hussin saba, Project Manger

hussin saba

Project Manger

professionals consulting Group

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Civil Engineering
Expérience
29 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :29 years, 0 Mois

Project Manger à professionals consulting Group
  • Arabie Saoudite
  • Je travaille ici depuis septembre 2013

● Project:
- Implement the branch of Saudi commission for tourism in jizan city

● Responsibility:

Responsible for day to day site work follow up with contractor or subcontractor to ensure that work is being carried out as per design drawing & specification.
Daily report about the progress of work to the projects manger.
Inspect all materials and equipments supplied by subcontractor
Monitor that all work is being carried out is safely.

project manager à Bn Garallah Holding Co. for Trading & Contracting ( SAUDI ARABIA )
  • Arabie Saoudite - Najran
  • Je travaille ici depuis septembre 2017

OCT .2017 - now - Bn Garallah Holding Co. for Trading & Contracting ( SAUDI ARABIA )
● Position: Al mashaliea Project Ngran.
● Project: : Implement of layout and infastrure

project manager à شركة بن جارالله للتجارة والمقاولات القابضة
  • Arabie Saoudite - Province du Sud
  • Je travaille ici depuis septembre 2017

مدير مشروع اسكان المشعلية بمنطقة نجران

مدير مشروع à النعيم للاستشارات العمرانية
  • Arabie Saoudite - Taëf
  • décembre 2015 à septembre 2017

مدير مشروع الموقع العام لجامعة الطائف بسيسيد ( الاشراف علي التنفيذ)
قيمة المشروع بمرحلتيه 566 مليون ريال

Project Manger à 2013 - Al Nasr General Contracting ( Hassan Allam)
  • octobre 2010 à septembre 2010
Project Manger à Alhoraity Contracting Trading Co. , Ltd
  • Arabie Saoudite
  • juin 2006 à septembre 2010

● Projects
School Form primary season in shrorha
Fire Training Center Project at King Faisal Air Base in Tabuk which is a construction project integrated " Buildings, roads, facilities

Project à Alexandri
  • juin 2006 à octobre 2006

2- Development of “Taba International Airport to raise the efficiency of the runway Assistant, apron and taxiways
3- Development of "

Project Manger à Alaobid Estatment for Contracting
  • Arabie Saoudite
  • septembre 2002 à avril 2006
Senior Site Engineer à Egyptian real Estate Company for land reclamation
  • Egypte
  • janvier 1997 à juillet 2000

● Projects
A) Implementing the infrastructure for the project north of plain clay in the northern Sinai under the supervision of the executive body for the development of Sinai under the Ministry of Public Works and Water
industrial works of bridges, intakes and arches and bridges reservations Piling
coating work Director Sheikh Jaber Bald bash channel
Coating work station inlet and outlet peace
protection works side tendencies to Al Sheikh Jaber and South Kantara channels

B) Industrial works from bridges on the network of banks, Nubaria

Senior Site Engineer à Egyptian real Estate Company for land reclamation
  • mai 1995 à janvier 1997

● Projects
*) reclamation project 2, 000 hectares project preached the agricultural project nursery Sirte and was executed the following acts:

the implementation of the internal road network of the project
the implementation of farm tanks
the implementation of the internal piping of the project

Site Engineer à Egyptian real Estate Company for land reclamation
  • mai 1990 à mai 1995

● Projects
A) - the implementation of a number 354 house model 93 / a in Om alrish village in feathers of a plain area south of Port Said
B) - the implementation of a number 1000 graduate of housing Model 93 / a in Al amany village in plain area south of Port Said
C) - the implementation of the service buildings in Al amany village ( residential building model 49 / D )- Residential Building Model 37 / d - the number of 16 dwelling observant house- based community development - based commercial market - based Health Unit - based social club - based veterinary Unit - the building of the mosque - School of basic education )
E) - the implementation of networks (roads - sewage - water supply) for each of the Om alrish and Al amany villages
F )- earthworks for irrigation and drainage ducts to the process of reclamation of 2000 acres in South Port Said easy control of the Om alrish `village & reclamation 5, 000 acres reins in Al amany
And - bridges and Aqueduct and bridges piles plain area south of Port Said
H) - the process of implementing by Al iza road separation between Eastern and Ismailia governorate

Éducation

Baccalauréat, Civil Engineering
  • à Zagazig university
  • janvier 1988

Graduation grade : Good Project: - structure Design & Analysis Project grade : Good

Specialties & Skills

Public Buildings
Execution Management
Formal Methods
Stewardship
BRIDGES
CONSULTING
ENGINEERING
GESTIÓN
MICROSOFT WINDOWS 2000
NETWORKING
REAL ESTATE

Langues

Arabe
Expert
Anglais
Expert

Loisirs

  • play football