Project Engineer
INTEL SPACE BUILDING CONTRACTING LLC
Total years of experience :26 years, 2 Months
To analyze approved drawings, specifications and contracts to meet the requirement of design
•Managing productivity and quality of output of the site operatives
•Acting as a management representative for site activities
•To carry out other relevant tasks from time to time as per scheduled programs.
•Identifying non-conformance to the standards and preparing corrective action plans
•Resolution of both technical and organizational site operative issues on immediate basis
•Acquisition and submission of materials to consultants to obtain approval
•Deploying logistics and material requirements of site operatives
•Resolution of possible conflicts with other site representatives
•Ensuring accurate and regular progress updates through routine site visits during engineering hours as required to fulfill the job requirements
•To manage Snagging and De snagging and Handing over issues
•Coordination on drawings and site with MEP contractor
Implementation of 4*2 MW NGK Battery Energy Storage (42 MW) in ABU DHAHBI, UAE.
Development and Infrastructure Facilities at Madinat Zayed (Abu Dhabi).
DUBAI METRO PROJECT
•Jadaf-1
•Jadaf-2
•Al Nahada
•Airport free zone
•Rashidiya station
Responsibilities
•Act as a management representative for site works.
•Manage the productivity and quality of the output of the site operatives.
•Carry out other relevant tasks from time to time as per scheduled program.
•Resolve any immediate site operative issues both technical and organizational.
•Coordinate logistics and material requirements of site operatives.
•Resolve possible conflicts with other site representatives.
•Liaise with the project planner, construction manager and other construction affiliates to produce project plans and estimated resource requirements.
•Ensuring the accurate and regular progress updates under take site visits during. Engineering hours as required to full fill job requirements.
•Escalate and report issues to the project manager as soon as such are apparent.
•Carry out other relevant tasks from time to time as requested by the project manager/construction manage
•HSE application at site.
Inspect project sites to monitor progress and conformance to design specifications, safety and health standards.
•Planning with project manager to enforce the progress and meet the dead line.
•Arrangement of equipments and machinery for site.
•Coordination with consultant for specification and quality management.
•Estimate quantities and cost of materials, equipment, and labor productivity to determine project feasibility.
•Managing site team to ensure better performance.
1. Ghotki Sugar Mills Ghotki.
2. Salfi Textile Mills Karachi.
3. Island Textile Mills, Kotri.
4. Latif Textile Mill Nooriabad.
Responsibilities
•Supervision of Structure Work.
•Managing all parts of the structure work
•Following up the scope of work for each subcontractor
•Keeping the work on schedule, also hold and coordinate subcontractors meeting prior to commencement of their work at site.
•Reporting to management for subcontractor’s progress.
•Supervision of Billing, BBS and steel pouring.
Indus Highway Project Shorinalla to Rajan Pur Section.
Responsibilities
•Supervision of Structure Work.
•Managing all parts of the structure work
•Following up the scope of work for each subcontractor
•Keeping the work on schedule, Also hold and coordinate subcontractors meeting prior to
Commencement of their work at site
•Reporting to management for subcontractors progress
•Supervision of Billing, BBS and steel pouring.
Dubai Municipality for G+1.
•Analyzing survey reports, maps, drawings, and other topographical data to plan projects.
•Ensuring maintenance of all quality records as per project specifications
•Ensuring and submission of plans, method statements and test reports to client/consultant in line with contract specifications.
•Ensuring the works as per approved drawings and contract specifications.
•Inspection of project sites to assess progress and conformance to the design specifications, safety and sanitation standards
•Estimation of quantities and cost of materials, equipment, and labor productivity to determine project feasibility
•Testing of soil and to determine the adequacy and strength of foundations & aggregates, concrete and steel
Lay outing of building area using survey instruments.
•Developing Bar Bending Schedules.
•Checking Labors progress.
•Coordination with consultant for specification and quality management.
•Planning with Project Manager to enforce the progress and meet the dead line.
.
4. 412 MW ROUSH Power Plant Abdul Hakim