HP  ROY, Addl General Manager , Project  and  Construction Management , Pipeline , Oil  and gas , Civil

HP ROY

Addl General Manager , Project and Construction Management , Pipeline , Oil and gas , Civil

Kalpataru Transmission Limited , Oil and Gas , Pipeline and civil Division

Location
India - Surat
Education
Bachelor's degree, MBA in Project and Construction Management
Experience
28 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 10 Months

Addl General Manager , Project and Construction Management , Pipeline , Oil and gas , Civil at Kalpataru Transmission Limited , Oil and Gas , Pipeline and civil Division
  • India - Mumbai
  • My current job since October 2016

Brief Introduction of Project - Project is DNEPL( Dahej - Nagothane ETHYLINE Pipeline Project . It is A establishment of transportation system in between Dahej ( Terminal) to Nagothane Manufacturing Division, Ethylene is Planned to export from US and is to be transported through the 12 inch pipeline it crosses many paddy field, River. Mountainous train, and terminated to Plant, LOCATED at Nagothane, The Project contract is awarded to three Contractor M/S L&T, Corrtec and M/S Kalpataru Power Transmission Limited (M/S KPTL)

The scope of KPTIL IS OF Construction/Laying of 225KM X12 pipeline and 16 Station including Terminal, and IPS in Which Civil ( Foundation of PR Skid, Support of Piping, Cable trench, Foundation of Receiver and Launcher, Culvert, Foundation of Cross over, Paving, Boundary wall - Brick . Conc column and Penal, Rubble masonry, WBM Road, FOUNDATION OF RTU Telecom, foundation for Metering skid & INSTALLATION Guard Room, Storm drainage, Mechanical( Piping . Installation Of equipment. installation of Receiver and Launcher, Welding of pipeline, Trenching, stringing, Laying lowering and xing and Commissioning, Laying OF fire line
Waterline , ELECTRICAL ( Laying of Electrical cable and Termination at source and Panel, Installation of Lighting POLE etc including terminal, Storage tanks including

Project Director /Manager at Sterling Oil Exploration Energy Production Limited , Nigeria
  • Nigeria
  • July 2015 to August 2016

Gas Develop the Project strategy for Pipeline Project 18X18’’ Including Construction( Survey, ROW , Trenching/ Bending , Stringing, Welding, NDT, Coating Lowering, Backfilling, Restoration & Commissioning, ) Refinery, Tank, Flow Line, Rotary Equipment Etc Checking the Physibility of Project for ROW and Route , Environmental Clearance for the Project Procurement & Material Management and Identifying the Venders for the Specific Material Design and Selection of Tank Fabrication (Dome Roof ) 16.5x 25 M Dia, Capacity of 1500 barrel& including Construction & Commissioning Contract Management, & Budgeting Execution of Project of Pipeline, Flow line, Installation of Equipment .( Rotary and Static ) HCDPU Unit Etc and Well Pad and Erection of X-, Mas ( Wellhead) & Commissioning , Tank Farm( Fabrication and Commissioning , Piping, Civil and Structure, instrumentation, Electrical, Piping and Duplex Stainless Piping ( At Svs and Receiver and Launching End), Water injection/waterline ( Waterline 10’’x35 Km)), Flow line 25 Km 10/6/8/4/ inchx Min 10 and mx 40 km, Residential building (including Finishing Item , Installation of Degassing Unit ( 2& 3 Pac, TEERMINAL Construction, jetti and storage tanks

Outsourcing the Resources as Well follows
A. Allocation of Fund for the Ongoing Activity under the Sub Contract, Jetty Construction . Pilling, Maritime survey
B. Logistic Control
C. HSE & SECURITY and Permit System
D. Resources Planning for project
E. Lioson with Department of Petroleum
F. Clearance of Environment
G. Construction and Project Execution Plan for 150 Km x18 Dia Pipeline with Segment of Flow line and Tank Fabrication including Commissioning
H. Day to day Monitoring of Ongoing Activity
I. Selection of Venders and Placing a order
J. Monitor the QA Work and Department

Project Manager at Almuaser Petrolium Services , A division of Almco Group of Company Iraq
  • Iraq - Basra
  • October 2013 to July 2014

Project and Construction Management of Project Zubair Gathering Pipeline Project 10/12/20/30 inch, Welding 90 km , Well To Well Connection, including Welding Hook/up Tie-in, Coating, Tie-in at Well Head, Errection of Manifold, Involved in Techno .Commercial, and Construction including Terminal, INTERMEDIATE STATIONS AND VALVE STATION .Project Controll, Scheduling, BOQ, HSE, Procurement and Contract administration, Bidding, Business development, Client Satisfaction, Monitoring of Day to day Progress,

Main Client: Exxoin
Main Contractor :Saipem
Sub Contractor: Almuaser Petrolium

Project Manager Construction Pipeline , Terminal at Techo Engineering and Construction PVT ltd , Dubai /IRAQ
  • Iraq - Basra
  • January 2013 to September 2013

Project and Construction Management of Lukoil @ 130X48inch Pipeline Project Connecting with West Qurna 2 to Tuiba Tank Form as Project Manager- Construction Involved in Commercial and Techno, Project Value USD 155Milion USD million on E PC, Terminal including civil mechanical, Electrical and I instrumentation and COMMISSIONING and Transmission Line

Project Control, Pricing, Invoicing, Meeting, liosoning, Correspondence, Design, Field operation, Bidding, Technical Queries, HSE, QA/QC.Obtaining The permission from Govt authority,

Project Manager Construction Pipeline , Terminal ,Waterline at Heisco Kharafi -Kuwait
  • Kuwait - Al Jahra
  • September 2012 to January 2013

Project Construction Manager For Ma Sabiya Pipeline project 40inchx80 km and 30 inch x24 km, Automatic welding and Civil work worked as Execution Incharge of All Pipeline activity . In charge of Execution and Commissioning, Water Injection line 10inch x30 km

HSE, QA QC. Preparation and review the Drawing and Construction Methodology, Procurement , Support to Design Team, Progress meeting and review, Technical review, Resource mobilization Schedule review and Preparation, Monitoring day to day activities . Planing of one or 2 week ahead, Bar Chart, s- Curve

Project Manager Construction Pipeline , Terminal at GS Engineering and Construction , South Korea , Abudhabi
  • United Arab Emirates - Abu Dhabi
  • January 2011 to September 2012

Worked as Execution Inchargewith GS EngineeringSeoul, South Korea, -Client : Takreer and Consultant - Flour Abudhabi as Project Manager Inter Refinery Pipeline Project IRP2(10 INCH X20 km, 160x12 INCH 28 inch x210 km, 30inch x10 km Musafa to ADIA North, 12inch x20 KM - Musafa - ADIA South, 10 Inch x20 k - Ruwais - To SUWHAIT Including, Civil, Terminal Construction , Execution in charge of All pipeline project, Project Value USD 650million, Installation of Equipment, Civil work

HSE, Permit Coordinator, Liosoning, Resource Mobilization . Contract , Management, progress review .As built, Checklist, Support to feed design team, Monitoring the Client Instruction and Implementing the All applicable norms Of QA/QC, construction strategy , Planing

General Manager Project , Pipeline and Associate facilities , Terminal , STP /WTP at Megha Engineering and Construction Limited , Asam/HYDRABAD
  • India - Agra
  • August 2009 to December 2010

Project and Construction Management at ASSAM with
MEIL, JV with Rusian Company Voloksy as General Manager Project Pipeline & Trunk line( 6 inch to 20 inch flow line tank Fabrication - Project Value USD 400Milion

Execution of Pipeline activities, Flow line, STP and WTP
Project Control, Site administration, Contract administration , Correspondence with Client and Contractor, Documentation Liosoning . HSE, QA/QC. invoicing , Cash Management , Correspondence with Head office, , As built, Progress review, weekly meeting and review

Project Manager Abudhbai Crude oil Operation CO(ADCOP). Pipeline , Station , Civil and Mechanical , at Techno Engineering and Construction JV With China Petroleum Abudhabi- UAE
  • United Arab Emirates - Abu Dhabi
  • September 2008 to July 2009

Project and Construction management of Pipeline project 42inch x 105 km Abu Dhabi-UAE as Construction Manager, Execution In charge of All pipeline project And Associated Facilities ( Survey, Trenching, Stringing, Bending, Welding, NDT, PQT/WQT, Bedding, Lowering, back-filling, Restoration, NOC and hydrotesting and Commissioning

Civil work, Foundation, Bar bending schedule, Reveiw of drawing and design Deviation from PMC, attending the, HCE, Management of permit, Construction Methodology, Review, Drawing review, Preparation of procedure and review the Coment from PMC/Client including Electrical and Mechanical work

Procurement and Contract administration, Planing and schedule of 2 and 4 week ahead, P6, bar Chart
, s curve, Review of Project progress

Resource Planning and Mobilization Its effective uses at site . Day to day monitoring of All deployed Machinery

Design and FEED,

Closing the NCR and Comment
Closing The HSE comment

Construction Manager , Refinery ,Pipeline , Station work at Dosal Engineering and Construction Pte ltd
  • United Arab Emirates - Abu Dhabi
  • February 2007 to August 2008

Construction Manager @IRP1 and IRP2 pipeline Project Under EPC and 16xx32k inch NGL Replacement line of GASCO- Abudhabi Execution and Construction In charge ( Survey .ROW, Bending, stringing, Welding, NDT, WQT, PQR, Obtaining the Clearance from QA/QC, Lowering, Backfilling, Tie-in, Restoration, NOC, checklist, Hydro testing and Commissioning -Pre and final) of all pipeline activities including civil, MECHANICAL, electrical, & commissioning, terminal , Water pipeline 12inchx45km km, including all activities and commissioning

Civil work at Station including Electrical, Installation and alignment of Equipment, Resources mobilization schedule, outsourcing the Resources ( Manpower and Equipment, Recruitment . Study the FEED drawing and approval for Final Construction at site, Document controll. As built, Handing over, Check list

Section Manager ( Consultant ), Hilly area East -west Pipeline project 48x1374 km , at Relince industries Ltd ,RGTIL
  • India - Mumbai
  • June 2005 to December 2006

Jan’05-Dec’06 with Reliance, as Construction /Section Manager Supervised to the Contractor CPP( china Petrolium Bureau and STG Russia for East West Pipeline project as per the project Norms include Survey -ROW, Trenching in hilly area, Cleaning and Bedding, Blasting , Open and Control, Stringing bending, Welding, NDT, coating, Lowering, Backfilling, Tie-in, Restoration, Check list, River Xing, Handing Over , Hydrotest and Commissioning,

Connstruction manager/Spread incharge at Essar Project (India ) Ltd
  • India - Mumbai
  • July 2004 to June 2005

Execution in-charge of 30 Inch Pipe line - Dahej uran Pipeline project(Survey, ROW, clearing and Grading, Bending /Stringing Trenching, WELDING LOWERING tie-in, Backfilling, Restoration, major and minor road xing, Bank protection, Slope protection and earthwork, Resource mobilization, Outsourcing the resources,

Civil work at site, Building and finishing work, Layout, Survey, Topography survey, Electrical work Instrumentation, Errection, Installation of Equipment, Scrapper launcher, Cable laying telecommunication, RTU, Storm Drainage, Paving, Micro grading


Documentation, Procurement, Contract, PQT, PQR, NCR, HSE,

Engineer / Manager , Pipeline , Onshore and offshore ,Refinery at Punj LLOYD limited - New Delhi and Indonesia
  • India - Mumbai
  • January 1995 to December 2004

Jan’94-Jul’04 with Punjloyd, Indonesia (Duration 1996 -1998), Thal - Usar Thal Pipeline project 24 inch x11 km- Two line one trench, Alibabg .Mumbai high offshore 42 inch 3 km offshores line ( Uran - Trombay 8 inch /12/ inch Coonected to Jawahar Dip to Uran to Trambey Sea Pipeline, Sachin - Mora - Palsana Pipeline Project(2005) -16’’X25, 12’’X11 KM Including HHOKUP. installation of Valve Fabrication of Scraper and Launcher etc, Puna solapur Pipeline project (182km x16 +12, X161KM) Fabrication of Project, , Mumbai -Manmad Pipeline(16’’x332 km), Project. Bangalore @Banglore - Mangalore Pipeline 12x210 km as Line superintendent /In-charge of Construction, SRU Project -HPCL- Mumbai ( Worked as Engineer, In Punj LLoyd Worked on Capacity of Engineer and Manager and Involved in pipeline execution In charge, Civil In charge , QA/QC/ Line superintendent( In the Execution of Pipeline, Survey, ROW, Trenching, Welding, Hydrotest and Commissioning, Tie-in Restoration, NOC, , lisosoning), Outsourcing the resources, Surveyor /Land and Marine, Estimation, Reporting, Civil/Mechanical/Electrical and Instrumentation In charge oF svs and Road , Waterline 90 x30inch , Construction and commissioning

Jamnagr Loni Pipeline, Project 16inch 410 km and 20 km water pipeline at terminal
(JLPL Pipeline project and Link Road to SVS( Total 10 Km WMM/WBM gr I & II involved in Preparation of work program, Setting-out of road and bridge alignment, Labor and material management, Maintaining material ordering and consumption inventories, Estimation quantities and cost, Analysis of rate for non-schedule items of work, Execution of WBM. Bituminous and cement concrete pavements, Execution of Pipe, slab and box cell culverts of different spans .Execution of culvert involving open foundation with/without scour protection works (such as cut off wall and impervious flooring), Measurement of works, preparation of payment bills and claims, Preparation of as built drawing Laboratory and field testing materials and works, Preparation of detail reinforcement schedule

Gail Tel Project( Telecommunication Project - Ujjain to Jhansi ( 310 ) Along the Existing pipeline - Withing the Corridore of Existing 36 inch Gail pipeline, ( Survey, Trenching, Duct Laying, Splicing and Blowing & Commissioning, As built handover )

, Sasaram Mohaniya Road Project-65+000KM TO 110 KM, Delhi - Kolkotta, Arm of Golden Quadrilateral Project, Client - LG Eng &Construction Ltd South Korea ( Involved in handelling a auto Level, quantities and costing, preparation of work bills, Formation of Subgrade, Sub surface, Base Cource of asphalt and concrete, constructions of pavement layers such as embankment filling, sub grade-construction and granular sub base, wet mix macadam, Dense Bituminous Macadam, Bituminous Macadam, Bituminous Concrete, documentation and report preparation. Besides, he is familiar with modern highway construction technology and contractual arrangements as well as relevant IS, IRC codes of practice, ASTM and MoRT&H specifications on road and bridge construction. Also familiar with modern methods of construction of Roads, design standards, technical specifications, quality control/quality assurance procedures. Using Geo textile membrane in Between soil and Granular Embankment )

offshore Project .At mundra, Pulling of pipeline, Installation of SPM, welding, Lowering , Hydrotesting and Commissioning , PU - Coating,

Uran - Trombey Pipeline project, Laying the Pipeline in sea, Survey, Hydrosting, Pulling of Hydfrotest, civil work, Structure

Documentation, PQR, PQT

Section Manager , Pipeline , Station work ,Tank, at Hindustan Construction Limited Mumbai
  • India - Surat
  • June 1994 to July 1995

S HCC CO Ltd. JV WITH Nova - Rusia, as Section Manager of 18 inchx22km GAS PIPELINE under the Client GSPL , Connecting with Kalol Mehsana GAS pipeline PROJECT( Inlude survey, Trenching ROW, welding, NDT lowering, Tie-in Backfilling, Restoration, Hydrotest and Commissioning. Mlvs, Electrical and Instrumetation work, Installation of
Equipment, Terminal AS EPC Project and Oil Storage tank ( Doom Roof Capacity of
20000 BBLX2 No includes the Construction and ERRECTION As per relevant code API620 and 650 inlude Grading, Foundation, Fabrication OF bottom and superstructure


Road Project Mehsana -Planpur Road Project Under The Joint Venture of M/S HCC Co Ltd and Patti Malaysia, Worked as Section Inchrarge of Civil of Road Project involved Assist Project Leader to Inspection of Contractor’s Work equipment and other installations, maintenance of database of project details and material test records, Lane, Identifying BORROW Pit, Monitoring of Construction of sub surface, Base Cource, Top Cource Asphalting, Estimation of Material, Monitoring of Construction work of Shoulder, Berm, Curbing, Divider, Installation lIght Pole, Small bridges, Culvert Etc , , Selection OF Soil and Borrow pit, and other Material, Closures, Traffic Management during construction and Maintenance etc.; Assess and check laboratory established by the contractor for suitability of the same for conduct of the required tests; Inspect the performance of works with regard to workmanship and compliance with the specifications and Closure of Non Confirmation Report; Ensure that the construction maintenance, erection and operation method as proposed by the contractor for carrying out the works are satisfactory; Review of bituminous and concrete mix designs, laying methods, sampling and testing procedure; Setting up communication system through Daily Report, Inspection Notes, Memos etc among the different section for keeping the proper record to enable the monitoring of progress, Review of bituminous and concrete mix designs, laying methods, sampling and testing procedure; Setting up communication system through Daily Report, Inspection Notes, Memos etc among the different section for keeping the proper record to enable the monitoring of progress; Conducting and Attending the meeting with contractor and client on technical matters and preparing Minutes of Meeting; Examine and attend the measurement of any work; Inspection of all construction activities and approving or otherwise and issuing Non - Conformance reports to contractor for substandard work and also approving preventive / Corrective action proposed by contractor for the rectification of the same; Maintain day to day project diary; Prepare BOQ for the future O&M contract in consultation with client’s representatives.

Education

Bachelor's degree, MBA in Project and Construction Management
  • at Karnataka State Open University
  • July 2015
Bachelor's degree, BE CIVIL
  • at Bharati Vidyapeeth Deemed University
  • March 2012
Diploma, Civil Engineering
  • at Tilka Manjhi Bhagalpur University
  • August 1991

Survey Estimation , irrigation , Design ,Hydrolicks , Electrical , Mechanic's , Thermodynamics , Industrial Chemistry, Physics

Specialties & Skills

Contract Management
Project Control
MS Project
Pre construction
Project Work
Project and Construction, Contract Management in oil and Gas , Pipeline ,Civil ,Terminal ,Onshor

Languages

English
Expert