Technical Office Manager
EG&G middle east
Total years of experience :41 years, 7 Months
HADITHA LAND PORT (going on)
The land port between Saudi Arabia and Jordan
CONSTRUCTION FOR 400 APARTMENT IN HADITHA going on
400 apartment for the land port
BORDER GUARD COMPOUND IN HADITHA(going on
Construct for facilities for the Saudi royal forces under the supervision of the (CORPS)
مدير القسم الانشائي
مدير المكتب الفني لمشاريع الحديثه (انشاء منفذ بري حدودي بين المملكه العربيه السعوديه والاردن ومجمع لحرس الحدود و49 عماره سكنيه بنطاق المنفذ)
SEDER CONSTRUCTION Co.
July 2009 up Nov 2014 As a technical office Engineer.
SPIMACO TOWER
The project is a concrete tower consisting of 22 floors + 4 basements
Responsibilities
•Making (3d) modeling for the tower with (ETABS)
•Redesign the raft for the tower
•Preparing the structural shop drawings for the tower
•preparing the B.B.S for all the elements
•Preparing the surveying points
•checking the quantities for all the elements
500 BED GENERAL HOSPITAL MAKKAH (625 M. SR)
The Project Is Consisting from 4 Buildings the for the main building = 35K m2
Responsibilities
•Making (3d) Modeling For The Total Project With
ETABS&SAFE
•Preparing The Structural Shop Drawings
•preparing the B.B.S for all the elements
•Preparing the surveying points
•checking the quantities for all the elements
DAMMAM DATA CENTER ( 100 M SR)
Responsibilities
•Making (3d) Modeling For The Total Project With
ETABS&SAFE
•preparing the B.B.S for all the elements
•Preparing the surveying points
•checking the quantities for all the elements
-RIYADH AIR TRAFFIC CONTROL TOWER
IN RIYADH AIR BASE (50M SR)
The project is a concrete tower with height = 47 meter Supporting 3 steel stories for mechanical room, rest room and The control room
Plus to 3 stories building as administrating building
Duties include
• Making (3d) modeling for the total project with (etabs)
• Preparing the structural shop drawings
•preparing the B.B.S for all the elements
-OUT PATIENT DEPARTMENT BUILDING
IN KING FAHAD MEDICAL CITY (180, M SR)
The project is a concrete 9 stories including basement with total area = 3400 m ². For each floor and another 2 stories building with area= 6K m ².
Duties include
• Making (3d) modeling for the total project with (Etabs)
• Preparing the structural shop drawings
•preparing the B.B.S for all the elements
•Preparing the surveying points
•checking the quantities for all the elements
-SPECIAL SECURITY FORCES WITH MINISTRY OF INTRIOR (SALBOUKH) (100, M SR)
The project is forming from 22 building with total area=
130K m ²
-SPECIAL SECURITY FORCES WITH MINISTRY OF INTRIOR (QATEIF) (130, M SR)
The project is forming from 30 building with total area=
177K m ²
Duties include
Make full details shopdwg. For each building including redesign for some buildings
-FACTORY FOR ALVAON PHARMA
The project is a concrete factory with area = 1830 m ².
Duties include
Make full design for the factory
-EXTENTION FOR OLD AVALON PHARMA FACTORY
Duties include
Make full design for the extention
-GENERAL ATTORNEY HEADQUARTERS
The project is a five stories concrete building with area
= 1930 m ². For each floor and
Duties include
Make full details shopdwg. For each building including redesign for some buildings
-SAUDI PETRA (A/C) FACTORY in king ABDULLAH economic city
The project is forming from 5 building with total area= 22400 m ² as following:- 1-2 production hungers with
2-storage hunger with area= 2, 8Km ²
3-labouratory building with area= 8K m ²
4-mangement building with area = 6K m ²
Duties include
Make full design for the factory by sap+ etabs
-ADDITIONS OF SINGAPORE EMPASSY IN RIYADH
The project is forming from 6 building
Duties include
Make full details shopdwg. For each building
AL JANADRIA CENTRAL LAPORATORY (50, M SR)
The project is 4 floors concrete framing with hollow core slabs
Responsibilities
•Making (3d) modeling for the total project with (ETABS)
•Design the footing with SAFE
FACULTY OF PUBLIC HEALTH AND TROPICAL MEDICINE
The project is a 3 stories concrete building on piles with area = 1530 m ². For each floor
Duties include
Make ETABS model and made full redesign for the building
Then make detailed shop dwg. for the building
مدسر القسم الانشائي الخاص بشركه سدر للانشاءات
Mohammed Abdul Aziz AL Habib Investement Co.
June 2006 up to June 2009 As a designer Engineer
GERAS ALAKHLAQ SCHOOLS COMPOUND FOR GILS
The Project Is a Compound for Girls with Total Area = 40K m2
Responsibilities
Make Full Design Using the ETABS
Preparing the Detailed Shop Dwg
Jarir Plaza Mall (65, M SR)
The project is a steel structure supported by a concrete pedestals with separated footing.
The project forming from (4) zones with total area= (70K) m ²
Besides a housing building with area = (600) m ² and separated Mosque with area= (400) m ².
Duties include
• Make the required combinations for the reactions which gotten form the steel manufacture company (AL-ZAMIL)
• Design the foundations and pedestals and determining the coordinates for the steel bolts.
• Design the grade beams, slab on grade, septic tanks and water tank.
• Design the attached housing building and the attached mosque.
Panorama Mall (285 MSR)
The project is a concrete skeleton structure with a multi story frame System (spans more than 12 m) and hollow core slaps
The project is forming from (21) zones with total area= (175K) m ²
Duties include
• Divide the project into zones and locate the expansion joints.
• Calculate the actual loads and make (3d) modeling to each zone using the analysis program (SAP)
• Design the frames according to the analysis results.
• Approved the shop drawings for the precast.
• Following the erection for the slaps in site.
IKEA SHOW ROOM (DAHARAN)
The project is a steel structure supported by a concrete pedestals with separated footing
Duties include reviewing the steel structure and the footing.
AL HARAM MALL (RIADH)
The project is a prestressed slaps (hollow core slaps) prestressed beams with precast columns and supported by concrete pockets with isolated footings
The project is forming from (2) main zones with total area= (26K) m ²
Duties include
• Making (3d) modeling for the total project to find the Reactions
• Design the foundation and the pockets according to the reactions
• Design grade beams, slap on grade Water tanks, septic tank
• Approved the shop drawing for the column, beams and the hollow core slaps
• Following the erection processing in site.
مهندس انشائي مصمم
* Bachelor degree in CIVIL Engineering, TANTA Unversity. * Section, May 2005.
بكالريؤس هندسه مدنيه تخصص انشاءات دفعه 2005 بتقدير عام جيد جدا مع مرتبه الشرف تقدير تراكمي 82.92% حاصل علي ACI CERTIFICATION GRADE (1) .