Worked with the above company as an Electrical Engineer, main responsibilities :
• Designing the FEED projects overall electrical part according to the client requirements.
• Review the drawings of the sub consultants of MEP and comment for necessary corrections.
• Prepare the tender documents, check the BOQ with the drawing, co-ordinate with other services.
• Submitting authority drawings and coordinating with authority for approvals and Site supervision and clarify the RFIs.
Projects Handled:
• 33KV/11KV substation projects 4 in ruwais area for service stations.
• Up gradation of ZADCO Amenity Centre kitchen and changing the present Transformer capacity 1000KVA two no: to 2000KVA two No: in Zirkku Island(Visited) for the study and provided an optimum solution. Whole system is 6.6KV for the island locally generated system.
• ADNOC 34 Filling Station - Abudhabi, Al Ain & Western Region design and LDN and other initial approvals for the concern Authority.
• Grand Mosque of Khalifa City a company owned project for which the design and supervision done individually.
• Renovation of ZADCO Amenity Centre in Zirkku Island Study for the Substation capacity for substation 12 &11 in Zirkku island.
• Telecom Exchange Building in Al Ain Complete supervision including retendering of the project in a half built stage.
Al Torath International Consultants / Abu Dhabi, UAE
Electrical Design Engineer
Worked with the above company as an Electrical Design Engineer, main responsibilities:
• Designing, review of the designs of other consultant FEED project and comments the drawings.
• Preparing the Tender Documents, Drawings, B.O.Q..
• Monitoring the ISO Standards and Documents.
• Designing the projects overall electrical part according to the understanding of client requirements and authority regulations.
• Monitoring the progress of the project as per the project plan, if it’s against the client’s requirements take corrective action whenever required.
• Coordinating with the Electrical Team, Contractors & multi-disciplinary team (Structural, Civil, Mechanical, Plumbing) & taking care of all formalities, procedures & systems.
Projects Handled:
• A Rumaity Tower in Abu Dhabi with 18 floors and two basement floors with 1500KVA transformer no:.
• Paragon Mall in Reem Island which is half built and cancelled project, which we undertake having the 3 transformers of 2000KVA and some existing panels which we completed with the design meeting all client requirements as needed(2 Engineers only involved in that 1Engineer is me).
• Umm Al Aweena Slaughter House Complex containing 70 Buildings in Qatar, Doha, 7 substation of 22KV/11KV having 1600KVA transformers in each building for duty and standby serving different facilities areas(2 Engineers only involved in that 1Engineer is me).
• ADNOC Telecom Building a building which all the major companies including Takreer, ADNOC, GASCO etc
• ADNOC Filling Stations - Abu Dhabi.
• 800KVA Transformer Al Qubaisi Palace with a mix of facilities like swimming pool, 3 villas and other small related facilities.
• Muscat Slaughter House Complex - Oman, Muscat.
• Slaughter House Building - KSA.
• Handling the EPC projects of E & I package of commercial buildings and apartments.
• Applying & developing of Tailored Technical Solutions, as per Client’s request & instructing the Contractor accordingly.
• Inspecting the Materials those are delivered at Site for quality & specification requirements.
• Preparation of Cost Analysis with different Manufacturer / Supplier’s Quotations, for the Material Submittal.
• Monitoring the ISO standards and Documents.
• Planning & scheduling assignments to achieve pre-set goals within time parameters. Formulating long term/short term strategic plans to enhance operations.
Projects Handled:
• Moolamattom Substation is a major power generation station kerala - Idukki, for which a refurbishment work our team done.
• 3MVA Transformer Multiple Project with own production of Electricity in Indian Oil Corporation - Irumpanam.
• Emmanuel Silks - Ernakulum One of the iconic projects which i have done.
• Lullu Mall- Edapally cochin. One of the best project in cochin.
• Outdoor type 4 pole Structure transformer 500KVA Alliance Packings pvt ltd - Ernakulum.
• Joy Alukkas - Thiruvalla with 500KVA & 350KVA transformer Parallel operation.
• Dr. Naushad ENT Hospital - Ernakulum Kerala State Electricity Board providing Transformer used.
• 1000KVA Transformer Camlot Convention Centre in Alappuzha.
• Handling the EPC projects of E & I package of commercial buildings and apartments.
• Applying & developing of Tailored Technical Solutions, as per Client’s request & instructing the Contractor accordingly.
• Preparation of Cost Analysis with different Manufacturer / Supplier’s Quotations, for the Material Submittal.
• Planning & scheduling assignments to achieve pre-set goals within time parameters. Formulating long term/short term strategic plans to enhance operations.
Project handled:
• 1000KVA Transformers Apollo Tyres - North Kalamaserry.
• 36 Building project constructed in 1950s and renovating for the present requirments Chakollas Spinning Mill - Cochin.
• Tough Glass project of 1000KVA transformer for an own machine for glass blower.
• Milma Cochin.