Ibrahim AbouElfetouh, Senior Cost Control Engineer

Ibrahim AbouElfetouh

Senior Cost Control Engineer

Madaar Development

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Civil Engineering
Expérience
13 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 8 Mois

Senior Cost Control Engineer à Madaar Development
  • Egypte
  • Je travaille ici depuis mai 2017

1. Participating in feasibility studies and pre-construction stages and assisting in the preparation of the financial models.
2. Evaluating tender documents.
3. Establishing and developing the projects’ control systems.
4. Preparing the bill of quantities and budget with items breakdown for each activity including cost coding.
5. Tracking contracts, scopes of work, purchase orders, as they relate to budget, contract commitments, schedules and progress
6. Preparing the actual cost and load it to the respective budget codes.
7. Preparing and updating the cash-flow diagram.
8. Controlling the performance cost for each ongoing item on monthly basis.
9. Finalizing the EAC (Estimate at completion) for each project.
10. Preparing the commercial report for each project in each certified IPC (interim payment certificate).
11. Preparing the presentations and attending the required meetings with the projects’ parties including top management and contactors.
12. Prepare the planning package
13. Searching for and leasing with the qualified contractors / suppliers for the different project disciplines to meet the project’s cost plan.
14. Preparing Material List for all items for Procurement and following up the procurement cycle till the material delivery and execution start.
15. Monitoring the subcontractor’s invoices and the new contracts (subcontractors or suppliers).
16. Coordinate with the designers and project team to receive the design packages and authorities’ approval on time
17. Revising the clients and subcontractors’ variations.
18. Find out cost solutions for any negatively impacted cost performance indices items.
19. Weekly site visits to follow up work progress upon recommendations.

Project Control Engineer à Coprosa Group
  • Egypte
  • juillet 2016 à mai 2017

Project: New Cairo Capital Resedential Buildings
Responsibilities: updating schedule as planning engineer set quantity survey for quantities and invoices for subcontractor and main contractor .

Senior Civil Engineer à Saudi Binladin Group
  • Egypte - Le Caire
  • mars 2015 à juillet 2016

Quantuty surveying and project control for mega projects like
Alazhar university and mosque
cairo wfestival city appartment
almaza mall
marassi
mivida
alnozha alexandria airport

Senior Civil Engineer à ACT
  • Egypte - Le Caire
  • juillet 2014 à mai 2016

work as contractor for many priject and particpate in tendering and purchasing for some projects.
accomplish many villas and apprtments for concrete skeleton and all types of finishes

Project Engineer of Post Tensioning System à Saudi Binladin Group
  • Arabie Saoudite - Jeddah
  • mai 2012 à juillet 2014

Working at SaudiMarasem (Saudi Binladin Group)
-project: (King Abdul Aziz International Airport, Jeddah, KSA)
(Prestressed Concrete Bridge) Span 1.5 km
-position: Responsible for all Post tensioning System
(Installation of Cables, Fixing, Stressing, Grouting)
As site Engineer and Technical Support

Site Engineer à Saudi Binladin Group
  • Egypte
  • mars 2012 à mai 2012

• From March 2012 to May 2012
Working at ElMarasem (Saudi Binladin Group)
-project: (ELHayat Heights compound, New Cairo)
-position: Responsible for all concrete construction of a sporting Club with
Different levels in slab, swimming pool & pump rooms

Site Engineer à Saudi Binladin Group
  • Egypte
  • septembre 2011 à mars 2012

• From September 2011 to March 2012
Working at ElMarasem (Saudi Binladin Group)
-project: (INMA MALL, New Cairo) 12, 000 m2
-position: Responsible for Releasing of Steel Structure (900 ton)
Excavation & Construction of new Concrete Structure

Site Engineer à Saudi Binladin Group
  • Egypte - Hurghada
  • juin 2010 à septembre 2010

Summer Training
• Summer 2010 Training at ElMarasem (Saudi Binladin Group)
-project: (HURGHADA NEW AIRPORT, Hurghada)
-position: Construction of labour residence
Construction of roads at the airport
Technical Structural department

Site Engineer à Construction Company
  • Egypte
  • juin 2009 à septembre 2009

• Summer 2009 Worked at Construction Company
-project: (villa at New Cairo)
-position: Supervised on all brick walls works

Site Engineer à Talaat Mostafa Group
  • Egypte
  • juin 2008 à août 2008

• Summer 2008 Training at Talaat Mostafa Group
-project: (Madinaty City, New Cairo)
-position: ECG -• Technical Structural department
Alexandria for construction-• construction of high Buildings
• Training at Talaat Mostafa Group
-project: (AlRehab City 2, New Cairo)
-position: Alexandria for construction-• construction of villas

Éducation

Baccalauréat, Civil Engineering
  • à Ain Shams University
  • janvier 2011

2006 - 2011 Bachelor of Engineering Civil Engineering, Structural department Ain Shams Univ

Specialties & Skills

Swimming
Aircraft
Installation
AMBITIOUS
AUTOCAD
CONCRETE
ENGINEER
EXCAVATION
POST TENSIONING
POST-TENSIONING
TECHNICAL SUPPORT
TRAINING

Langues

Arabe
Expert
Anglais
Expert