Senior Commissioning Engineer
METITO OVERSEAS LTD. SHARJAH.UAE
Total years of experience :21 years, 3 Months
PRECOMMISSIONING & COMMISSIONING OF
1 OILY WASTE WATER TREATMENT PLANTS
2 BWRO/SWRO PLANTS
3.DEMIN PLANTS
4.SANITARY WASTE WATER TREATMENT - CONVENTIONAL, SBR &MBR.
Commissioning and post commissioning of SWRO, BWRO, DEMIN, CONDENSATE POLISHING PACKAGE, EDI, STP, STP-MBR, STP-SBR
COMMISSIONING, PROCESS ENGINEERING OF R.O AND WASTE WATER TREATMENT PLANTS FROM SMALL TO BIG CAPACITY.
PROCESS DESIGN FOR RO PLANTS, FILTERS, LOADING OF MEMBRANES, OPTIMIZING CHEMICAL DOSING, AND ALL OTHER TROUBLE SHOOTING
SHIFT CHARGE ENGINEER IN THE MARAFIQ RO PLANTS (RO#1, 2, &3)OF 50000 CUM/DAY CAPACITY.
Commissioning and O&M of BW RO plants
1. Commisioning, Operation of 50000 Cum/Day capacity RO PLANTS
(TORAY TFC SU 720 Series & DUPONT -HOLLOW FIBRE TECHNOLOGY) -----MARAFIQ PW FACILITY
2. Trouble shooting for High Conductivity like shimming, Bio fouling, preservation for Long time storage, Chemical dosing Optimization for RO and pretreatment Plants.
3. Overall in charge of operation maintenance of fifteen raw water deep wells sunk to various depths feeding brackish water to RO plants
4.calibration of Field instruments like PH, conductivity, ORP etc.
5.carryout GPM jobs all the Rotary equipments
4.Authorized Permit issuer and Gas tester in the Marafiq Potable water facilities SAP End user as a maintenance Notification creator.
5.Handled PLC-SIMATIC--WINCC, , DCS-- YOKOGOWA CENTUM CS 2000
6.Handled and operated 480 Volts Switch gears
7.SAP end user as a Maintenance notification creator
7.PC skilss- MS office
8.TRAINING UNDERGONE-
* OHSAS 18001:1999 Foundation training Course
* DNV—QMS and EMS Refresher training Course
* Electrical distribution system— Marafiq in house training
9. Valid saudi arabian Driving license
*IOCL Haldia ETP—Process Engineer for Augmentation of Effluent treatment Plant.
*Designing the RO system using ROSA 61, Sizing calculations and commissioning
*PPCL -Delhi—As a shift engineer responsible for the operation of 650M3/Hr lime softening Plant, Sewage reclamation plant, 100M3/Hr Reverse Osmosis plant, 150 M3/Hr Mixed Bed DM plant Through PLC, Chlorination Plant, Effluent Treatment plant.
Operation and Quality control of a 38880 Cum/Day capacity Reverse Osmosis Plant and O&M of a EDR Plant
Laboraory analysis of all Raw and potable water smaples using HACH instruments (Spectro photometer) and reagents