Project: Abu Dhabi Plaza - Nur Sultan
Taweela is the biggest Aluminum Extrusion Plant in the Middle East. Built on a 200, 000 square meter plot, with an initial investment of 200 million U.S dollars. The plant will be capable of casting 30.000 tons per annum of extrusion billet and approximately 50, 000 tons per annum of aluminum extrusion and extrusion based product based on aluminum billets and liquid aluminum
Duties and Responsibilities:
•Assist the Senior Electrical Engineer in reviewing drawings and material submittals of contractors and provide technical comments.
•Inspect materials delivered at site to ensure that all materials are in accordance with the material submittal and specification.
•Conduct actual site inspection of ongoing works to ensure that work specification and good engineering practices are being followed to the highest standard.
•Coordinate electrical work activities with other work trades (Mechanical, Civil and Architectural) to ensure good and safe flow of work at site. Issue written and verbal site instruction to Contractor for any remedial work needed.
•Monitor progress of work and make weekly and monthly progress report.
Project: CLEVELAND CLINIC, Abu Dhabi
Cleveland clinic project is a 5 star hospital worth 4.83 billion UAE Dirhams. It has an area of 409, 234 sq. mtr and a parking structure for 3, 177 vehicles. It is a multi-specialty hospital located on Sowwah island- the capital’s new designated new central business district. The hospital will be organized into five institute of Digestive Disease, Eye, Heart, & vascular, neurological and respiratory& Critical care to offer an advance range of medical services.
Duties and Responsibilities:
•Conduct actual site inspection of ongoing works to ensure that work specification and good engineering practices are being followed to the highest standard. Inspect materials delivered at site to ensure that all materials are in accordance with the material submittal and specification.
•Coordinate electrical work activities with other work trades (Mechanical, Civil and Architectural) to ensure good and safe flow of work at site. Issue written and verbal site instruction to Contractor for any remedial work needed. Monitor progress of work and make weekly and monthly progress report.
Project: Etihad Towers, Abu Dhabi
A 5- Tower project Tower in Abu Dhabi valued at about 2.5 billion US dollars. Ranging in height from 55 to 77 storeys, in excess of 300 meters high, with a total built up area of 500, 000m². Feature an array of amenities, including an international five-star hotel, a boutique shopping mall, premium office tower, a hypermarket and quality residential apartments. It is one of the most prestigious projects in Abu Dhabi.
Duties and Responsibilities:
•Ensuring all Electrical works is well executed in the construction.
•Daily monitoring the progress and make sure to track all defects in the workmanship and are rectified accordingly.
•Prepare daily site observation report and necessary site work instruction if needed.
•Ensure that the latest field change requests (FCR) were followed on site accordingly.
•Strictly implement safety in construction.
•Conduct actual site inspection of ongoing works to ensure that work specification and good engineering practices are being followed to the highest standard.
•Inspect materials delivered at site to ensure that all materials are in accordance with the material submittal and specification.
•Coordinate electrical work activities with other work trades (Mechanical, Civil and Architectural) to ensure good and safe flow of work at site.
•Issue written and verbal site instruction to Contractor for any remedial work needed.
•Monitor progress of work and make weekly and monthly progress report
Duties and Responsibilities:
•Serve as the
Project: Villagio Mall
Supply and installation of materials for power, lighting, telephone and Fire alarm system, CCTV, BGM for many retail shops as follows:
•Suhas, Boggi Chicco, Gap & Dutti
Supply and installation of electrical works for power, lighting, telephone, CCTV and BGM for said -shops inside villagio mall.
• Masraf Al Rayan Bank
Procurement, installation of the whole electrical system, Fire alarm system, telephone and data system.
the company in all Electrical related works during the construction period.
•Manage all Electrical installation activities in the project assuring completion on time, meeting quality and cost requirements of the contract and adhering to the company’s safety and quality practices.
•Coordinating with Planning, Engineering, Procurement and cost control and ensure proper functioning of the Supplier/Subcontractor performance evaluation system.
•Conduct Meetings with the clients, consultants on contractual matters regarding progress of works and other construction issues, identifying, and analyzing and developing response to commercial risks.
Project: The New Medical City
Engineering supervision for the installation and commissioning of Substation, Bus duct system, main feeder system, high voltage and medium voltage switchgears and lightning protection system.
Project: Insular Life Tower
The work includes supply & installation of lighting, power, fire alarm system,
Project: Heritage Park Project
The work includes a 9 KM underground 34.5 kV line supplying 5-sets of 1.5 MVA pad mount power transformer for the whole street lighting of The Heritage memorial park located inside Fort Bonifacio city, Philippines.
Project: MRT Station
Station #5, Station #6 & Station # 12 - supply and installation for power, lighting and fire alarm system for the Mass Rail transit.
Design and engineering supervision for fluid collection and disposal system of the Palinpinon Geothermal Power plant. The work includes 30 KM outdoor piping using aluminum pipes to supply all steam well lighting and motorized valves.
•Project: Vicente Sotto Memorial Medical Center, Cebu (
Project: Tutuban Center Shopping Mall
Supply and installation of lighting, power and transformer vault design for the whole shopping mall.
Work includes the installation of 34.5 kV incoming transmission line, lighting and power for the Toyota auto parts Assembly plant in Santa Rosa, Laguna, Philippines.
in