o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: June 2010 to Aug. 2010
Project: Egypt LNG at Damietta. ( Shut Down Activities)
Company: SEGAS
Position: QA/QC Inspector
Responsibilities: o Visual inspection for piping and equipment (vessels-tanks- etc.)
o Thickness measurements for all piping and equipment using ultrasonic device
o Follow up for Repair welds and covering class for Welders about the repair
o Interpretation of RT films.
o Preform NDT as required.
o Witnessing WQT, PQR
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness of hydro test for piping loops
o Punching and Test Pack activities
Period: April. 2010 to May 2010.
Project: Installation of 40 km pipeline
Company: General Petroleum company (G.P.C)
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for welder qualification
o Witness for welding parameters as per approved wps
Period: Oct 2008 to Dec 2009.
Project: On shore Gas pipeline laying ( last stage 400 kms)
Company: Gasco
Contractor: Petrojet
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films, Ultrasonic test
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Check all welding parameters as per approved WPS.
o Witness for WQT-PQR
o Review NDT Reports
o Witness hydro test as procedure
o Review calibration certificates for all gauges used in hydro-test
Period: Aug.2008 to Sep.2008
Project: Off shore pipe line laying
Company: Rashpetco
Contractor: Saipem
Position: QC Engineer
Responsibilities o NDT coordination, performing & evaluation Interpretation of RT films
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: June.2008 to Aug.2008
Project: Maintenance of Propane Factory
Company: United Gas Depravities
Position: QC Engineer
Responsibilities: o NDT coordination, performing & evaluation
o Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Ultrasonic testing for measuring thickness to determined corrosion areas.
o Used pipe locator and DCVG for inspection of buried pipeline
o Witness of hydro-test for piping loop.
o Punching and test package
o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
Period: May. 2007 to Aug. 2007
Project: Construction of 8 storage tanks and 4 Gas boots
Company: V-Gas
Contractor: Petrojet
Position: Q.C Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Review all procedures
o Witness for WQT, PQR
o Review and implement ITP
o Review Drawing and specification
o Review material certificate
o Review welding parameters.
o Review calibration certificates for all equipment which used during manufacture or during apply testing.
o Witness for Hydro test
o Review the certificates of material which use in blasting (sand - Garnet ..etc.)
o Witness for apply approved painting system and check surface preparation (visual and roughness- and DFT for measuring thickness of painting.
o Review Hand over
Period: Jan.2007 to May 2007
Project: Offshore pipeline laying.
Company Gupco
Contractor: Saipem
Position: Q.C inspector
Responsibilities: o NDT coordination, performing & evaluation. Interpretation of RT films.
o Performing pre, during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness for ultrasonic testing according to approved ITP
o Review NDT reports
o Witness for WQT & PQR
o Witness for weld repair
o Witness during foam injection wrapping upon field joint before laying
o Holiday detector for field joint wrapping
Curriculum Vitae
Period Jan. 2006 to Dec. 2006.
Project: Construction of 8 storage Tank, 4 gas boots
Company: V-Gas
Contractor: Petrojet
Position: Q.C inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Review all procedures
o Witness for WQT, PQR
o Review and implement ITP
o Review Drawing and specification
o Review material certificate
o Review welding parameters.
o Review calibration certificates for all equipment which used during manufacture or during apply testing.
o Witness for Hydro test
o Review the certificates of material which use in blasting (sand - Garnet ..etc.)
o Witness for apply approved painting system and check surface preparation (visual and roughness- and DFT for measuring thickness of painting.
o Review Hand over
Period April.2005 to Dec. 2005
Project: Concert coating of pipeline length 110 km
Company: Gasco
Position: Q.C inspector
Responsibilities: o Review material certificates
o Witness of surface preparation of pipe
o Measuring roughness as per procedure
o Witness during mixing component.
o Check wire mish material.
o Witness for concrete testing
o Witness for thickness measurements
o Review color code for pipes
o Review traceability
o Review cutback for field joint.
o Review daily production reports
Curriculum Vitae
Period Oct.2004 to Feb. 2005
Project: Construction for 7 storage tanks
Company: Qarun oil
Position: Q.C Inspector
Responsibilities NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Review all procedures
o Witness for WQT, PQR
o Review and implement ITP
o Plumpness check
o Peaking and banding measurements
o All inspection activities as per API 650
o Prepare hydro test for tank
o Vacuum box test
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: September 2010 September 2012
Project: Construction of LNG plant and construction of 3 spherical Tanks (3000 m3)
Company: Egyptian Bahraini Gas Derivatives company (EBGDCO)
Position: QA/QC Inspector
Responsibilities:
o Review of all document such as (Specifications; Drawings)
o Review Inspection and Test Plan (ITP)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification.
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic
instrument and works to examine Welds &Thickness Measurement) according ITP.
o Review of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
Curriculum Vitae
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
o Witness of surface preparation for painting
o Witness for apply painting system as required, inspect paint visual and DFT.
o Check hot and cold insulation and inspect visual.
o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: September 2010 September 2012
Project: Construction of LNG plant and construction of 3 spherical Tanks (3000 m3)
Company: Egyptian Bahraini Gas Derivatives company (EBGDCO)
Position: QA/QC Inspector
Responsibilities:
o Review of all document such as (Specifications; Drawings)
o Review Inspection and Test Plan (ITP)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification.
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic
instrument and works to examine Welds &Thickness Measurement) according ITP.
o Review of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
Curriculum Vitae
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
o Witness of surface preparation for painting
o Witness for apply painting system as required, inspect paint visual and DFT.
o Check hot and cold insulation and inspect visual.
Period: June 2010 to Aug. 2010
Project: Egypt LNG at Damietta. ( Shut Down Activities)
Company: SEGAS
Position: QA/QC Inspector
Responsibilities: o Visual inspection for piping and equipment (vessels-tanks- etc.)
o Thickness measurements for all piping and equipment using ultrasonic device
o Follow up for Repair welds and covering class for Welders about the repair
o Interpretation of RT films.
o Preform NDT as required.
o Witnessing WQT, PQR
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness of hydro test for piping loops
o Punching and Test Pack activities
Period: April. 2010 to May 2010.
Project: Installation of 40 km pipeline
Company: General Petroleum company (G.P.C)
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for welder qualification
o Witness for welding parameters as per approved wps
o Witness surface preparation pre wrapping. And check roughness as per approved
procedure
o Witness for hot wrapping and preform holiday detector.
Period: Feb.2010 till April 2010
Project: Offshore pipe line laying
Company: Petrobel
Position: QC Engineer ( RINA Italy as TPI)
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
o Qualification of welders in accordance to codes, standard and specs.
o Witnessing WQT& PQR. Punching and Test Packages activities.
o Review and establishment of Procedures Qualification records (WQR'S)
o Performing pre, during and post welding inspection (Fit up welding Monitoring, visual, and dimension check) fabrication and erection.
o Evaluation of Non-Destructive Testing Results of Material and Welding In Accordance to
Codes. Standards and Specification (Interpretation of RT films PT & MT evaluating)
o Surveillance / Witnessing during fabrication of Pressure Vessels
o Surveillance / Witnessing during installation of Pressure Vessels
o Surveillance / Witnessing during onshore pipe laying
o Surveillance / Witnessing during offshore pipe laying
o Surveillance / Witnessing during pre-commissioning & commissioning of oil and gas
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: September 2010 September 2012
Project: Construction of LNG plant and construction of 3 spherical Tanks (3000 m3)
Company: Egyptian Bahraini Gas Derivatives company (EBGDCO)
Position: QA/QC Inspector
Responsibilities:
o Review of all document such as (Specifications; Drawings)
o Review Inspection and Test Plan (ITP)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification.
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic
instrument and works to examine Welds &Thickness Measurement) according ITP.
o Review of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
Curriculum Vitae
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
o Witness of surface preparation for painting
o Witness for apply painting system as required, inspect paint visual and DFT.
o Check hot and cold insulation and inspect visual.
Period: June 2010 to Aug. 2010
Project: Egypt LNG at Damietta. ( Shut Down Activities)
Company: SEGAS
Position: QA/QC Inspector
Responsibilities: o Visual inspection for piping and equipment (vessels-tanks- etc.)
o Thickness measurements for all piping and equipment using ultrasonic device
o Follow up for Repair welds and covering class for Welders about the repair
o Interpretation of RT films.
o Preform NDT as required.
o Witnessing WQT, PQR
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness of hydro test for piping loops
o Punching and Test Pack activities
Period: April. 2010 to May 2010.
Project: Installation of 40 km pipeline
Company: General Petroleum company (G.P.C)
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for welder qualification
o Witness for welding parameters as per approved wps
o Witness surface preparation pre wrapping. And check roughness as per approved
procedure
o Witness for hot wrapping and preform holiday detector.
Period: Feb.2010 till April 2010
Project: Offshore pipe line laying
Company: Petrobel
Position: QC Engineer ( RINA Italy as TPI)
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: Dec 2009 till Feb.2010
Project: Construction of 10 storage tanks (1000 BBS) and 2 Gas boot.
Company: Petro-Alam company
Position: QA/QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for WQT, PQR
o Review and implement ITP
o Review drawing and client specification.
o Witness for all NDT required in ITP as ( PT-RT)
o Witness for hydro test.
o Witness for air test for all nozzles connected to tank body.
o Review calibration certificates for all equipment which used during manufacture or during apply testing.
o Review Hand over of documents.
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: September 2010 September 2012
Project: Construction of LNG plant and construction of 3 spherical Tanks (3000 m3)
Company: Egyptian Bahraini Gas Derivatives company (EBGDCO)
Position: QA/QC Inspector
Responsibilities:
o Review of all document such as (Specifications; Drawings)
o Review Inspection and Test Plan (ITP)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification.
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic
instrument and works to examine Welds &Thickness Measurement) according ITP.
o Review of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
Curriculum Vitae
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
o Witness of surface preparation for painting
o Witness for apply painting system as required, inspect paint visual and DFT.
o Check hot and cold insulation and inspect visual.
Period: June 2010 to Aug. 2010
Project: Egypt LNG at Damietta. ( Shut Down Activities)
Company: SEGAS
Position: QA/QC Inspector
Responsibilities: o Visual inspection for piping and equipment (vessels-tanks- etc.)
o Thickness measurements for all piping and equipment using ultrasonic device
o Follow up for Repair welds and covering class for Welders about the repair
o Interpretation of RT films.
o Preform NDT as required.
o Witnessing WQT, PQR
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness of hydro test for piping loops
o Punching and Test Pack activities
Period: April. 2010 to May 2010.
Project: Installation of 40 km pipeline
Company: General Petroleum company (G.P.C)
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for welder qualification
o Witness for welding parameters as per approved wps
o Witness surface preparation pre wrapping. And check roughness as per approved
procedure
o Witness for hot wrapping and preform holiday detector.
Period: Feb.2010 till April 2010
Project: Offshore pipe line laying
Company: Petrobel
Position: QC Engineer ( RINA Italy as TPI)
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: Dec 2009 till Feb.2010
Project: Construction of 10 storage tanks (1000 BBS) and 2 Gas boot.
Company: Petro-Alam company
Position: QA/QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for WQT, PQR
o Review and implement ITP
o Review drawing and client specification.
o Witness for all NDT required in ITP as ( PT-RT)
o Witness for hydro test.
o Witness for air test for all nozzles connected to tank body.
o Review calibration certificates for all equipment which used during manufacture or during apply testing.
o Review Hand over of documents.
Period: Oct 2008 to Dec 2009.
Project: On shore Gas pipeline laying ( last stage 400 kms)
Company: Gasco
Contractor: Petrojet
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films, Ultrasonic test
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Check all welding parameters as per approved WPS.
o Witness for WQT-PQR
o Review NDT Reports
o Witness hydro test as procedure
o Review calibration certificates for all gauges used in hydro-test
Period: Aug.2008 to Sep.2008
Project: Off shore pipe line laying
Company: Rashpetco
Contractor: Saipem
Position: QC Engineer
Responsibilities o NDT coordination, performing & evaluation Interpretation of RT films
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: June.2008 to Aug.2008
Project: Maintenance of Propane Factory
Company: United Gas Depravities
Position: QC Engineer
Responsibilities: o NDT coordination, performing & evaluation
o Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Ultrasonic testing for measuring thickness to determined corrosion areas.
o Used pipe locator and DCVG for inspection of buried pipeline
o Witness of hydro-test for piping loop.
o Punching and test package
Period: Jan. 2008 to June 2008
Project: Construction of gas Plant ( El salam Gas Train 3&4)
Company: Khalda
Position: QC Inspector
Responsibilities: o Review of all document such as (Specifications; Drawings)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or
WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic instrument and works to examine Welds &Thickness Measurement) according ITP.
o Full fill of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
installations, including but not limited to hydro test, punch listing, high pressure leak
testing, pipe and pressure vessels cleaning, and all activities relating to plant startup.
o Supervision of NDT, Follow up for Repair welds and covering class for Welders about the repair welds and controlling repairs.
o Performing Welding & Quality Control Inspection at Fabrication Shop and Erection Site
including but not limited to piping fabrication, structural fabrication.
o Witness in fabrication and erection of super duplex and duplex piping
o Control in heat parameter in welding of super duplex and duplex stainless steel
o Witness of pickling and passivation of super duplex stainless steel.
o Witness and Review of corrosion test (G 48)
o Witness for ferrite content to ensure the ferrite content in super duplex as per spec.
o Check for Steel Structure, Pipe Spools, Vessels.
o Performing inspection for buried pipelines using pipe locator and DCVG device
o Performing and Supervising NDT Activities in Various Job sites and facilities e.g. Gas & Oil
Pipe Lines, Oil Storage Tanks. Boiler and Pressure Vessels Fabrications, Constructions
Power Plants Construction, Industrial Projects And Facilities, Fertilizers Plants, Structura
Steel fabrications etc.
o Witnessing for painting systems and insulation (hot-cold)
o Prepare punch list for pipig
Curriculum Vitae
o Prepare hydrotest procedure for pipe line and piping
o Prepare ITP for Tanks and piping
o Hand over the projects.
Period: Nov.2013 -till present
Company: Alghanim International
Project: AZOUR South OCGT Power Plant
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: All inspection activites during construction of storage Tanks
: Peaking and banding check for storage tanks
: Roundness check for storage tanks
: Prepare RT map for tanks
: Follow all NDT for storage tanks
: Plumbness check for tanks
: Prepare hydrotest procedure for tank
: Make handover for tank
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Curriculum Vitae
Period: May.2013-till Nov 2013
Company: Alghanim International
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: May.2013-till Present
Company: Germainscher lloyed
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: prepare WPS and PQR
: prepare ITP
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
Curriculum Vitae
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test
: Handover the project to client
Period: Nov.2012-till May 2013
Company: Germainscher Lloyd Industrial Services
( Kuwait Branch)
o TPI inspection of duplex and super duplex stainless steel piping fabrication and erection.
- Manufacturer: Alghanim International
- Owner: MEW
Project: AZ-ZOUR R.O Desalination plant with Recarbonation System (30 MIGPD) and O&M
Service
Responsibilities: Review welder qualification
: Review welding procedure and PQR
: Verify and assurance the applications of the welding procedures
: Check of equipment Calibrations
: Check of material (Base metal and Filler metal) according Drawing and WPS
: Check of cleanness of joint
: Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
: Dimensional check during assembly and after completion of assembly.
: check Heat Input During welding operation to avoid any corrosion.
: Review corrosion Test (G48) to avoid corrosion after welding.
: Witness of Ferrite test to ensure the content of ferrite as per spec.
: Control of inter pass temperature to avoid more Heat input cause corrosion.
: Witness of pickling and passivation of welded joint to improve corrosion
resistance.
: Check Visual of welds and weld size
: Witness & check NDT work such as (RT; MT; PT and calibrations of : Prepare of NDT Reports.
: Follow up for Repair welds and covering class for Welders about the repair.
: Prepare hydro test package. And punch list.
: Witness for Hydro test.
Curriculum Vitae
Period: Sep. 2012- to Nov.2012
Company: Germanischer Lloyd Industrial Services
(Kuwait Branch)
Projects:- o TPI inspection and expediting of TPI inspection and expediting of Fabrication of 58
Cement lined piping
- Manufacturer: Raymond International
- Client: Hyundai
- Owner: KOC
- Project: Installation Of Low Sulphur Fuel Oil, Fuel Gas And Gasoil Pipeline From
Mina Al- Ahmadi
Responsibilities: o Review all documents ( WPS-PQR-Drawing-procedures-Material certificates)
o Review ITP
o Review dimension as per drawing.
o Review welding parameters as per WPS.
o Witness for welder qualification.
o witness for NDT
o Interpretation of RT films for butt welds, DPT fillet welds.
o Witness for cold wrapping for spools
Period: September 2010 September 2012
Project: Construction of LNG plant and construction of 3 spherical Tanks (3000 m3)
Company: Egyptian Bahraini Gas Derivatives company (EBGDCO)
Position: QA/QC Inspector
Responsibilities:
o Review of all document such as (Specifications; Drawings)
o Review Inspection and Test Plan (ITP)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification.
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic
instrument and works to examine Welds &Thickness Measurement) according ITP.
o Review of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
Curriculum Vitae
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
o Witness of surface preparation for painting
o Witness for apply painting system as required, inspect paint visual and DFT.
o Check hot and cold insulation and inspect visual.
Period: June 2010 to Aug. 2010
Project: Egypt LNG at Damietta. ( Shut Down Activities)
Company: SEGAS
Position: QA/QC Inspector
Responsibilities: o Visual inspection for piping and equipment (vessels-tanks- etc.)
o Thickness measurements for all piping and equipment using ultrasonic device
o Follow up for Repair welds and covering class for Welders about the repair
o Interpretation of RT films.
o Preform NDT as required.
o Witnessing WQT, PQR
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness of hydro test for piping loops
o Punching and Test Pack activities
Period: April. 2010 to May 2010.
Project: Installation of 40 km pipeline
Company: General Petroleum company (G.P.C)
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for welder qualification
o Witness for welding parameters as per approved wps
o Witness surface preparation pre wrapping. And check roughness as per approved
procedure
o Witness for hot wrapping and preform holiday detector.
Period: Feb.2010 till April 2010
Project: Offshore pipe line laying
Company: Petrobel
Position: QC Engineer ( RINA Italy as TPI)
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: Dec 2009 till Feb.2010
Project: Construction of 10 storage tanks (1000 BBS) and 2 Gas boot.
Company: Petro-Alam company
Position: QA/QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Witness for WQT, PQR
o Review and implement ITP
o Review drawing and client specification.
o Witness for all NDT required in ITP as ( PT-RT)
o Witness for hydro test.
o Witness for air test for all nozzles connected to tank body.
o Review calibration certificates for all equipment which used during manufacture or during apply testing.
o Review Hand over of documents.
Period: Oct 2008 to Dec 2009.
Project: On shore Gas pipeline laying ( last stage 400 kms)
Company: Gasco
Contractor: Petrojet
Position: QC Inspector
Responsibilities: o NDT coordination, performing & evaluation Interpretation of RT films, Ultrasonic test
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Check all welding parameters as per approved WPS.
o Witness for WQT-PQR
o Review NDT Reports
o Witness hydro test as procedure
o Review calibration certificates for all gauges used in hydro-test
Period: Aug.2008 to Sep.2008
Project: Off shore pipe line laying
Company: Rashpetco
Contractor: Saipem
Position: QC Engineer
Responsibilities o NDT coordination, performing & evaluation Interpretation of RT films
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness of ultrasonic test as ITP required.
o Witness during weld repair
o Witness of PQR-WQT
o Witness for foam Wrapping before laying and witness for holiday detector survey
Curriculum Vitae
Period: June.2008 to Aug.2008
Project: Maintenance of Propane Factory
Company: United Gas Depravities
Position: QC Engineer
Responsibilities: o NDT coordination, performing & evaluation
o Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check) fabrication and erection.
o Ultrasonic testing for measuring thickness to determined corrosion areas.
o Used pipe locator and DCVG for inspection of buried pipeline
o Witness of hydro-test for piping loop.
o Punching and test package
Period: Jan. 2008 to June 2008
Project: Construction of gas Plant ( El salam Gas Train 3&4)
Company: Khalda
Position: QC Inspector
Responsibilities: o Review of all document such as (Specifications; Drawings)
o Witness, Review (PQR and WPS) according to World Standard (ASME & API and AWS
CODES)
o Check and establish Welder Qualification
o Establish and review procedure of NDT
o Verify and assurance the applications of the welding procedures
o Check of equipment Calibrations
o Check of material (Base metal and Filler metal) according Drawing and WPS
o Check of cleanness of joint
o Checking fit up of the joint before start welding operation as per the detailed drawing or
WPS such as (root gap, bevel angle, surface mismatch; high-low)
o Dimensional check during assembly and after completion of assembly.
o Check Visual of welds and weld size
o Witness & check NDT work such as (RT; MT; PT and calibrations of Ultrasonic instrument and works to examine Welds &Thickness Measurement) according ITP.
o Full fill of NDT Reports.
o Follow up for Repair welds and covering class for Welders about the repair.
o Witness & check of Pressure Test
o Witness of Flushing process to piping
o Prepare punch list for process skids
o Punching and test pack activities for off skid piping.
Period: Aug. 2007 to Dec. 2007
Project: Offshore pipeline laying 62 km
Company: petrobel
Position: Q.C inspector
Contractor: Saipem
Responsibilities:
Curriculum Vitae
o NDT coordination, performing & evaluation. Interpretation of RT films.
o Performing pre during and post welding inspection (Fit up welding monitoring, visual, and dimension check)
o Witness for ultrasonic testing according to approved ITP
o Review NDT reports
o Witness for WQT & PQR
o Witness for weld repair
o Witness during foam injection wrapping upon field joint before laying