Islam Alqasaby, Senior electrical engineer

Islam Alqasaby

Senior electrical engineer

Meinhardt

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Electrical Engineering
Expérience
20 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 5 Mois

Senior electrical engineer à Meinhardt
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis juillet 2017
Senior electrical engineer à MEINHARDT
  • Qatar - Doha
  • août 2016 à juillet 2017

Project: Doha Metro Green Line Elevated and at Grade
Period: Aug 2016 to Present
• Carry out design verification for MDBs, SMDBs, DPs, cables and cable containments sizing, voltage drop and short circuit calculation.
• Carry out design verification for selected lighting luminaires.
• Review and validate the coordination and discrimination study for the protective devices.
• Review the technical submittal of the electrical equipment and confirm their compliance with the project’s employer and contractor requirements.
• Coordinate with other disciplines (Mechanical, Civil and Architecture) regarding the electrical installations.
• Attend the technical meetings called by the employer and contractor to discuss their comments on the technical submittals.
• Share in the technical evaluation of the electrical material suppliers based on their compliance to the international standard, as well as the employer and contractor requirements.
• Prepare daily, weekly and monthly progress reports for the assigned scope of my team.

Electrical projects department manager à Alkawn Alsaudi
  • Arabie Saoudite - Riyad
  • mai 2009 à août 2016

- Carry out analysis to our clients’ RFPs and RFTs to create the work scope preliminary statement, create WBS, decompose WBS into activities, estimate resources, estimate time and cost and risk assessment in order to prepare the technical and commercial proposals.
- Create the work plan and budget for the awarded projects.
- Manage and direct the work of the subcontractors for the outsourced scope of work.
- Review the workshop drawings, as built drawings and technical submittals, and approve it before sending to the client then follow up until get it approved from the client.
- Monitor and control the work in the sites to ensure that the work is progressing according to the relevant work plan, technical specifications and the agreed grade of quality.
Project List:
• SPF Administration building project - Riyadh - KSA
• Private villa project - Riyadh - KSA
• Road Security Patrol Building - MOI - Makah - KSA
• Pumping stations for some cities of Riyadh Province Project - MOWE - Riyadh - KSA
• Al-Quwai’eia Waste Water Treatment Plant - MOWE - Riyadh - KSA
• Alkharj electrical infrastructure project - Riyadh -KSA
• KSU MV power line between KSU1-KSU2 project - RIYADH - KSA
• SIDIR Substation, 5 MVA, 13.8 KV Project - Riyadh-KSA.
• Upgrading substation of 3 MVA to 6 MVA 13.8/6.6 KV - Saudi pump factory - RIYADH -KSA
• Development of the substations of MOD - MINISTRY OF DEFENSE - YANBU - KSA
• Mobily FTTH phase 3 - 45 km SKEC - MOBILY - RIYADH - KSA
• Mobily FTTH phase 2- 25 km CCS - MOBILY - RIYADH - KSA

Automation Department Manager (BMS/SCADA – System Integrator) à Proservice
  • Egypte - Le Caire
  • septembre 2007 à mai 2009

Manage the sales and execusion of the BMS and Industrial automation projects
 Coordinate, review and assess contract submittals.
 Review and process construction for project design submittals and ensure
forms as per existing standards.
 Administer contractor’s work and ensure compliance with submitted
contract documents.
 Inspect work sites, monitor project budget and schedule and check project
plans and drawings.
 Analyze and recommend changes to contracts and prepare necessary
amendments in contract document.
 Manage and submit all reviewed contract document to contract
administrators for further approval.
 Ensure all contract works in compliance with contract documents.
 Prepare project records with details such as field progress, field
conditions, equipment use and corrective actions.
 Prepare monthly report on progress of assigned project with assistance of
schedules, costs spreadsheets and perform analysis on same.
PROJECTS list:
 Minapharm - pharmaceutical factory - 10_th of Ramadan - Egypt
 Public Works Authority - Al Sanni Fresh Water Tanks project - Qatar
 Kuwait oil company -14 administration buildings - Kuwait
 Al-rehab mall - Egypt
 Hyper market - Obour city - Egypt
 Unisun - administration building - 5_th district - Egypt

Senior Electrical and Instrumentation Engineer à MAS
  • Egypte - Le Caire
  • janvier 2005 à septembre 2007

 Specifying market requirements for current and future products by conducting market research supported by on-going visits to customers and/or end-users.
 Full responsibility on achieving the marketing and sales target of the automation products.
 Full responsibility of managing after-sales services for the automation products including but not limited to the installation, testing and commissioning.
 Specifying market requirements for current and future products by
conducting market research supported by on-going visits to customers
and/or end users.
 Full responsibility on achieving the marketing and sales target of the
automation products.
 Full responsibility of managing after sales services for the automation
products including but not limited to the installation, testing and commissioning.

Electrical and Instrumentation Engineer à MAS
  • Egypte - Le Caire
  • janvier 2004 à janvier 2005

 Searching for new clients who might benefit from company products or services and maximizing client potential in designated regions; developing long-term relationships with clients, through managing and interpreting their requirements;
 Persuading clients that a product or service best satisfies their needs in terms of quality, price and delivery; negotiating tender and contract terms and conditions to meet both client and company needs.
 Preparing reports for head office and keeping customer records;
 Supporting marketing activities by attending trade shows, conferences and other marketing events.

Éducation

Baccalauréat, Electrical Engineering
  • à Faculty Of Engineering - Bannha University
  • mai 2003

Bachelor of 5 years, I enrolled and succeed in the following courses: Power Engineering, Power Transmission, Power Distribution, Direct Current, Alternating Current, Electrical Machines AC & DC Motors, Transformers, Generators, All rotating device. Communication and electronics and Automatic Control Systems.

Specialties & Skills

Electrical Engineering
Project Management
Automatic Control
Cost Control
Schedule Planning
Autocad
Cost Control
Primavera P6 Enterprise
MS Excel
MS Word
Project Planning
Cost Estimates
Control systems design, testing and commissioning
substations, Motor control centers, distribution boards, load circuits installation.
site troubleshooting
Project management professional PMP CERTIFIED
Electrical cables works
Testing and commissioning

Langues

Arabe
Langue Maternelle
Anglais
Expert

Formation et Diplômes

Project Management Professional (Formation)
Institut de formation:
CMS
Date de la formation:
March 2016
Durée:
35 heures
Project Management Professional (Certificat)
Date de la formation:
May 2016
Valide jusqu'à:
May 2019
PRIMAVERA P6 (Formation)
Institut de formation:
Proservice
Date de la formation:
May 2008

Loisirs

  • Football
  • Chess
  • Reading
  • Swimming