Engineering Geologist
Ghulam Rasool and Company(GRC)
Total years of experience :3 years, 2 Months
Construction of Hassan Abdal - Havelian Section of E-35, Package-1 Burhan to
To Jari Kas
Geotechnical Investigation of Strategic Petroleum Products Storage Facilities, Phase -
1 at Mesaieed, State of Qatar
ii. Soil Investigation for New NGL Support Campus- Phase 2 at Mesaieed State Of Qatar
iii. Geotechnical Investigation works at Design & Construct for temporary steel bridge for
the existing roundabouts at the Junction of E Ring Road and Al Muntazah Street State
Of Qatar
iv. Geotechnical Investigation for CP07-B Hub Office at Lusail Area State of Qatar
v. Geotechnical Investigation for Duty Free Ware house and remote station NDIA(New
Doha International Airport) Doha Qatar, Consultants: Mace, Client: Bechtel
Key Experiences:
Drove the operation of Geotechnical investigation including site inspection, drilling
and assignment of work orders to drillers
Received and described soil and rock samples from the site, and recommended some
samples for any irregularities based on specifications, type and purpose of building.
Logged the samples as per BS 5930-1999, both disturbed as well as undisturbed
samples of soil and rock
Prepared laboratory test schedule by selecting samples of rock soil and water for
specific mechanical and chemical testing
Prepared draft borehole logs based visual description and laboratory test results
An Installation of different type of piezometers for the monitoring of ground water
fluctuations
Have vivid experience in conducting special in-situ tests like Packer, Constant head
Resume: Ibad-Ur-Rehman
and Falling head permeability tests and infiltration test (soak away), Electric
Resistivity test and Soil Resistivity test
Have a sound knowledge of different strata in Qatar
Have a thorough knowledge of BS 5930-1999 “code of practice for site investigation
Main Projects Handled:
i. Extension and remodeling of Warsak Canal, Peshawar, Pakistan
Key Responsibilities:
Working on drilling rigs setup, monitoring its operation and logged the soil and
rock samples
Stratigraphic and Structural correlations and making reports of daily operational
summary
4. Organization Name: MATRACON Pakistan Joint Venture
Peshawar Northern Bypass Motorway Peshawar
Key Responsibilities:
Major responsibilities include material testing and report preparation
Major tests performed include, Determination of water content, Standard Proctor
Compaction Test, Modified Proctor Compaction Test, Specific Gravity, Sieve
Analysis, Fineness Modulus, Liquid Limit Test, Plastic Limit Test, . Engineering
Classification of Soils, Field Density Test (FDT), Los Angeles Abrasion Test,
California Bearing Ratio (CBR) Test
B.S. Research/Project/Thesis:
* Microfacies Analysis and Sequence Stratigraphy of the Chhidru Formation, Western Salt