project weekly progress reports; assisting in the preparation of project monthly reports as well as the Final Acceptance and Completion Report; reviewing and presenting the contractor valuations payments for final. Approval; reviewing and approving as- built drawings for final approval for the following project:
▪ Samalut Substation 66/11 K.V.A, Al-Minya, Egypt.
▪ Al-Minya Industrial Area Substation 66/22 K.V.A, Al-Minya, Egypt.
▪ Al-Minya West Substation 66/11 K.V.A, Al-Minya, Egypt.
▪ Al-Minya South Building for 11 K.V.A, Al-Minya, Egypt.
▪ Maintenance of some buildings in Al-Minya Rural Electrification Authority, Al-Minya, Egypt.

الخلفية التعليمية

دكتوراة, DBA: Doctor of Business Administration
  • في International Business School of Scandinavia -IBSS
  • مايو 2021
ماجستير, MBA: Master of Business Administration
  • في International Business School of Scandinavia -IBSS
  • سبتمبر 2018
بكالوريوس, Bachelor of Science: Civil Engineering Technology
  • في Faculty of Engineering, Al-Minya University
  • مايو 2001

Specialties & Skills

Project Management
Microsoft Office
AutoCAD
Technical Review
LEADERSHIP
CONTRACT MANAGEMENT
SELF-DIRECTED LEARNING
Hard Skills: Project Planning and Management, Construction Supervision, Procurement and Contract Man
Soft Skills: Self-directed learning, Strong organizational skills, Multitasker and systematic, Caree

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

Egyptian Syndicate of Engineers
  •  Member of Egyptian Syndicate of Engineers
  • June 2001
Urban Planning & Development authority
  • UPDA (Urban Planning & Development authority) Certificate , Grade(A)
  • December 2013

التدريب و الشهادات

• PMP ……Preparing course (الشهادة)
تاريخ الدورة:
July 2012
صالحة لغاية:
January 9999
•Certified in Marketing Module of MBA (الشهادة)
تاريخ الدورة:
September 2012
صالحة لغاية:
January 9999