Total Years of Experience: 49 Years, 6 Months
February 2018
To Present
Principle Electrical Engineer
at Khatib Alami Co.
Location :
Lebanon - Beirut
I am handling all design, QA/QC checking deliverables to client .
S/S's 132/33/11 KV, 3x90 MVA in Northern Iraq, Gulf areas.
High rise bldgs, load flow, SLD, cable MV/LV layout, TR, MV/LV SG, MV/LV SG, UPS, ...
Short ckt calculation, VD, cables choice based on ETAP 20.
Protection relays all types, settings, logipam, T&C
TR 90 MVA SFRA, oil filling+ dehydration system, ....
HV GIS, AIS installation DS, DSE, CVT, CT, ... T&C.
S/S's 132/33/11 KV, 3x90 MVA in Northern Iraq, Gulf areas.
High rise bldgs, load flow, SLD, cable MV/LV layout, TR, MV/LV SG, MV/LV SG, UPS, ...
Short ckt calculation, VD, cables choice based on ETAP 20.
Protection relays all types, settings, logipam, T&C
TR 90 MVA SFRA, oil filling+ dehydration system, ....
HV GIS, AIS installation DS, DSE, CVT, CT, ... T&C.
January 2017
To Present
Principal
at Khatib & Alami,
Location :
United Arab Emirates
- Transmission & Distribution - Power and Renewables
•Conduct, manage and supervise a full power study for infrastructure projects and airport facilities
•Conduct, manage and supervise a full power study for infrastructure projects and airport facilities
January 2017
To Present
Principal
at Khatib & Alami
Location :
United Arab Emirates
Transmission & Distribution-Power and Renewables
January 2016
To June 2017
Design Manager
at El Seif Contracting Co
Location :
Saudi Arabia - Riyadh
(MV, HC, LV)
1-Design for Electrical systems MV, LV for MOI KAP2.
2-Coordination with SEC Central for power supply as per TDL
3- Preparing all material submitals from MV SG, RMU, TR, LV MDB, PF, UPS, Battery chargers, PV, External / Internal lighting, Scada, LC FA, AC, Queing system, clock central system, PA, IPTV, IPTel, ....
4- Assisting Consultant weekly meetings for site drawings, materials approval + solving raised comments.
5- Site attendance on weekly/monthly basis for meeting client plan for site handover
6- Assisting T&C infront of consultant prior Handover.
1-Design for Electrical systems MV, LV for MOI KAP2.
2-Coordination with SEC Central for power supply as per TDL
3- Preparing all material submitals from MV SG, RMU, TR, LV MDB, PF, UPS, Battery chargers, PV, External / Internal lighting, Scada, LC FA, AC, Queing system, clock central system, PA, IPTV, IPTel, ....
4- Assisting Consultant weekly meetings for site drawings, materials approval + solving raised comments.
5- Site attendance on weekly/monthly basis for meeting client plan for site handover
6- Assisting T&C infront of consultant prior Handover.
January 1991
To January 2016
Department Manager
at SAUDI OGER
Location :
United Arab Emirates
for Electrical Service (HC/LC)
•Design, Execution, Quality Control (Tailoring System, Procedures, Methods) and preparing submittals for long lead items in coordination with client & consultant requirements.
•Preparation SLD with configuration For HVGIS, MV Vacuum CB, LV ACB (SG)
•Ring Bus, Double Busbar, 1½ breaker system (HV 132KV, MV 13.8KV, LV) using latest technique for AIS & GIS approved by SEC, consultant, Manufacturer supplier Group Schneider, ABB, Reyrole Siemens, Areva S.G
•Scada, PLC with Ethernet networks for CCMS for all HV, MV, LV (only MDB)
•Load Flow Calculation & Analysis.
•Design, Execution, Quality Control (Tailoring System, Procedures, Methods) and preparing submittals for long lead items in coordination with client & consultant requirements.
•Preparation SLD with configuration For HVGIS, MV Vacuum CB, LV ACB (SG)
•Ring Bus, Double Busbar, 1½ breaker system (HV 132KV, MV 13.8KV, LV) using latest technique for AIS & GIS approved by SEC, consultant, Manufacturer supplier Group Schneider, ABB, Reyrole Siemens, Areva S.G
•Scada, PLC with Ethernet networks for CCMS for all HV, MV, LV (only MDB)
•Load Flow Calculation & Analysis.
January 1987
To January 1991
Senior Electrical Engineer
at TAIF COMPANY, SCOM, BBC & GUSTAVE EPPLE
Location :
Saudi Arabia - Riyadh
& Network Configuration HV, MV, LV and Equipment layout drawings, Load flow studies, Short Circuit Analysis, Relay Settings.
•Installation, Commissioning & Handover of equipment on site: HV Switchgear 130KV, 66KV TR (minimum oil & GIS SF6), Transformers 50MVA+Onload Tap Changer with Scada.
•Installation, Commissioning & Handover of equipment on site: HV Switchgear 130KV, 66KV TR (minimum oil & GIS SF6), Transformers 50MVA+Onload Tap Changer with Scada.
February 1983
To November 1986
Electrical Field Engineer
at Saudi Elevator Co. ( Schindler)
Location :
Saudi Arabia - Jeddah
Training with Schindler KSA on all type of Hoisting machines Elevators Simplex, Duplex, Triplex, Quadruplex with speed ranging from 1m/s to 4m/s using Dynatron Aconic & DC drive ( W. Leonard system ( old system superseded by VVVF new system)
Installation of different types of Elevators, Dumbwaiters, escalators, Travellators. in different cities in KSA Riyadh, Jeddah, Dammam, Mecca.with updated technology for installation of guide rails, control cables, all system of advanced control systems Miconic B, E.
Installation of different types of Elevators, Dumbwaiters, escalators, Travellators. in different cities in KSA Riyadh, Jeddah, Dammam, Mecca.with updated technology for installation of guide rails, control cables, all system of advanced control systems Miconic B, E.