Production and Maintenance Manager
Sulieman A.R Namlah
مجموع سنوات الخبرة :19 years, 0 أشهر
working as Production and Maintenance manager
commissioning of Quadra (Q12) plant and then test production. also then controlling regular production as 205 pallets per hour production .
management for all three plants at one time .masa 9.2 2010 version, masa 9.2 fast version both in Yanbu and quadra Q12 plant at Madina site.
setup of maintenance teams to cover the maintenance requirements for all plants.
spare parts demand and follow up with masa and quadra .
achievements; after joining the company increased production from 31000 pallets to 85000 pallets per month at plant no 1 having masa 9.2 2010 version.
preventing maintenance schedule prepared to achieve the required target.
a decrease in expenses up to 25 %.
rejection decreased from 11% to 1 % .
commissioning of new masa plant 9.2 fast version.
production and maintenance training by German team and supporting them in this field.
managing both masa plant at Yanbu site along with the erection of Quadra Q12 plant at Madina site .
Deputy plant manager masa plant 9.2 xl for concrete masonry blocks and interlocks.
INTERNSHIP (three months) RESPONSIBILITIES ATTEND DAILY TRAINING EXERCISES. WORK ON LT AND HT PANELS. DRAWING LESSONS AND WORK ACCORDING TO DIAGRAM. DESIGNING PLC. AND INSTALL ALL THE EQUIPMENT'S THAT ARE REQUIRED. TROUBLESHOOT ELECTRICAL FAULTS. TRANSFORMER DISTRIBUTION AND TRANSFORMER REPAIR AND MAINTENANCE. INSTALLATION OF A NEW 20 MVA TRANSFORMER DURING INTERNSHIP. EARTHING, AND TRANSFORMER TESTING. instrumentation (installation of RTD, Pressure gauge, THERMOCOUPLES.LEVEL switch and ext. worked on cement mill, raw mill, PLC, CONTROL, KLINKER yard, and ep section during an internship. ALSO WORKED ON CRUSHER, AND STACKER RECLAIMER. INSTRUMENT REPAIR AND MAINTENANCE. ELECTRONIC CIRCUITS REPAIR AND MAINTENANCE. PROJECT WORK ON PURGING CARD (DESIGNED AND INSTALLED FOR EP SECTION)
Become Assistant production manager in June 2008.
rearranged the production team and maintenance team.
increased production up to 21 % in three months time.
regular maintenance schedules to maintain the machine.
PAK DREAM (PVT) LTD.HATTAR ASSISTANT ELECTRICAL ENGINEER (OPERATOR) 04 April 2005 to 11 MAY 2008.
operating the machine and guiding maintenance team.
Requested by the owner of the factory to make training of the workers there at Rana block factory .
making production training and management.
implementing the rules and regulation for the worker.
this all was done by mutual understanding between both factory owners .
B.Sc
passed IELTS test with 6 bands. English language test .
Advance diploma information technology
SESSION 2001 TO 2004 2ND DIVISION, B.T.E Peshawar.
S.S.C SCIENCE SESSION 2001 1st division, BISE Abbottabad