Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Iqbal Nugraha

Radio Network Optimization Network Integration Service (NIS)

Location:
Indonesia
Education:
Bachelor's degree, Telecommunication Engineering
Experience:
4 years, 3 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  4 Years, 3 Months   

January 2012 To February 2013

Radio Network Optimization Network Integration Service (NIS)

at Huawei Technologies
Location : Indonesia
RNP Part :
o Updating Database
o Make prediction coverage plot using U-NET / Atoll
o Find and Candidate for Tower Sharing and Site Build,
o Validate Candidate for B2S
o DRM with other team based on survey report.
o Create RF Solution for 3G Colo
o Make TSSR for 3G Colo
o Create Justification report ( Out Of SAR, Decrease Antenna)

RNO Part :
• Supervise Subcontractor team for Single Site Verification all 2G/3G new site
• Make sure Performance for all new site integration and coordination with Project and another technical team (BSS, Microwave, and Datacomm)
• Lead KPI before and after related to Roll Out activity such as new site, BSC/RNC Rehoming, LAC Splitting.
• Analyse and make immediate action related with every performance degradation. Make a good cordination and communication with other division to handle and rectify the problem as soon as possible.
• Conduct L0 KPI Priority One and Priority Two achievement for 2G and 3G new site
• Analyze all counter related to KPI Accessibility, retain ability, integrity, and mobility,
• Conduct all Engineering Parameter, Neighbor, and License for all 2G and 3G new site
• Supervise Parameter and Physical changing for PAC (acceptance) 2G and 3G.
• Lead Paging Success Rate for 2G and 3G based on Core Level KPI
• Supervise PAC and SSV Drive Test Activity. Improving KPI such as HSDPA Throughput, CSSR, DCR, and signal quality (EcNo & RxQual).
• Lead 2G and 3G Unblock Target New Town Launch.
• Lead for New Parameter Trial especially for New Site
• Analyze for any capacity issue (TRX, CE, IUB, Code) and utilization
• Support for Core KPI such as Paging Success Rate and give action for Island RAC and LAC
• Create Registration LAC CI 2G and 3G to Core and billing for New Site and Rehoming acitivity
• Create Consistency check for rehoming activity and prepare for Unblock requirement
• Tracing message each interface GSM and UMTS from LMT for analysis problem,
February 2012 To February 2012

Trainer

at Bandung Techno Park
Location : Indonesia
- Wireless Concept
- Radio Trunking Concept
- Planning Radio Trunking
- Simulation Radio Truking
January 2011 To January 2012

Head of Assistant of Mobile Communication Laboratory

at Mobile Communication Laboratory
Location : Indonesia
• Responsible for Research Mobile Communication Concept 2G (GSM, CDMA IS 95), 3G (CDMA 2000 EVDO, UMTS), HSDPA, HSUPA, LTE, Small Cell (Femtocell)
• Responsible for GSM and UMTS Drive Test Practicum
• Responsible for Research Tool Mobile Communication Planning Tool (Atool, Tems Cell Planner, RPS (Indoor)), Drive test Tool (TEMS Invest), Optimization Tool (Actix, TEMS Route), Reporting Tool (Map Info, GE)
July 2011 To September 2011

Wireless Engineer

at PT Freeport Indonesia
Location : Indonesia
Planning Radio Trunking
Maintenance Radio Trunking
Configuration
January 2011 To February 2011

Internship DT and RF Optimization

at PT. IGTL Solution
Location : Indonesia
Drive Test
Reporting Logfile
Optimization
January 2010 To January 2011

Head of Optical Communication Research group

at Optical Communication Research Group
Location : Indonesia
• Responsible for Optical Concept, Communication Concept
• Responsible for Optical Tool such as OTDR, Fusion Splicer, PLR/RTB Tool
• Research about DWDM, Optical communication, GPON

I

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
January 2012

Bachelor's degree, Telecommunication Engineering

at Telkom Institute of Technology
Location : Bandung, Indonesia
Grade: 3.83 out of 4
Final Year Project :
Comparative Analysis Topology Backhaul in Long Term Evolution

The objective of the project is to analysis about Topology X2 interface in LTE, in my case I use 3 topology Mesh, Ring, and Tree. I create simulation use OPNET 14.5 for calculate QOS performance based on delay and throughput.

التخصصات والمهارات

LMT , M2000 , and CME for Huawei Network Parameter Execution

TEMS Investigation for drive test tools

RAN tuning & optimization tools for Huawei equipment such as PRS, Smart RNO, UNET 3.7, and OMSTAR V5

operate Geographic Information System software such as MapInfo, Global Mapper, Google Earth

• Have knowledge about cellular network architecture and technology, such as GSM, WCDMA, HSPA, and L

TEMS Route Analysis, Actix, etc as software tools for cellular network analysis and optimization

Radio Planning Tool such as RPS(Indoor Planning) , Atoll/UNET, TEMS Cell Planner,

تخطيط شبكة الراديو

استمثال الشبكات

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Beginner

Training and Certifications

3G Wirelles RAN Optimization by Huawei ( Training )

Huawei
November 2012

LTE TDD/FDD Planning and Optimization ( Training )

Huawei
January 2013

UMTS Fundamental ( Training )

ZTE
November 2011

Loading
Loading...
Loading...