مجموع سنوات الخبرة :16 years, 9 أشهر

Sr. Quantity Surveyor/Estimator في HSSG foundation contracting
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أغسطس 2022

Preparation of Interim payment applications
Notifications, Preparation and submission of Variation Order.
Evaluation of subcontractor claims & Variation, preparation of Payment Certificates. Settlement of Subcontract Account
Quantities take off from drawings.
Preparation of monthly progress and cost valuation Report
Follow up with consultant, suppliers, and sub-contractors.
Preparation of Final account & Closeout.
Prepare and analyze costing for Tender.
Prepare tender and contract documents, including bills of quantities
Review commercial letters and replay.
Supervising Quantity Surveyors
Tendering Works

Project Quantity Surveyor في Pivot Engineering and General Contracting- (Dubai)
  • الإمارات العربية المتحدة - دبي
  • أبريل 2016 إلى أغسطس 2018

Study project documents / drawings / specification / conditions of contract. General contract and subcontract administration.
Pre and post Contract administration.
Procurement of subcontractors and suppliers preparing tender evaluation reports and Prepare Tender, Contract documents and BOQ’s.
Prepare, analyze and submit to the management Tender report and recommendations. Prepare Contract agreements, Supplementary Agreements, Memorandum of Understandings with the parties for the small and large scale projects.
Developing the Bill of Quantities (BOQ) based on client briefs and basic design proposal in co-ordination with MEPwork packages.
Valuation of work done and preparing the monthly interim payment applications. Prepare techno-commercial evaluation report and recommendations.
Carried out evaluation of interim valuation and final accounts.
Managing the process of pre-qualification of sub-contractors and negotiating the final prices within the budgeted cost and sub-contractor’s procurement.
Managing the payment plans to sub-contractor and cash flows of the project. Managing the projects by monitoring daily manpower and progress of works. The Contract and Administration.
Establishing and controlling the cost control process and identifying the new ways to control the cost by setting templates and procedures project cost control and cost report -CVR. Check, Monitor, verify and advise to the Engineer/Project Manager/ Engineer’s Representatives and Contractors in all related insurances and bonds to the projects.
Cost analyzing in different aspects of the project to minimize the costs and enhance value for money.
Evaluate and certify interim payment applications, Variations and evaluate and advise on contractual Claims (suspension, delay, disruption, reduced rate of progress and termination Claims).
Prepare pre-final and final accounts of the Projects.
Prepare and issue Taking over Certificates, Defects liability certificates, Performance.

Project Quantity Surveyor في Saudi Binladin Group-(PBAD-KSA)
  • المملكة العربية السعودية - الرياض
  • مارس 2012 إلى أكتوبر 2015

Project -1 : King Abdulla Finance District Riyadh (KAFD)
Client : Riyadh Investment Company
Engineer : Dar Al Riyadh
Project -2 : Supplementary Building for Saudi Arabian Monetary Agency
Client : Saudi Arabian Monetary Agency
Engineer : Zuhair Fayez Partnership

Site Quantity Surveyor في Salini Costruttory SPA Dubai Branch
  • الإمارات العربية المتحدة - دبي
  • يونيو 2010 إلى يناير 2012

Project -1 : R800/6 - Improvement of Interchange No.1 on Sheikh Zayed Road
Client : Roads and Transport Authority
Engineer : PARSONS, DE Leo Cather (O) Ltd.
Contract Value : 700, 000, 000.00 AED
The Project involves the construction of Bridges & Underpass, Roads, DEWA-ED, Irrigation, water works, Sewerage and drainage work, street lighting works, Etisalat, Landscaping etc,

Quantity Surveyor. في Al-futtaim Carillion
  • الإمارات العربية المتحدة - دبي
  • أبريل 2008 إلى فبراير 2009

Project : Dubai Motor City - Up Town Area 2
Client : Union Properties PJSC.
Project Managers : Edara
Consultancy : Burt Hill
The Project involves the construction of high-standard and luxury Residential Apartments and Buildings located within in the Uptown Motor city. The project has been awarded at the amount of AED 1.8 Billion.

Quantity Surveyor Engineer في Al Jaber and Partner
  • قطر - الدوحة
  • أكتوبر 2006 إلى يناير 2008

Project : Pearl GTL Project
Client : Qatar Shell
Consultancy : JGC-KBR,
Pearl GTL Project Contain Roads, Pipe lines, Sewerage System, Street Lighting works, Sewerage pumping stations, Pre fabricated Buildings, Site Preparation, etc. The project amount 200 Million USD.

Site Engineer في Novelties of Engineering Science and Technology
  • الهند - كيرالا
  • يونيو 2001 إلى مايو 2006

• Plan, schedule, assign and supervise the project, direct construction, operations and maintenance activities at project site, Active invoicing procedures.

الخلفية التعليمية

بكالوريوس, Quantity Surveying
  • في IIMT
  • ديسمبر 2023
دبلوم, Civil Engineering
  • في Government Polytechnic - Perinthalmann
  • أبريل 2001

Specialties & Skills

Valuation
Preparation
Physical
Submittals
Quantity Surveying
ENGINEERING
BRIDGES
CONTRACT MANAGEMENT
COST CONTROL
FINANCE
Payment Preparation
Subcontract Management
Final Account Close ofut
Quantity Take off
AUTOCAD
Variation Assessment

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الملايام
اللغة الأم
العربية
مبتدئ
التاميلية
متمرّس