Resident Engineer-Electrical في Parsons Brinckerhoff
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ ديسمبر 2007

Project:
33/11kV Primary Substations, 11/0.415kV Distribution substations, 33kV, 11kV and LV cabling works in ICAD and Khalifa Port and Industrial Zone in Abu Dbabi.

Key Responsibilities:

• Monitoring contractor Quality control Program, this includes site inspection for compliance with Contract Documents, approved submittals in conformance to electrical codes and contract requirements. Maintaining project safety awareness and enforce company safety policy.

• Liaising and daily following up with the contractor. This is to ensure the contractor is managing its resources, health and safety, and equipment needs on the site.
• Coordinating with client area engineers during the site inspections and Site Acceptance Test for equipments.
• Performing or monitoring inspections on the following:

i. Installation of Power Transformer, Distribution Transformer, 33kV and 11kV GIS, 11kV AIS, RMU, Capacitor Bank, Battery Bank, Battery Charger, control and relay panels, LVAC panel and metering system.
ii. Installation of earthing grid, earthing risers and other works.
iii. Substation internal high and low voltage cable pulling, terminations, cable tray installation and other miscellaneous items in the basement,
iv. For O/G and I/C Feeders, 33kV and 11kV cabling works.
• Issuing site memo to the contractor if deficiencies found during execution of works.
• Monitoring the safety measures on daily basis if found not satisfactorily, issuing a site memo and performing safety walk twice a month
• Attending Site Acceptance Test for substation equipments which includes Power Transformer, Distribution Transformer, 33kV and 11kV GIS, 11kV AIS, RMU, Capacitor Bank, Battery Bank, Battery Charger, control and relay panels, LVAC panel, SCMS, metering system and cables in coordination with client engineer according to approved SAT procedure and formats.
• Participating in final site inspection and preparing snag/punch lists.

Project Engineer في SNC LAVALIN
  • قطر - الدوحة
  • أبريل 2007 إلى سبتمبر 2007

Project:
400kV Doha South Substation and 400kV O/H line from Doha to Salwa
Key Responsibilities : Supervising all electrical and mechanical works.
(Worked only six months in Qatar for this project on Visit Visa

Project Engineer I في Saudconsult deputed in Saudi Electricity Company and SNC LAVALIN
  • المملكة العربية السعودية - الدمام
  • أبريل 2001 إلى مارس 2007

Projects: 132kV/33kV/11kV Substations, Generating Plant (Gas Turbine) under Project Management Department, Saudi Electricity Company and GCC Interconnection Project phase I- 400kV Transmission Substation, Saudi Arabia.

Key Responsibilities:
• Coordinating and controlling project construction by continuous inspection of work progress for quality, workmanship and conformance with plan, project technical specification and drawings.
• Maintaining the project safety awareness and enforce company safety policy.
• Performing or monitoring inspections on the following:

i.Installation of Power Transformer, Distribution Transformer, 132kV GIS, 33kV and 11kV A AIS, RMU, Battery Bank, Battery Charger, control and relay panels, LVAC panel and metering system.
ii. Installation of earthing grid, earthing risers and other site works as per IFC drawing and technical specification.
iii. Substation internal high and low voltage cable pulling, terminations, cable tray installation and other miscellaneous items in the basement,
iv. Inspection of materilals delivered on site relevant to approved documents.
• Witnessing site test of substation equipments which includes Power Transformers, Station Service Transformers, 132kV GIS, 33/13.8kV Metal Clad Switchgear, control and relay panels, Protection relays, LVAC panel, DC charger and DCDB, Battery Bank, HV / LV power cables & control cables, SCADA system etc. according to approved test procedure and formats.
• Participating in final site inspection and preparing snag/punch lists.
• Working within project management team, the following responsibilities.

i. Reviewing contractor’s technical submittals and coordinating with other divisions for consolidating their respective requirements/comments to finalize the approval of proposed equipments and design calculation.
ii. Site acceptance/commissioning tests submitted by the contractor and preparing comments and sending to the contractor for incorporating.

Assistant Engineer في Rajasthan State Electricity Board
  • الهند
  • مايو 1999 إلى مارس 2001

Projects: 220kV/132kV/33kV/11kV Substations, Rajasthan State Electricity Board, India

Key Responsibilities:

My responsibilities were during working in construction management division in Rajasthan State Electricity Board for construction of 220/132/33kV and 132/33kV substations.

• I worked as a lead engineer for the projects which involved planning, monitoring, controlling and execution of substations works.

Details of responsibilities are same as indicated below for the duration April 1989 to August 1998 in Rajasthan State Electricity Board.

Construction Engineer في Saudi Arabian Bechtel Company
  • المملكة العربية السعودية - ينبع
  • سبتمبر 1998 إلى أبريل 1999

Project: Yanpet Infrastructure Expansion Projects for Engineering, Procurement & Construction (EPC) (Joint Venture S.A. Bechtel and S.A. Parson Limited)

Key Responsibilities: My responsibilities included field engineering and supervising the construction projects for compliance with the design drawing client specification and code requirements and verify the equipments received at site are in accordance with the approved documents.

Performing inspection on installation and witnessing of testing and commissioning of electrical equipments of below projects. The works have been monitored in three projects are as under:

• Installation, testing and commissioning of four 250MVA, 380/115kV and two nos. 88MVA, 115/34.5kV Power Transformers, Station Service Transformers, 380kV Gas Insulated Switchgear, 380kV Surge Arrester, 380kV busduct, 115kV GIS, 34.5kV metal clad switchgears, 34.5kV busduct and relay panels, grounding system, Battery Chargers and Battery Bank, ACDB and DCDB etc.
• Installation, testing and commissioning of 115kV, 800/1000mm2 XLPE Power cables Route length- 2.5km( total length-20km)

Assistant Engineer في Rajasthan State Electricity Board, India
  • الهند
  • أبريل 1989 إلى أغسطس 1998

Projects: 220kV/132kV/33kV/11kV Substations, Rajasthan State Electricity Board, India

My responsibilities were during working in construction management division in Rajasthan State Electricity Board for construction of 220/132/33kV and 132/33kV substations.

• I worked as a lead engineer for the projects which involved planning, monitoring, controlling and execution of substations works.
• Review of project specifications, engineering documents/drawings for equipment layout, scheme drawings, substation earthing etc.
• Performing inspection on installation and witnessing of testing and commissioning of 220kV/132kV/33kV substations which includes Power Transformers, Station Service Transformers, Circuit Breakers(Vacuum, SF6 make BHEL, ABB, SIEMENS etc.), Capacitor Bank, Disconnecting Switch, Earthing Switch, Current Transformers, Voltage Transformers, Lightning Arrester, protection relays, AC Auxiliary Power supply 400/220V with auto transfer scheme (main ACDB, Sub ACDB) & DC Auxiliary Power supply110/220V DC (Battery Bank, Battery chargers and Main DCDB, Sub DCDB), control cables, motors etc.
• Preparing estimate for new projects.
• Participating in construction progress meetings. Participating in final site inspection and preparing snag/punch lists.
• Preparing site progress reports.
• Arranging weekly site meeting to review the progress schedule and solve the site technical problems.
• Supervising 132kV overhead Transmission lines stub setting, tower erection, stringing, sagging and testing.
• Performing inspection on outdoor lighting, Building lighting, substation road lighting and colony street lighting.

Site Engineer في Sonaa Engineers Private Limited
  • الهند - جايبور
  • سبتمبر 1986 إلى مارس 1989

Projects: 132kV O/H lines and 132/33kV Substations

Key Responsibilities:

The works have been supervised in the projects are as under:

• Supervision of 132kV O/H line works which includes reviewing the drawings before submitting to the client, stub setting, tower erection, stringing of conductor, grounding of towers and testing & commissioning of line.
• Installation of substation busbar and equipment structure, stringing of bus bar.
• Liaising with the client for technical issue and progress measurement.
• Installation of earthing grid and measuring the earth resistance.
• Control cables laying from control room to outdoor equipments.
• Installation of outdoor and indoor lighting system.
• Installation of power transformer and distribution transformers.
• Installation of Isolator and earthing switch.

الخلفية التعليمية

بكالوريوس, Power Electronics,Electrical Machine,Electrical Power System,Protection of Power App.,Control system
  • في Muzaffarpur Institute of Technology
  • يوليو 1986

Specialties & Skills

Project Supervision
Equipment Installation
System Testing
Construction Drawings
Construction Documents
Supervising testing of Power Transformers, GIS, AC/DC system, Capacitor Bank, Relays, P. cables etc.
Reviewing engineering documents and drawings related to substation and Cabling works
Management of HV/MV substation construction and Transmission / Distribution Cabling Works
Excellent analytical,communication and interpersonal skills, ability to perform under pressure
Performing installation checks and quality control for all substation equipments and power cables