Expériences professionnelles

Total des années d'expérience :17 years, 8 Mois

مدير مشروع à Landmark
  • Egypte - Le Caire
  • Je travaille ici depuis juin 2014

مراجعة اللوحات والمستخلصات والجدول الزمني والتقارير والعقود والمناقصات

qc
  • Je travaille ici depuis janvier 2011

emaar masr
 The project :construction of compound about (3.8 million) m2 till finishing and
infrastructure and landscape
 2000 m2 lake. Directs all construction stage and pile construction
 2150 m3 elevated tank
 POSITION: (

technical office manger à CONSULTING ENGINEERS DR.EZZ ELDIN &DR.HUSSEIN ABBAS
  • février 2009 à juillet 2011

Project: village gate
 Location: new Cairo
 Owne: PALMHILS
 Contractor: UCC (United Construction Company)HASSANALAMSONS with
PALMHILLS.
 Consultant: EHAF
The project: construction of 44 building each building consist of 5 stories each floor 2 flats.
Construction of network; landscape; fire network; mall.
My responsibilities: I was consultant in the project for inspecting all concrete works and
submitting of materials and approving of shop drawing and reviewing of quantities serving
and attending all pouring concrete hours.
1-Review of shop drawings related to disciplining and ensure sits compliance with designs,
contract requirement and properly coordinated with other discipline.
2-Review of materials related to disciplining and ensure sits compliance contract
requirement.
3- Ensure quality of work is compliance with contract requirements
Practice and only approved materials are used.
4-Reviewall Contractor submittals related to disciplining addressing Method Statements
Project Quality Plan, Safety Plan, Schedules and compliance with Project objective.
5-Closely monitoring site inspectors/ engineers performance.
6-Make sure that site activities are properly monitored and all quality records are established
7-Makesure that all site inspections are carried out as per intervention points marked in the
approved Inspection and Test Plan.
8-Attend weekly meetings as directed by

site engineer
  • décembre 2007 à février 2009

Projects:4 projects
1-construction a tower of 14 stories from foundation raft till 6th story(all site work sand
quantities calculations and other survey works;shop drawing making; concrete cubes making
;following up workers and their Productivity ……..)
Raft foundation was under 1500 piles diaphragm wall was carried out by bauer and
dewatering system to (ain alsera)
Working in finishing works of marble of high Luxor materials and making the shop drawing.
2- Luxury palace in 6th of October
All finishing works (marble-ceramic-paints………)
3-Villa in maadi for (owner of omar afande)
Repairing old parts and construction of new parts and other finishing works in excellent time.
4-alqawmya for cement
Establishing of 2 kilometer of fence around the company

site engineer à RAMW
  • septembre 2006 à décembre 2007

Project: WadiEl-RabeiProject
About project:
Location: 6th of October City

Éducation

Baccalauréat, مدني
  • à ايهاف
  • février 2006
Etudes secondaires ou équivalent,
  • à Faculty of Engineering
  • janvier 2006

, Civil Dept.

Specialties & Skills

AutoCAD
Technical Support
ADMINISTRATION
CONSULTING
CONTRACT MANAGEMENT
ENGINEERING
GRAPHIC DESIGN
LOTUS NOTES
MATERIALS MANAGEMENT
MEETING FACILITATION
QUALITY

Langues

Arabe
Expert
Anglais
Expert
Allemand
Expert