James Ryan Dipad, Scheduling Engineer

James Ryan Dipad

Scheduling Engineer

Samsung C&T

Lieu
Philippines - General Trias
Éducation
Baccalauréat, Mechanical Engineering
Expérience
10 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :10 years, 3 Mois

Scheduling Engineer à Samsung C&T
  • Qatar
  • Je travaille ici depuis mars 2023
Planning Engineer à New horizon Contracting and Maintenance Company
  • Arabie Saoudite - Riyad
  • février 2021 à février 2023

-Working as a Lead Planning Engineer

-Current Projects

1) Riyadh and Qassim Interface Project
- Client- SAUDI ARAMCO

SoW- LSTK Project CIVIL, PIPING, MECHANICAL,
E&I, FIRE PROTECTION

2) GP-2 Balance Line Expansion Project at Haradh Gas Plant
-Client- SAUDI ARAMCO

SoW- LSPB Project CIVIL, PIPING, E&I

Planning Engineer à CSCO PHILIPPINES AND DEVELOPMENT CORPORATION
  • Philippines - Manille
  • septembre 2020 à février 2021
Planning Engineer à NATIONAL CONTRACTING COMPANY Ltd
  • Arabie Saoudite - Yanbu
  • février 2016 à mai 2020

(Feb 2019 to May 2020)

PROJECT: Farabi Normal Paraffin and Derivatives Complex Project, Yanbu

CLIENT/OWNER: L&T Hydrocarbon Saudi Arabia/Farabi Petrochemcials

OWN MANPOWER PEAK as on date: 791 Nos.



(Feb 2016 to Jan 2019)

PROJECT: Conversion of Qassim II & III Simple Cycle To Combined Cycle Power Plant

OWNER/CONSULTANT: SAUDI ELECTRICITY CO. / BLACK & VEATCH

SCOPE OF WORK: Mechanical, Electrical & Instrumentation works

OWN MANPOWER PEAK: 2, 045 Nos.

Duties & Responsibilities:

 Prepare Baseline schedule in Primavera P6 loaded with resources (Material, Direct Manpower, Non Labor) in coordination with Project controls/construction team at site and HO Project Controls team

 Preparation of Project Cash flow based on Budget, Schedule and Scope of work (BOQ)

 Finalize and submit baseline manpower deployment, Quantity flow, Invoice flow and generate S-Curve, Histogram, Bar chart

 Preparation of weekly look ahead schedule base on workfront availability and manpower strength

 Monitor progress at site, update project schedule in Primavera P6, determine manpower productivity/efficiency, and evaluate project performance

 Prepare recovery plan to mitigate the delay in schedule, generate forecast quantity curve, forecast manpower required to achieve the milestone dates and analyze the feasibility considering site cost vs revenue of the project

 Submission of Daily, Weekly and Monthly Progress report for both Client and Management

 Preparation of Cost Control Report (Cum. Income vs Expenses)

 Control scope of the project and consider other work as additional if it is clearly not under the original contractual scope of work

 Prepare Earned Value Analysis of the Project on monthly basis using Schedule Performance Index (SPI) and Cost Performance Index (CPI)

 Control scope of the project and consider other work as additional if it not fall under the original contractual scope

 Prepare and take approval of monthly progress measurements required for certification of Regular Invoices

 Evaluate and certify sub-contractors invoices based on actual progress achieved

Project Engineer à JETTI PETROLEUM INC
  • Philippines
  • mai 2014 à mai 2015

 Review and approve contractors project cost proposal for construction of company gasoline stations

 Prepare cost estimates based on approved drawing issued for construction of Gasoline station

 Prepare baseline schedule and monitor actual progress at site

 Submit Weekly and Monthly Progress Reports with S- Curves/ Histograms showing the Planned vs Actual and communicate to the management its variance

 Conduct site visits to monitor work in progress and to make sure contractors are following company quality and safety standards during project execution

 Secure necessary permits to comply with Local Government codes and requirements

Junior Planning Engineer à ROHM MECHATECH PHILIPPINES INC
  • Philippines
  • février 2013 à février 2014

Following up all maintenance jobs & assigning the manpower on it. Verify that materials are
available before the mobilization of people for the concerned activity & monitoring deadlines
* Prepare preventive maintenance schedule to ensure all the equipments being used in production are in
good condition
* Directly reporting to manager with regards to the actual progress of daily maintenance work
* Following up the spare parts shortage with the purchasing dept., studying its related quotations
(offers analysis) according to our documentation & drawings, provide technical clarifications for
suppliers & manufacturers, inspecting the supplied spare parts.
* Provide internal, accurate, professional documents (Checklists, Counter Measure and Corrective
Action Reports).

Éducation

Baccalauréat, Mechanical Engineering
  • à Technological University of the Philippines
  • mai 2012

A Graduate of Bachelor of Science in Mechanical Engineering at Technological University of the Philippines - Manila in 2012

Specialties & Skills

Planning and scheduling
Project Controls
Invoicing
Primavera P6
Progress Reporting
Invoice Billing
MS Excel
Cost Estimation
Cash Flow
MS Project
Primavera P6
Progress Reporting

Langues

Anglais
Moyen
Filipino
Expert

Loisirs

  • Playing Basketball