Islam Osama Mohammed Sadeq, Turbo Machinery Maintenance Department head

Islam Osama Mohammed Sadeq

Turbo Machinery Maintenance Department head

EMC

Lieu
Egypte
Éducation
Baccalauréat, Mechanical Engineering - Production and design
Expérience
19 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 10 Mois

Turbo Machinery Maintenance Department head à EMC
  • Egypte - Port Saïd
  • Je travaille ici depuis janvier 2018
Turbomachinery section head à PHPC- Pharaonic petroleum company
  • Egypte - Port Saïd
  • septembre 2013 à janvier 2018

Turbo-Machinery Section head at PHPC- Pharaonic Petroleum Company- is a joint venture company established in Egypt between E.G.P.C., B.P. and I.E.O.C. P.h.P.C. currently operates three natural gas production fields located offshore the Egyptian sector of the Mediterranean Sea. (2013- Now)

My responsibilities are as follows:
1.Execute preventive maintenance planning and job procedures of rotating equipment.
2.Applying and execute computer maintenance material management program of rotating equipment.
3.Following up all the necessary procedures related to work permits collecting all necessary information of rotating machinery which machine components and design as manufacturer recommendations.
4.Applying preventive maintenance (Daily, weekly, monthly, 6 monthly, yearly) and predictive maintenance (condition monitoring) of rotating machines to decrease corrective maintenance, and create new job procedures according to machine history.
5.Making daily, weekly ….etc reports.
6.Conducting onsite troubleshooting and rectification activities, such as in-depth problem analysis, and provide solutions.
7.Establishing machine history records for each machine and using these records to evaluate machine health and running quality.
8.Following up repair items during repair jobs, and prepare spare parts available at wear house.
9.Make technical specification with complete evaluation for all spare parts and tools.
10.Reporting of failure analysis for rotating equipment.
11.Follow up manufacturing spare parts at work shop; make dimension test, and material selection.
12.Selection of lubrication type or equivalent for rotating equipment to apply preventive maintenance as manufacture recommendations.
13.Planning of maintenance activities and time scheduling.
14.Execute corrective maintenance activities of rotating equipment.
15.Managing maintenance team to perform maintenance activities.
16.Follow up continuous monitoring systems (on line systems) including vibration, temperature …etc.
17.Perform and supervise all mechanical maintenance work for:
Pumps manufactured by companies like EBARA, Milton Roy, pompe gabbioneta.
Mechanical seals from JOHN CRANE, flowserve.
Air compressors made by ATLAS COPCO, INGERSOLL-RAND.
Compressors made by IHI, HITACHI, Nuovo Pignone, Man Turbo.
Gas turbines made by GENERAL ELECTRIC, HITACHI, SOLAR.
Diesel engines made by WAUKESHA, CATERPILLAR, CUMMINS, and so many other's. mechanical equipment manufacturers such as air fan coolers towers, heat exchangers, valves and piping

Turbomachinery section head à SEGAS
  • Egypte - Damietta
  • janvier 2010 à septembre 2013

Responsible of all maintenance activities and planning for all maintenance strategies related to turbo-machinery and rotating equipments.
Evaluate machines conditions and insure the reliability of the site rotating equipments.
Manage the required spare parts, tools and manpower needed to perform maintenance work.
Insure that safety and engineering international standards applied.
Establish and manage machines health history and supervise real time machine health monitoring

Rotating equipment Senior engineer à SEGAS
  • Egypte - Damietta
  • janvier 2008 à janvier 2010

Supervise a rotating equipments maintenance team to perform maintenance activities according to safety and engineering standards
Manage spare parts required by the maintenance team and evaluate the machines health conditions
Planning for the maintenance strategies and insure the machines reliability.
Improvements of the maintenance team engineering knowledge and obtain training plan for the maintenance team participants.

Rotating equipment Professional engineer à Egyptian maintenance company (EMC)
  • Egypte - Damietta
  • août 2004 à janvier 2008

Rotating equipment maintenance engineer in SEGAS-LNG plant (union fenosa-Damietta plant-5.4 million cubic meter /year of LNG) . (2004-2013).

Carryout all types of maintenance tasks (PM, CM, PD, ..) according to international work and safety standards.
monitor equipment health and operational condition.
Reporting and evaluate machines health.
Improve working crew knowledge and enhance their ability to perform the required work safely and according to standards.

Éducation

Baccalauréat, Mechanical Engineering - Production and design
  • à Cairo University
  • juin 2004

Specialties & Skills

Preventive Maintenance
Maintenance Management
Predictive Maintenance
Machine Control
Microsoft Office
MS Office
AutoCAD 2D/3D
Automatic Control Using Matlap
Nural net Work using Matlap
الرجاء قرأة السيره الشخصيه المرفقه

Langues

Arabe
Langue Maternelle
Anglais
Expert

Adhésions

Egyptian Engineers Syndicate
  • Active Member
  • August 2004

Formation et Diplômes

bearing lubrcation (Formation)
Institut de formation:
SKF reliability maintenance institute
Date de la formation:
September 2006
Durée:
36 heures
Vibration analysis and measurment (Formation)
Institut de formation:
EMC training and develoment center
Date de la formation:
March 2007
Durée:
48 heures
lubrication analysis (Formation)
Institut de formation:
EMC training and devlopment center
Date de la formation:
February 2006
Durée:
50 heures
First Aid (Formation)
Institut de formation:
Egyptian Red Cercent
Date de la formation:
June 2007
Durée:
36 heures
Nural Net work using MATLAP (Formation)
Institut de formation:
High tech center-Cairo university
Date de la formation:
October 2003
Durée:
18 heures
Programming using MATLAP (Formation)
Institut de formation:
High tech center- Cairo university
Date de la formation:
October 2003
Durée:
18 heures
Automatic control (Formation)
Institut de formation:
High tech center- Cairo university
Date de la formation:
October 2003
Durée:
18 heures

Loisirs

  • swimming
  • football