Work Experience

Total years of experience :16 years, 3 Months

Sr. Electrical Engineer at overseas bechtel incorporated
  • Qatar - Doha
  • My current job since February 2008

• Report to the project manager
• Maintains communications with field and Home Office project team members regarding problem resolutions
• Follow up the daily activity at the site
• Check work conformance with ES&H rules and Quality standers
• Perform technical reviews of contractors' ITPs, testing commissioning procedure, Test plan, test report, training manuals and training plans, and material submittals and shop drawings
• Supervise construction stages, the testing and commissioning for 11 KV switch gears, MV feeders, transformer 11KV/0.415 KV, small power system, LV switch gear, Lighting system(internal, and street lighting), power feeders, emergency system CBS, Generators, FA, PA, BMS, TDS and CCTV
• LOTO champion for ATC building, AEO building, CP-16 Facilities, and airport support facilities (GSE, Admin building, communication buildings, Fire stations, GAT, GAH, Solid waste treatments, Medical center, ETC)
• Provide input to Project Critical Items List
• Coordinating related discipline activities and interfacing with other areas/disciplines on the jobsite.
• Coordinate and document client and vendor required verifications of Electrical installations and tests
• Support development of the overall construction execution plan
• Supervise and perform daily monitoring of work practices of Bechtel and other contractors/subcontractors.
• Organize, conduct and represent the company at project coordination meetings at regular agreed upon intervals
• Assume responsibility to provide as requested by the project Quantity Surveyor with timely and accurate reports in terms of work carried out and all associated costs and finances.
• Promote, enforce and establish safety as a priority as part of the Company's ES&H plan, procedure and the overall requirements to achieve the Zero target

Maintenance Manager at Degremont-Suez
  • Egypt - Alexandria
  • My current job since January 2015

• Developing proactive maintenance planning system, reducing the cost, down time and blocklogs
• Appling proven performance measurement tools tailored to the maintenance conditions
• Developed an accurate and reliable maintenance history through tracking and analyzing
• Effectively decreased downtime by coordinating and streamlining maintenance planning, scheduling and cost control process
• Carrying out maintenance daily activities, corrective, preventive and predictive for the Plant
• Prepare and review the schedule maintenance activities, daily, weekly, monthly, quarterly, etc
• Assisting with the inspection of completed work with the client and client representative at handover ensuring the availability and suitability of as fitted drawings and associated operation and maintenance manuals
• Negotiate, prepare, issue and execute change orders to clients, design team, and subcontractors and prepare revisions to original budget as a result of changes and revisions to work
• preparation, review and update of short term of working programs in terms of Labour, plant and timescales, for the designation of supervisory staff and Subcontractors
• Follow up and coordinate with the client rep, subcontractors all the upcoming events and the inauguration procedures
• Facilitate and approved the applicable modification, increasing the work performance and issuing six sigma project for many discipline and provide a great value to the plant’s process
• Deputy Plant manager, approving the invoices, submitting letter. PO’s and lead the staff meetings
• Coordinate and provide direction for the budget estimating, purchasing, engineering, accounting, and cost and construction functions as they relate to the completion of the project.

Maintennace Manager at Suez International
  • Egypt - Alexandria
  • January 2015 to March 2020

• Project Manager for The Renewal works of the existing plant (MEP) for 50 M EGP
• Designed a feasible plan that achieves the objectives of the project and aligned with the organization’s overall business strategy.
• Defining the project’s scope and determining the resources, estimating time and financial commitment, monitor and report the project’s progress.
• Applying the proper performance measurement tools tailored for the maintenance conditions, conduct training; technically, safety and management to the maintenance and plant team
• Developed an accurate and reliable maintenance history through tracking and analyzing the performance of the equipment, spare parts and the maintenance schedule on the CMMS
• Working in the interconnection of the warehouses, procurement and the financial beside the operation and Maintenance through the INFOR in order to reduce the cycle time and paperwork
• Performing the Predictive Maintenance in the daily aspects(condition monitoring), vibration analysis, laser alignment, thermal Camera and Harmonic and Electrical distortion, Minimizing the time-based Maintenance
• Implementing yearly the Criticality Analysis for the equipment, identifying the most critical equipment, impact on the processes, identifying spares parts needed in order to secure all equipment in service
• Identifying, analyzing, evaluating and managing any potential risk associated with the project and maintained continuous monitoring until the risk is mitigated
• Planning, performing and follow up the Preventive Maintenance Schedule, monitoring the equipment condition, resolve any corrective required and maintaining less downtime
• Identified SMART objectives with measurable KPIs for the team, in alignment with the Plant global objectives and KPIs.
• Conducted regular review to identify any changes in the processes that may occur and reallocate resources to accommodate these changes.
• Conducting regular meetings with external stakeholders (Clients, Engineer, Third Parties, Governmental Entities, Electrical Company, labor organization) to report progress and ensure meeting their needs.
• Leading handover committee from the End-User, Employer, Engineer and the civil contacting for the hand over the process and close out the construction project
• Negotiating, preparing, issue and execute variation orders to the client, leading the design team, technical office, procurement, Material shipment, and erection
• Follow up regularly the warehouse in &out and the available list of spares in order to secure the plant operation
• Using Troubleshooting and problem-solving techniques (FEMA), opening case studies for the critical equipment and long lead problem
• Revised the maintenance SMP, Risk associated on the job, implement SWOT analysis, monitoring daily the performance and prepare and submit the monthly report(Operation &maintenance and renewal works) and the maintenance KPIs

Lead Electrical Engineer at Degremont Suez
  • Egypt - Alexandria
  • April 2013 to December 2014

• Leading the Electrical team including assigned support staff, supervisors, engineers, foreman, and technicians
• Coordinate and provide direction for the budget estimating, purchasing, engineering, accounting, cost, and construction functions as they relate to the completion of the project.
• Initiate, establish and maintain working relationships with client, engineers, suppliers, and subcontractors to facilitate construction activities
• Ensure timely project completion through project scheduling, expediting of material deliveries, and the management of material and document submittals& approvals.
• preparation, review and update of the short term of working programs in terms of Labour, plant, and timescales, for the designation of supervisory staff and Subcontractors
• Management and co-ordination of project specifications, Drawings, and associated technical data, gaining the necessary approvals, ensuring the distribution and availability of the data where its need in support of project Quality
• Negotiate, prepare, issue and execute change orders to clients, design team, and subcontractors and prepare revisions to original budget as a result of changes and revisions to work
• Leading the team in construction, commissioning, and calibration of Electrical power(MVSG, LVSG, MVSS, LV PDS, Pumps, control equipment, MCC, PLC) and Instrumentation(FIT, LIT, O2, rH, H2S, Ultrasonic, Electromagnet Flowmeters, Thermal mass, HASH, PID etc) works
• Assisting with the inspection of completed work with the client and client representative at handover ensuring the availability and suitability of as fitted drawings and associated operation and maintenance manuals
• Deputy project safety manager, maintaining site-working practices in accordance with the company’s QHSE, enforcing and adhere to company Policies and Processes.

Education

Bachelor's degree, electrical power and machine
  • at Mansura university
  • May 1995

Egyptian Engineering Syndicate member, PMI (project management) institute, ASQ (American society of Quality)

Specialties & Skills

Time Management
Project Control
Life Safety
PMP training
Management and technical issues
process control
project management
Turn over Documentation

Languages

English
Expert

Memberships

PMI
  • PMI (project management) institute,
  • August 2011

Training and Certifications

PMP (Certificate)
Date Attended:
August 2011
Valid Until:
August 2011