Instrument Technician
Kharafi National
مجموع سنوات الخبرة :14 years, 2 أشهر
Maintenance of Fire and Gas detector and system, Calibration and function test of LEL detector and toxic gas detector.UV/IR detector and IR detector and smoke and heat detector .PLC make GE fanuc 9030, 9070 and rockwell automation ics triplex.
Working as an Instrument Supervisor for Laffan refinery expansion project, Main Contractor was Samsung Engineering.
· Working for Planning / Scheduling of Routine Maintenance (PM & Breakdown Maintenance), Proactive Maintenance (Inspection & Condition Monitoring Plans).
· Involved in TQM, 5-S, PSM activities like Quality Circle with Reliance team member.
· Knowledge of SAP 7.10 material handling & Issue, Gate Pass Procedure, Preparation of Annual Budget, Job Permit Issue, Validation, Closure, Task Base Risk Assessment before Job start.
· Working with the Erection and Commissioning of CP Draw line Project. During this working with DCS (Yokogawa CS3000), PLC (Allen Bradley, Siemens), Boiler interlock circuit (Boiler trip relay circuit), Reading Ladder Logic programs, Cause and effect diagrams, P&I diagram
· Working with Transmitter like PT(Rosemount 3051, Yokogawa EJA 530A), LT(Rosemount 3051), TT(Rosemount 644), FT, DPT make of Rosemount, Foxboro, Taylor etc.