Supervisor
HSE
Total years of experience :4 years, 5 Months
Amecspie / Hawk International JV - Yemen LNG / TOTAL -
Project : Onshore Pipelines 38” - 325 Km & 30” 25 Km. Terminals and intermediate facilities.
Main duty : Tie-in and special point pipe line installing & Hydrotest supervisor
Complementary assignments:
*Completion supervisor (hands on) during Pre-commissioning & Commissioning.
*PTW Coordination
*Installation of Process equipment
*Installation of Electrical & Instrument Equipment/System
*Support Company on Gas-In Operation
*Punch List clearance (work and administration)
*Materials control and expediting
*Vendor’s assistance (mobilization, logistic, performing)
Enforcement of
and related facilities
LNG EPC5A Onshore pipeline project
Project: Onshore Pipeline 32”& 8” and related facilities
Tie-In-special point and road crossing pipe line installing & Hydrotest Supervisor, piping
supervisor
Remote Camp construction and Logistics
Transport and lifting coordination
Early Operation and Maintenance
Block Valve Equipment Installation and Maintenance
Consumable Spare Parts administration
Gas plant production upgrading
Apr 2013
Tie-In-special point and road crossing pipe line
installing & Hydrotest Supervisor, piping
supervisor
Remote Camp construction and Logistics
Transport and lifting coordination
Early Operation and Maintenance
Block Valve Equipment Installation and
Maintenance
Consumable Spare Parts administration
Gas plant production upgrading
LNG
Project : Onshore Pipelines 38” - 325 Km & 30” 25 Km. Terminals and intermediate facilities.
Main duty : Hydrotest Valves Repair supervisor &Gas in
Complementary assignments:
*Completion supervisor (hands on) during Pre-commissioning & Commissioning.
*PTW Coordination
*Installation of Process equipment
*Installation of Electrical & Instrument Equipment/System
*Support Company on Gas-In Operation
*Punch List clearance (work and administration)
*Materials control and expediting
*Vendor’s assistance (mobilization, logistic, performing)
Enforcement of
and related facilities
Fujairah Water Project - Pipeline and related Facilities 64”
Main Duty : Tie-In, Ancillary Works and Completion Supervisor
Complementary assignments:
*Materials reception
*Concrete works
*Pumping Station assembly and test
Enforcement of
November 2017 Ongoing
AZFEN: S.p.A. Western Route Export Sectional Replacement project (Georgia)
Pipeline Construction Superintendent
Project: Onshore Pipeline diameter 53.mm & 36” and related facilities
Tie-In-special point and road crossing pipe line installing & piping supervision
Remote construction Logistics
Transport and lifting coordination
Early Operation and Maintenance
Block Valve Equipment Installation and Maintenance
PROJECT ACCOMPLISHMENT
From March 2015 Up to October 2017
Saipem S.p.A. South Caucasus Pipeline onshore project (Georgia )
Mechanical Pipeline spread Superintendent
Project : Onshore Pipeline 48” & 42” and related facilities
Tie-In-special point and road crossing pipe line installing & piping supervision
Remote construction Logistics
Transport and lifting coordination
Early Operation and Maintenance
Block Valve Equipment Installation and Maintenance
2013 / 2014-SPIECAPAG NIUGINI-PNG LNG
PNG-LNG EPC5A Onshore pipeline project
Pipeline Special point Site Leader
Project : Onshore Pipeline 32”& 8” and related facilities
Tie-In-special point and road crossing pipe line installing & Hydrotest Supervisor, piping
supervisor
Remote Camp construction and Logistics
Transport and lifting coordination
Early Operation and Maintenance
Block Valve Equipment Installation and Maintenance
Consumable Spare Parts administration
Gas plant production upgrading
*
TOTAL(TEPM), Export Project
-YADANA field -Myanmar-
Burma
Proactive on Risk identification & management
and SIMOPS management.
Maintenance & Commissioning&
Production Supervisor. Offshore plant,
Loading facility, work permit opening,
general supervision of Hot and Cold jobs)
with professionalism and autonomously.
assigned as team leader for the de-spading
campaign prior plan re-start post shut down
and achieved his target without any
problems, delay
TOTAL (SANTOS)Export Project
GLNG Onshore pipeline-Gladstone
QLD Australia
Pipeline installation Onshore 42’’ -410 Km
Special point pipeline installation inspection
From Injune up to Gladstone refinery plant
TOTAL (YLNG)
Construction/Commissioning &
start, Balhaf, & Marib Yemen
Yemen LNG - 900MMSCFD LNG work
permit opening general supervision of Hot and
Cold jobs Train Train1 & 2, 6.7 MTPA, Valves
repaired & Hydrotest inspection,
Commissioned and start up gas plant &
Shutdown, start Up & Hook up
Experiences
Amecspie Hawk International JV
Yemen LNG/TOTAL
Completion supervisor (hands on) during
Pre-commissioning & Commissioning.& start up
gas in operation
PTW Coordination
Installation of Process equipment
Installation of Electrical & Instrument
Equipment/System
Piping supervisor
Punch List clearance (work and administration )
Materials control and expediting
Vendor’s assistance (mobilization, logistic