Project Manager
MISC Global (previously Majd for industrial services & Consultation)
Total years of experience :18 years, 4 Months
• Responsibilities:
1) Analyse Automation Tender Documents to lead selection & preparation of Suitable Solutions and Technical Proposals that meets Tender Specs.
2) Arrange/organize meetings or site surveys with clients for clarifications & data collection to meet Customer Satisfactions.
3) Preparing the Functional Design & Specification Documents (FDS) for projects.
4) Lead Programming and configuring Automation Systems (PAC, PLC, DCS, SCADA ...).
5) Arranging and preparing for all required tests (Factory Acceptance Test \[FAT\] & Site Acceptance Tests \[SAT\]).
6) Managing Automation team throughout project planning, execution, monitor & control, and closing.
• Projects:
1) SAFCO SF2 - REPLACEMENT OF DEMIN MODICON PREMIUM PLC, SA:
Automation System:
Schneider Modicon Quantum PAC with Redundant RIO configuration.
Schneider Vijeo Citect Server Configuration SCADA.
Services:
Various services with multiple clients in either troubleshooting automation systems problems through multiple platforms (DCS to PAC to Switchgears/Field Instruments) or modifying existing systems.
Examples:
System: Saudi Kayan EOEG Gateway automation system.
o Problem1: loss of communication between AB CLX and electrical switchgears (via Modbus RTU & DeviceNet).
o Problem2: Communication error between AB CLX and Yokogawa DCS.
o Final Status: Completely Solved.
System: Saudi Kayan Base Phenol A (BPA Prilling Fan Package) automation system.
o Problem: Modbus Communication card error.
o Final Status: Completely Solved.
System: Saudi Kayan Utilities (GYPSUM PLC).
o Problem: Modbus Communication Problem.
o Final Status: Completely Solved.
Beside Previous responsibilities, to plan and arrange for Projects in Western region also supervise projects execution, Commission, and handing over in the Region.
Project:
2) King Abdul Aziz University Cooling Utility Plant II PCS in Jeddah, SA.
Contractor: BEMCO
Utility: The university’s cooling utility plant composed of 12 CYK chillers and 5 OM chillers (two modes of operation chilled water and glycol for ice storage) plus ice storage tanks with full automated operation system including automatic lead-lag selection, mode selection, and fault optimization to deliver chilled water to the whole university building Energy transfer systems ETS (also provided by us)
Automation System:
AB SIL2 ControlLogix PAC for Central Utility Plant II (CUP II).
AB MicroLogix PLC for Energy Transfer Systems (ETS).
ControlNet Communication between CLX and Associated IOs.
MODBUS Communication between CLX and Chillers PLCs and Switchgears.
FactoryTalk View SE SCADA System.
Fiber optics Ethernet Communication with Central Plant Utility1 PCS (CLX with RSView 32) with modifications.
Ethernet Communication with Energy Transmission Systems PLCs (MicroLogix 1400).
SAMREF Doedijns two sampling system, Yunbu, SA.
Automation System:
AB CompactLogix PAC with Panelview plus HMI
• Responsibilities:
1) Analyse Automation Tender Documents to Select Suitable Solutions, and prepare Technical Proposal that meets Tender Specs.
2) Contact, organize meetings, or making site surveys with Tender Bidder for clarifying Technical Proposal ambiguous points to meet Customer Satisfactions.
3) Preparing the Functional Design & Specification Documents (FDS) for Clients to approve Automation System Components before ordering/delivery.
4) Program and Design Automation System (PAC, PLC, DCS, SCADA ...) for Customer Acceptance Test.
5) Arrange Factory Acceptance Test (FAT) Procedures with Client for testing new Automation system before delivery.
6) Contact and manage vendors for Automation System Material Supply and Devices/Instrumentation installation works.
7) Supervise/Arrange Commission and Start up Schedule regarding Automation System onsite works for Site Acceptance Test (SAT).
• Projects:
1) MaAden Magnesite Processing Factory in Al Madina Al Munauara, SA.
Automation System:
AB SIL2 ControlLogix PAC with Redundant configuration.
AB FactoryTalk View SE SCADA System with Redundant Servers & Historian Server
2) ARAMCO Khurasania Sulfur Loading Station, SA.
Automation System:
AB SIL2 ControlLogix PAC with Redundant configuration.
ControlNet Communication between CLX and Associated IOs.
MODBUS Communication between CLX and Monitor System.
• Responsibilities:
1) Analyse Automation Tender Documents to Select Suitable Solutions, and prepare Technical Proposal that meets Tender Specs.
2) Contact, organize meetings, or making site surveys with Tender Bidder for clarifying Technical Proposal ambiguous points to meet Customer Satisfactions.
3) Preparing the Functional Design & Specification Documents (FDS) for Clients to approve Automation System Components before ordering/delivery.
4) Program and Design Automation System (PLC, DCS, SCADA ...) for Customer Acceptance Test.
5) Arrange Factory Acceptance Test (FAT) Procedures with Client for testing new Automation system before delivery.
6) Contact and manage vendors for Automation System Material Supply and Devices/Instrumentation installation works.
7) Supervise/Arrange Commission and Start up Schedule regarding Automation System onsite works for Site Acceptance Test (SAT).
8) Prepare Automation Department Brochure/Presentation, Management Review reports, and literatures/articles for any Automation Fairs, Company Management Review Meetings, or Company magazine publication.
• Projects:
1) GUPCO Gas Turbines Control System Upgrade (Turnkey Project):
AB SIL2 ControlLogix (PAC).
AB FactoryTalk View SE SCADA.
2) SUCO Power/Load Management System Upgrade (Turnkey Project):
AB SIL2 ControlLogix (PAC).
Wonderware InToch 10.0 SCADA.
3) Kahraman New Oil Facility :
Customer: Khalda Petroleum Company (KPC).
Automation System:
AB SIL2 ControlLogix PAC Redundant
AB RSView 32 SCADA System
4) GUPCO Burner Management System (Turnkey Project):
Automation System:
AB SIL3 GuardPLC 1600.
Communication to DCS via Profibus Communication.
5) Agiba Fuel Gas Compressors Upgrade (Turnkey Project):
Automation System:
AB SLC Control System.
AB FactoryTalk View SCADA.
6) Assiut Fire Fighting Pumps Control System:
Customer: Assiut Oil Refining Company (ASORC).
Automation System:
AB SLC Control Systems.
• Projects:
Project 1: General Motors Egypt (GM Egypt) New Painting Station.
Responsibilities:
1. Commissioning and Configuring an Allen Bradley SIL2 ControlLogix PAC Control System for new Painting Station Conveyors and Electrical Mobilizing System (EMS).
2. Troubleshooting (during the operation test) The Commissioned Allen Bradley SIL2 ControlLogix PAC Control System for new Painting Station Conveyors and Electrical Mobilizing System (EMS).
3. Configuring DeviceNet Network for Conveyor Inverters and EMS Control System.
4. Designing and Commissioning a Conveyor SCADA System for Painting Process using Wonderware InTouch 9.5.
5. Commissioning HMI System for Conveyors and EMS using RSView Machine Edition.
Project 2: Khalda Petroleum Company (KPC) - El Kasr Site New Fuel Gas Skids.
Responsibilities:
1. Design, Programming and Commissioning an Allen Bradley CompactLogix Control System for operating new Fuel Gas skid units.
2. Complete Panel Rewiring for wiring configuration conflict with field instruments.
3. Memory Mapping for PLC program tags for MODBUS TCP/IP Protocol through a ProSoft MNET module, to make communication between PLCs through the Module.
• Location: Egyptian Media Production City.
• Work specification: Operating and Supervising a Central Air Condition System through a Building Management System.
• Name: American University in Cairo (AUC) Course: General English (level 11out of 13) Year: 2007
B.Sc. In Electrical Power and Machinery Engineering Suez Canal University Year: 2005