جيمس Jones, PROJECT MANAGEMENT

جيمس Jones

PROJECT MANAGEMENT

BECHTEL

البلد
الولايات المتحدة
التعليم
بكالوريوس, Architectural Engineering
الخبرات
26 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 4 أشهر

PROJECT MANAGEMENT في BECHTEL
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يناير 2018

GULF CAPTIAL CONSTR. GCC

Senior Estimator في FLUOR CORPORATION, FLUOR OIL & GAS
  • كازاخستان
  • يناير 2012 إلى يناير 2014

Assisted Project/Program Management with Preparation of Schedules for
Estimate Preparation, Defining Resource Requirements for Estimate
Deliverables, Review of Client Task Request for Estimate Deliverables, and
Documents and Publication involving impacts to Probable Project/Program Cost.
▪ Assigned a Team of Estimators to Prepare Material Takeoffs (MTO’s) for most
Complex Projects, Drawings, Plans and Specifications. Reviewed Takeoffs
Provided by the Estimate Task Team, the Engineering Department or Other
Sources, and Checks for Mathematical and Technical Accuracy.
▪ Oversaw the Preparation of Top Down Work Breakdown Structures (WBS)
Defined Tasked Estimate Scope, Work Elements, Major Project Components and
Subsystems, and Assign Appropriate Estimating Staff to each Element of the
Estimate by System and Subsystem.
• Utilized the Measured Mile Approach and Analysis to Establish Set Benchmarks
on Total Crew Hours and Total Cost.
▪ Supervised and Prepared the Cost and Estimate Report for the Claims and
Developed Claim Pricing.
▪ Liaised with Project Team to Identify Potential Claims. Prepared and Maintained
a Detailed Register of Contractors Claims and Potential Claims. Reviewed and
Supervised the Preparation of Counter Claims.

NV في ARCADIS
  • الولايات المتحدة
  • يناير 2011 إلى يناير 2012
Senior Cost Estimator في FAITHFUL & GOULD, THE ATKINS GROUP
  • الولايات المتحدة
  • يناير 2005 إلى يناير 2009

Supervised and Negotiated Independent Cost Estimates (ICE’s) for Civil,
Architectural, Structural, Plumbing, Security, Mechanical and Electrical Divisions.
▪ Designed and Maintained a Historical Estimating Database that was Fully
Consistent and Compatible with Other Regional Estimating Databases.
▪ Prepared Reconciliation Cost Estimates with Subcontractors’ and Vendors’
Pricing to Examine the Impact of Change Orders to the Project Budget, Project
Scope and Critical Path.
▪ Administered Merit Determinations to each Contractor Modification to Establish
Whether the Changes in the Initial Scope of Work Were Viable Under the Current
Contract.

Lead Estimator في JACOBS ENGINEERING
  • gu,0,0
  • يناير 2002 إلى يناير 2005

Implemented and Delivered Standard Operating Procedures for All Project
Estimates.
▪ Streamlined and Monitored the Management of the Estimating Group for
Realignment of the Work Process to Ensure an Effective and Quality Work
Product.
▪ Designed and Maintained a Historical Estimating Database that was Fully
Consistent and Compatible with Other Regional Estimating Databases.
▪ Engaged in the Planning of Several Proposals and Business Bevelopment
Ventures.
▪ Established Deliverables, Milestones and Monitored Adherence to the Plan.
▪ Ensured a Coherent Team Approach and Maintained a Consistent Format for
Delivering Estimates .
Los Angeles Unified School District, Construction & Modernization Projects
Los Angeles, CA - $ 235 Million Project

في RALPH M. PARSONS CORPORATION
  • يناير 1995 إلى يناير 1998

Corps of Engineers
Anniston Chemical Demilitarization Disposal Facility - $300 Million Project
Anniston, AL
Program Controls Cost Estimator
▪ Prepared, Reviewed and Inspected Building Design Drawings from Conceptual
to Final Design in the areas of Architectural, Structural and Civil Divisions to
Ascertain the Cost of Materials, Labor and Equipment for Construction.
▪ Attended Monthly Meetings with Manager of Estimating and the Department
Design Supervisors to discuss Addendum and Modifications in the Building’s
Design Packages.
United States Department of Defense, Department of the Army
United States Army Corps of Engineers
Umatllla Chemical Demilitarization Disposal Facility - $300 Million Project
Umatilla, OR
Program Controls Cost Estimator
▪ Prepared, Reviewed and Inspected Building Design Drawings from Conceptual
to Final Design in the areas of Structural, Mechanical and Civil Divisions to
Ascertain the Cost of Materials, Labor and Equipment for Construction.
▪ Attended Monthly Meetings with Manager of Estimating and the Department
Design Supervisors to discuss Addendum and Modifications in the Building’s
Design Packages.
United States Department of Defense, Department of the Army
United States Army Corps of Engineers
Pine Bluff Chemical Demilitarization Disposal Facility - $350 Million Project
Pine Bluff, AK
Program Controls Cost Estimator
▪ Prepared, Reviewed and Inspected Building Design Drawings from Conceptual
to Final Design in the areas of Architectural and Mechanical Divisions to
Ascertain the Cost of Materials, Labor and Equipment for Construction.
▪ Attended Monthly Meetings with Manager of Estimating and the Department
Design Supervisors to discuss Addendum and Modifications in the Building’s
Design Packages.
United States Department of Defense, Department of the Army
United States Army Corps of Engineers
Tooele Chemical Agent Disposal Facility, Utah- $400 Million Project
Tooele, UT
Program Controls Cost Estimator
▪ Prepared, Reviewed and Inspected Building Design Drawings from Conceptual
to Final Design in the areas of Structural and Mechanical Divisions to Ascertain
the Cost of Materials, Labor and Equipment for Construction.
▪ Attended Monthly Meetings with Manager of Estimating and the Department
Design Supervisors to discuss Addendum and Modifications in the Building’s
Design Packages.
United States Department of Energy, National Ignition Facility (N.I.F.) $ 250 Million
Livermore, CA
Program Controls Cost Estimator
▪ Executed and Calculated the Material Take-offs (MTO’s) from Conceptual
Building Design to Construction Baseline Drawings (30%-95% Completion) in the
areas of Architectural, Civil and Mechanical (HVAC, Plumbing and Fire
Protection) Divisions.
▪ Attended Monthly Meetings with the Manager of Estimation and the
Departmental Design Supervisors to Discuss Addendum and Modifications in the
Building’s Design Packages to augment a smooth transition from Conceptual to
Completion.
United States Department of Justice, Federal Medical Center - $170 Million Project

Project Engineer في CONSTRUCTION CONTROL SERVICES CORPORATION
  • الولايات المتحدة
  • يناير 1993 إلى يناير 1995

▪ Coordinated and Managed On-site Construction Engineering Activities for
Extensive Projects.
▪ Supervised the Total Construction effort to ensure the project was in Direct
Accordance with Prescribed Budget and Schedule.
▪ Attended Monthly Meetings with the Client, Contractor, Subcontractors and A/E
Consultants to Coordinated Construction Activities.
▪ Reviewed Change Orders, Request for Information Transmittals, Submittals and
Modification Proposal Request for Compliance and to determine their Validity
under the Current Contract.
The Los Angeles METRO Green-Line Rail Norwalk El-Segundo - $ 400 Million

Architectural Engineer في MAJOR SANDERS ARCHITECTURAL DESIGN FIRM
  • الولايات المتحدة
  • يناير 1991 إلى يناير 1993

Executed Architectural and Structural Drawings for Hospital and Residential
Renovation Projects.
▪ Prepared Preliminary Design Documents and Contract Documents for
Educational Facilities.

الخلفية التعليمية

بكالوريوس, Architectural Engineering
  • في NORTH CAROLINA A & T STATE UNIVERSITY
  • أكتوبر 2021

in

Specialties & Skills

BUDGETING
COMPUTER ASSOCIATES PACKAGES
CUSTOMER RELATIONS
DATABASE ADMINISTRATION
ESTIMATING
FEASIBILITY STUDIES
MECHANICAL
MEETING FACILITATION
PLUMBING
PROPOSAL WRITING