Operation Head
KSA
مجموع سنوات الخبرة :13 years, 8 أشهر
• Arranged Production Schedules.
• Supervised Production Processes.
• Established Project for continuous improving.
• Steered Quality Control and droves Product Standards.
• Established Program for Preventive Maintenance.
• Established a new system for mold storage.
• Improved production planning schedules.
• Established a new system for the waste.
• Provide material planning in ERP system.
• Arranged Production Schedules. • Supervised Production Processes. • Directed Budgets and Timescales. • Steered Project for continuous improving. • Steered Quality Control and droves Product Standards. • Advised Preventive Maintenance of Production Equipment. • Collaborated in Hiring Production Staff and Identified Training to them. • Spearheaded TPM project for corrugator line. • Achieved waste reduction by 2%. • Increased productivity by 8%.
• Arranged Production Schedules.
• Supervised Production Processes.
• Directed Budgets and Timescales.
• Established Projects for continuous improving.
• Steered Quality Control and droves Product Standards.
• Advised Preventive Maintenance of Production Equipment.
• Collaborated in Hiring Production Staff and Identified Training to them.
• Achieved waste reduction by 1.5%.
• Improved production plant layout.
• Arranged Production Schedules.
• Directed Budgets and Timescales.
• Supervised Production Processes.
• Established Project for continuous improving.
• Advised Preventive Maintenance of Production Equipment.
• Achieved waste reduction by 1.5%.
• Improved production plant layout.
• Increased productivity by 5%.
• Achieved KPI Targets (Production and Changeovers).
• Created Daily Reports through Shifts.
• Implemented Safety Standard.
• Ensured the Quality of the Products.
• Analyzed Waste to maintain efficiency of operations.
• Supervised Good Manufacturing Practice (GMP) activities.
• Achieved waste reduction by 4%.
• Improved production plant layout.
• Increased productivity by 12.5%.
Global for Elevators and Escalator, Cairo Egypt
• Created schedules for the project including installation, commissioning
and final delivery.
• Installing ORONA elevators and local elevators.
• Created Time-Schedules for the projects using Project Management
Techniques.