حسين فهيم حسبن ابوالدهب ابوالدهب, Engineer

حسين فهيم حسبن ابوالدهب ابوالدهب

Engineer

For Onshore OIL OPERATION (ADCO)

البلد
مصر
التعليم
بكالوريوس, petrolum
الخبرات
10 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 8 أشهر

Engineer في For Onshore OIL OPERATION (ADCO)
  • الإمارات العربية المتحدة
  • يناير 2015 إلى يوليو 2015

I join with ADCO in UAE in Jan, 2008 as production engineer responsible for W/L & intervention work (killing. Stimulation, perforation, logging, slickline operations)
Supervise logging programs as per RMP.
Prepare corporate monthly Wire line plan(12 months) as part of PEIP for SAS including all RMP and activities and follow -up on execution & Feedback
Provide daily W/L activities report
Ensure timely reporting of the planned activities on the assigned board
Monitor the Wire line workload distribution and ensure max. Utilization of W/L units.
Issue monthly status report on W/L utilization
Review the W/L survey results (on weekly basis) and ensure quality prior to forwarding to RDD
Prepare monthly wire line charge out distribution report along with the invoice.
Prepare W/L budget & flow up
Plan, prepare all programs such as: PBU, PFO, Isochronal test, interference test
Put the plan for all types of logging such as: WFL, RST, PLT
Prepare all task order & DTR for W/L
Participated in SC-SSSV maintenance optimization effort
Intervention work as: killing. Stimulation, Kick off using N2, Scale removal, fishing using CTU, logging in horizontal well using CTU.
Program all intervention work and follow-up progress and evaluate results and use lessons learned to optimize further programming.

Engineer في he Gulf of Suez Petroleum Company
  • نوفمبر 1998 إلى يناير 2008

different fields in Ras Shukeir area.
I joined Abu Dhabi Company for Onshore Operations (ADCO) in UAE in Jan, 2008 as production engineer responsible for W/L & intervention work ( killing. Stimulation, perforation, logging )
Key competencies


..
Monitor wells performance and identify enhancement opportunities.
Production optimization using nodal analysis.
Administer Well by well reviews and well intervention operations.
Rig and rigless activities, Coiled tubing operations and Completion design.
Production logging analysis and Open hole logs analysis.
Gas lift design, redesign and trouble shooting.
Witness many offshore jobs (perforation, WSO, stimulation, PLT, WFL, PSP, TDT, FSI, ….).
Drilling and workover statement of requirements (SOR) preparations.
Reservoir management and surviellance
Water flood management
Field development planning and followup implementations.
Well test analysis.
Estimation of remaining reserve (decline curve).
Calculation of OOIP using material balance and volumetric methods

مدير اداراه في شركه بترول خليج السويس
  • مصر - القاهرة
  • يناير 1998 إلى يناير 2008

اداره حقول النفط

Engineer في Reservoir engineering ( as reservior management ) & Petroleum
  • أكتوبر 1999 إلى أكتوبر 2000

Review, update and plot the daily production and water injection reports for each well and field, identify the problematic wells, and evaluate the remedial actions for these wells. For example, production performance monitoring through Prosper modeling resulted in saving 20 MMSCF/day of lift gas used to open another shut in wells with 800 BOPD incremental oil.
Follow up the well performance and reservoir performance to determine production problems and identify the solutions to maximize the production rates.
Solve any well integrity problem, such as preparing repairing programs for X-Mass tree and/or header leaking valves, any tubing or casing obstructions, communicating tubing/annulus, …etc. Understanding of well integrity issues and shred in determining high risk wells to HSE view.
Study the water flood project effects on the production performance by following up the pressure performance, chloride measurements and water cuts to identify the optimum water injection rate.
Prepare programs for all rigless operations and follow-up progress and evaluation for:
Pressure survey (static, flowing, PBU).
Cased hole logging (PSP, RST, WFL, Cement Evaluation, etc..)
Tubing Cleaning (mechanical and chemical)
Stimulation and acid wash (acidizing/fracturing).
Perforation & re-perforation job.
CT application (unloading, stimulation, fishing, etc..)
Water shut off using TTBP.
Drawing X-sections and determining offset wells relationships to develop a recommendations for production/injection enhancement opportunities.
Follow-up daily drilling operations. Discuss the well problem with the drilling team. Make sure to maintain the well integrity and achieve the required SoR objectives (statement of requirements). Initiate SoR and integrate inputs to the final issue from geology, reservoir engineers and drilling and directional plan.
Work over evaluation: Coordinate with other engineers (production Eng’s, Reservoir Eng’s, and drilling Eng’s) as well as production personnel to identify, develop, recommend and implement work over opportunities.
Determining scale accumulation and preparing suitable solvents.
Calculation of remaining reserve for many fields.
Calculating OOIP using material balance and volumetric methods.
Water Flood evaluation and redistribution for Sidki Field Nubia formation
Preparing drilling SOR for new wells and workovers.
Evaluation of reservoirs performance and recommendations for rig and rigless activities and surveillance plans.

Engineer في Gulf of Suez Petroleum Company (GUPCO)
  • الإمارات العربية المتحدة
  • نوفمبر 1998 إلى أكتوبر 1999

Production/water injection performance monitoring.
Follow up the well performance and reservoir performance to determine the production problems and identify the solutions to maximize the production rates.
Well intervention operations.
Rig and rigless activities monitoring.
Preparing and witnessing stimulation jobs.
Determining scale accumulation and preparing suitable solvents.
Evaluation of reservoirs performance and recommendations for rig and rigless activities and surveillance plans.
Drawing X-sections and determining offset wells relationships to develop a recommendations for the following as required:
Water shut off using MPBT
Perforation and re-perforation
Rig and rigless re-completion.
Stimulation and tubing cleaning.
Studies
Participates in Hilal field development study with Sunbury development team in UK and results showed 2 new wells with 4000 BOPD incremental oil and increase the remaining oil reserve by producing the attic oil in this field by 5 MMBO incremental in reserve.

الخلفية التعليمية

بكالوريوس, petrolum
  • في Petroleum Engineering Cairo University
  • مايو 1998

Specialties & Skills

BALANCE
ENGINEERING
OIL PAINTING
OPTIMIZATION
PROGRESS
TROUBLESHOOTING

اللغات

العربية
متمرّس
الانجليزية
متمرّس

الهوايات

  • القراه
  • FOTTBALL