Ihab galal el nakeeb, deputy project manager

Ihab galal el nakeeb

deputy project manager

moharam-bakhoum consultants

Lieu
Egypte
Éducation
Baccalauréat, Civil Engineering Technology and Construction
Expérience
19 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 1 Mois

deputy project manager à moharam-bakhoum consultants
  • Egypte - Alexandrie
  • juin 2022 à juin 2024

The project is construction of multipurpose Moruj-Smouha green city compound which consists of 192 buildings (2B+G+M+13F) and 340 villas, all are constructed on 172 Hiktar of land, including infrastructure works, roads, landscaping and mega substation, all constructed by Egyptian Army and 20 Developers.
Our main task is project management and quality assurance as we are the Egyptian Army representative.

senior project manager à future house contracting co.
  • Egypte - Alexandrie
  • juin 2021 à juin 2022

the project is to increase the width of Sidi Gaber wave breaker to allow the construction of a new mall called (the walk). This extension and modification works executed in a very hard weather and very bad climate as the waves and rain was the main constrains to succeed in our plans.

Construction Project Manager à golden bay contracting & trading
  • Qatar - Doha
  • décembre 2019 à novembre 2020

The project is construction of a commercial building (5B+G+3P+22F) will be used as Dukhan Bank Head Quarter. the building is constructed in Lusail district which has special regulation to be strictly followed.
in this time COVID-19 pandemic reached to Qatar and we fight it with all means till we succeed to achieve our target.

Construction Director à orientals enterprises W.L.L
  • Qatar - Doha
  • décembre 2017 à novembre 2019

The project is construction of 4 hotel towers \{5B+G+3P+(25-48)F\} for marriott, obroy and retaj the area was in the city center which was surrounded by 4 main roads which makes my life difficult to arrange the supply of materials on timing schedule to not to disturb the traffic. following the design drawings to get it on time to achieve my work schedule.

Construction Project Manager à Gettco
  • Qatar - Doha
  • juin 2017 à décembre 2017

the project is modification and alteration to convert an existing residential building (3B+G+37F) to a commercial building (fully furnished apartments).
the target was to handover all types of mock-ups to the client to allow him to purchase the furniture as per the approve interior design and approved mock-up sample.

Construction Project Manager à inshaa
  • Qatar - Doha
  • août 2016 à juin 2017

the project is construction of multipurpose city (Madinat Mwater) phase-1 consists of showrooms, residential units, infrastructure works, roads, landscaping, holding tanks and substations.
the project was on delay when i took the charge.
i used all project management skills to achieve my target and to complete the project on time.

Construction Project Manager à Ghantoot construction & transport development
  • Qatar - Doha
  • février 2015 à août 2016

the project is construction of 4 buildings on 4 different plots (5B+G+10F) in lusail district and were near to the sea which makes the de-watering operation is challenging one. more over the lusail city utilities were located very near to the plots deep excavation which makes the excavation and piling activities are very difficult.

senior construction manager à arabtec construction co.
  • Qatar - Doha
  • janvier 2010 à février 2015

construction of 3 main projects in qatar and are well known ( twin towers - west bay) 3B+GF+3P+49FL, ( msheireb down town - hart of doha phase 2) 5B+GF+19FL, ( qatar world trade center - dafna) 4B+GF+2P+50FL.
each project has his own points of challenge and construction methodology and logistic plan.

Construction Manager à Arabtec Construction
  • Émirats Arabes Unis - Dubaï
  • décembre 2004 à janvier 2010

construction of 4 mega projects well known in dubai as movenpick hotel & spa and oceana residences 9 buildings (3B+GF+17FL) and tiara palm dubai hotel and residences 9 buildings (3B+GF+17FL) and truck & service tunnel (1.5 km length) and jumeira beach residences 13 buildings (3B+GF+5P+52FL).
all above projects have their own points of challenge.

Éducation

Baccalauréat, Civil Engineering Technology and Construction
  • à faculty of engineering - alexandria university
  • juin 1985

bachelor of sience in civil engineering graduated in 1985 with grade good

Specialties & Skills

Site Planning
Coordination
Technical Support
Team Leadership
Multi site Management
All construction site management skills
comunication and leadership
computer literacy
safety and quality management
problem analysis and solutions

Langues

Anglais
Expert
Hindi
Moyen
Arabe
Langue Maternelle
Français
Débutant

Adhésions

rotana health club
  • member
  • May 2012
egypt syndicate of engineers
  • civil engineer
  • July 1985
society of engineers - UAE
  • civil engineer
  • November 2001
engineering & consulting offices accrediting committee - Qatar
  • civil engineer - supervision
  • May 2016

Formation et Diplômes

Understanding Green (Formation)
Institut de formation:
TATWEER
Date de la formation:
May 2008
Public Relation (Formation)
Institut de formation:
Public Relation Development Institute
Date de la formation:
May 1995
Health and Safety for hazard identification from Highfields (HABC), UK (Certificat)
Date de la formation:
December 2013
Project Management Professional (PMP) exam (Certificat)
Date de la formation:
April 2015
LEED in Construction (Formation)
Institut de formation:
Green Building Services
Date de la formation:
June 2013
Primavera Contract (Formation)
Institut de formation:
CMCS
Date de la formation:
January 2010
Construction Safety (Formation)
Institut de formation:
Dubai Municipality
Date de la formation:
March 1995
ms prject, exel and word (Formation)
Institut de formation:
nadia institute, dubai
Date de la formation:
June 1997
Durée:
36 heures
safety at construction site (Formation)
Institut de formation:
dubai municipality
Date de la formation:
September 1995
Durée:
24 heures

Loisirs

  • water ski, water polo, swiming, sailing, wind surfing, snorkling and fishing
    Got awarded for many local and international championships in swimming and sailing.