Work Experience

Total years of experience :19 years, 7 Months

Deprtment Manager, Water Expert at IK Consulting Engineers / ITSC
  • Serbia
  • My current job since November 2004

Management of various complex projects - Design and Supervision.
Specific experience in Sanitary waste water collection and treatment, Industrial waste water treatment and Water supply projects, as well as in Dams - irrigation and Hydro-power plants - Consulting, engineering and management for: Designs
preparation or approval - including data collection, local permits collection from various institutions, Tender Dossiers preparation (General and particular), than Projects supervision and administration, according to FIDIC - Red and/or Yellow book rules.
Also, specific experience in various countries, including Balkan region - Serbia and Montenegro, where local regulations are specific, bearing the region is accessing EU.
Long-standing career, carried our for specific tasks in the capacity of: Department Manager for Electromechanical works in homeland -Serbia (present position), Lead Mechanical Engineer, Water Expert, or Team Leader - Resident Engineer, for the projects in: Mediteranean region (Cyprus), Asia (Iraq), Middle East, North Africa (Libya) and South America (Peru).
Intensive experience in projects implementation under FIDIC conditions of contract (Red or Yellow Book - 1999 and others).
More than 11 assignments funded by the European Union, thus fully familiar with EC PRAG rules.
As Key Expert, implementing numerous of specific missions in the Balkan region, Serbia and Montenegro, including large scale and complicated projects like: Belgrade water supply, Belgrade sewerage collection and treatment system, Montenegrin regional water supply for Costal areas, Montenegrin costal area sewerage collection and treatment (WWTP Budva), first Industrial Meat processing waste water plant in Serbia (Carnex) and many others mentioned in details in attached CV.
Fluent in English, Serbian (mother tongue) and other local languages (Montenegrin, Bosnian etc), thus very good understanding of the Project needs in Serbia, the entire Balkan region and elsewhere.

Water supply expert, Design at ILF, Innsbruck
  • Jordan - Zarqa
  • February 2011 to August 2011

Water Loss Reduction in Zarqa project (EuropeAid/129765/C?SER/JO) - Design and supervision project for the specific areas suffering water shortage (refugee and densely populated areas), Feasibility studies, Preliminary designs, Tender documents and Detail designs, of total budget 12 million Euro (EUDelegation donation).

Head of EM Department, Water expert at IK Consulting Engineers (afiliated company of ITSC - KOKS)
  • Serbia
  • November 2009 to January 2011

-TAQ -TAQ Dam and Hydropower plant of total 270 MW capacity (3 Francis type turbine units of 90 MW each for 67 m net head and 125 m3/s installed flow at 166.7 rpm), IRAQ (Kurdistan): Complete tender documents according to FIDIC (Red and Yellow Books and specific Client’s requirements);
-KHAZIR GOMEL Dam and Hydropower plant of total approx. 80 MW capacity (3 Francis type turbine units of 26.5 MW each for 100 m net head and 28.75 m3/s installed flow at 375 rpm), IRAQ (Kurdistan): Preliminary design updating and final design preparation before tender documents preparation;
-TRNOVCE Potable water treatment plant (PWTP) of 500 l/s capacity, for the cities Velika Plana and Smederevska Palanka in SERBIA (former Yugoslavia), EU financed: Preliminary design and final design, before tender documents preparation (according to EU, EBRD requirements)
-BUDVA Central Sewage and waste water treatment plant (WWTP) of 1000 l/s capacity (PE 147, 500), for the regions of Budva and Sveti Stefan in MONTENEGRO, EU financed: Preliminary design and final design before tender documents preparation (according to EU, EBRD requirements)

Lead Resident Engineer at MWH s/a
  • Cyprus
  • September 2008 to October 2009

LIMASSOL SEWERAGE AND DRAINAGE SYSTEM - Agreement for Consultancy Services for Design, Preparation of Contract Documents and Drawings, Contract administration and supervision of the Works for Extension of the Sewerage and Drainage System in Limassol - Amathus Area - Phase B2, Cyprus (approx. 160 000 population), EU financed: The role was replacing of Engineer’s Representative (RE) for one year and was related to three first Contracts of the above mentioned Project, covering supervision and administration, based on FIDIC 1999 (1st Edition) Conditions of Contract - Red book (for new Networks). The scope of services included, but were not limited to the following: Contractor’s Detailed Design approval, Workshop drawings approval, Materials supply control, entire Works supervision, complete Contracts administration, As - built Drawings approval, Payment and Claims evaluation, Final tests, Commissioning and Taking over, including O&M team organization and training, necessary Reporting to the Engineer’s Head Office and the Employer. Total Contracts Budget / Construction Value: approx. 240 million Euro - for the new Sewerage and Drainage Networks and PS (5 Contracts for the time being), including new possible WWTP & PS's, now under design consideration.

Resident Engineer at JV Scott Wilson / ITSC (IK)
  • Montenegro
  • March 2008 to September 2008

MONTENEGRIN Regional (Costal Area) Water supply System, Northern Branch, from DJURMANI Balancing Reservoir to the Cities of BUDVA and TIVAT, EU financed - Pipelines with appurtenant Structures, consisting of: approx. 19 km Ductile Iron (DI), DN 900 and DN 800 mm Pipes and Fittings and approx. 4, 5 km GRP, DN 700 mm Pipes and Fittings: The role of Water Supply Expert and Resident Engineer was related to the above Pipelines project, based on FIDIC 1999 Conditions of Contract - Red book (4th Edition), for new Pipelines and Yellow book (for the existing - old Pipelines). The scope of services included, but were not limited to the following: Detailed Design preparation, Contractor’s Workshop drawings approval, Materials supply control, entire Works supervision, all Contracts administration, As - built drawings approval, Payments and Claims evaluation, Final tests, Commissioning and Taking over, including O&M team organization and training, necessary reporting. Total Contracts Budget / Construction Value: approx. 17 million Euro - for the new Pipelines construction & approx. 10 million Euro - for the existing - old Pipelines refurbishment.

Lead Mecahnical design approval & supervsion (commissioning) engineer at BRNA, JV KBR (Kellog - BrownRoot) and GMRA
  • Libya
  • February 2007 to February 2008

GREAT MAN MADE RIVER PROJECT, Phase III (approx 12 m3/s) & Phase IV (approx 3 m3/s), Irrigation and potable water supply from Sahara Desert deep Wells (Historic sources), with necessary Treatment Plants, Reservoirs, Pumping Stations, Pressure drop and Flow Control Chambers, Rising - Force mains or Gravity mains, Surge control Facilities and other Structures - Contractors Detailed design review & Site Works supervision and Commissioning tests and other services for the Mechanical and Process equipment (all according to AWWA, ASME, API, ISO, BS - EN and other internationally recognised standards and regulations), using internal BRNA (affiliated local JV with Kellog & Brown Root). Specifications and Conditions of Contract, generally based on FIDIC Yellow and Red (design/built) documents: Expert - Technical advisor, Member of Senior engineers Group (mostly from the UK) for Basic designs preparation or Contractors General and Detailed designs - construction drawings, specifications, data sheets, calculations, vendors proposals (catalogues, materials supply, workshop test reports, construction, installation and site tests proposals and O&M manuals) review, for entire mechanical and process equipment; Site Works supervision, including Final and Commissioning tests and Start - ups under SCADA System; Operation and maintenance - guidance and local personnel training. Total Contracts Budget for all Phases - already completed Phases I & II and new Phases III & IV: approx. 22 billion USD.

Education

Master's degree, Diploma in Mechanical Engineering, Hydraulics,
  • at University of Belgrade - Yugoslavia (Serbia), Faculty of Mechanical Engineering, Department
  • June 1974

Diploma in Mechanical Engineering, Hydraulics, Chartered Diploma Engineer in Mechanical Engineering (Equiv. to MSc ME)

Bachelor's degree, basic mechanical engineering
  • at University of Belgrade - Yugoslavia (Serbia), Faculty of Mechanical Engineering – General (3 years)
  • June 1972

Specialties & Skills

Capacity
Preparation
Commissioning
Administration
Hydraulics

Languages

Serbian
Expert
Bulgarian
Expert
Russian
Intermediate

Memberships

SMEITS (Serbian Society of the Mechanical and Electrical Engineers), Belgrade
  • member
  • August 1979
Serbian Chamber of Engineers, Belgrade
  • member
  • November 2003

Training and Certifications

Yes (Certificate)
Date Attended:
June 1988
Valid Until:
June 1988