Israr Hafeez, Project Control Manager

Israr Hafeez

Project Control Manager

Huawei

Lieu
Arabie Saoudite - Riyad
Éducation
Master, MS Telecom & Networking
Expérience
13 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 11 Mois

Project Control Manager à Huawei
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis août 2011

Responsible for tracking the project with their different stages in order to maintain the project tracker & reports, that actually helps to predict the forecast which leads to have good eye on project rollout. Some major responsibilities are

 Maintaining the project tracker on daily, weekly & monthly basis.
 Identifying the GAP with description & forecast.
 Having close eye on project stopper.
 Escalating the core issues & maintaining the rollout plan.
 Dealing with different departments in order to get the current status.
 Preparing the reports & presentable slides to update the higher management.
 Query Tracking

Transmission/BSS Engineer à Mobiserve Holding
  • Pakistan - Islamabad
  • mars 2010 à avril 2011

Responsible for monitoring the TXN/BSS network performance of given sites cluster on daily basis in close collaboration with NOC teams on Mobilink Project, with given responsibilities,
 24/7 collaboration with Mobilink NOC teams to ensure maximum network availability.
 Team management in order to ensure the availability of an individual to tackle the TT.
 Planning monthly PM activity of Indoor/outdoor units to prevent major fault that leads to outage.
 Responsible for complete site maintenance Including Electrical/Mechanical & Transmission.
 Rectifying queries with the help of Alcatel BTS terminal and taking care of all kind of alarms (Sector Down, VSWR, FLT Combiner, FLT TRE, Fan Faulty, Intruder, Genset On, Low Voltage, Rect. Major, Temperature, ).
 Rectifier (Modules, Battery Backup Check, LVD Bypass & MCU Setting)
 Transmission - NEC Microware links Health Check (4E1, 16E1 & 48E1) activity to diagnose the faulty channels and loosen connection to avoid links disconnection through Abis. Incase of path loss, path verification activity is performed just in case site is down due to Abis break. Incase of fluctuation & alarms on MW links, responsible of dish alignment
 Feeder Cables connectivity throughout BTS and RE Antennas being checked to avoid VSWR Alarm.
 Gensets (John deer 31KVA, Perkins 20KVA, 27KVA, 30KVA) monthly oil & filters check activity.
 Electricity supply is being checked by ATS Panel (i-e Magnetic Contactor, Delay Timers, UVT Relay etc) in order to avoid major breakdown.
 Electrical (ATS Panel, Distribution Panel)
 Mechanical (Genset Auto Setting Disturbed, Radiator Chock, Oil Finished, Heat up, Air locked, module faulty, control panel)
 Min Acceptable NAR 99%

Éducation

Master, MS Telecom & Networking
  • à Bahria University
  • juin 2009

Contain research relating wireless communication and other fields related to wireless such as wireless sensor networks, WIMAX and UMTS etc.

Specialties & Skills

Project Control
Network Performance
MS Office Complete
Power Bi

Langues

Anglais
Moyen
Urdu
Expert