جيكي mathew, Technical Trainer

جيكي mathew

Technical Trainer

SPSP

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, ELECTRICAL AND ELECTRONICS ENGINEERING
الخبرات
6 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 3 أشهر

Technical Trainer في SPSP
  • المملكة العربية السعودية - الجبيل
  • مارس 2017 إلى ديسمبر 2018

Dear sir,


My background lies in designing, developing, and implementing training programs and instructional materials to facilitate staff and management education and knowledge across a variety of technical topics. With my ability to communicate effectively with all relevant parties to capture training requirements, I excel at delivering powerful learning tools while driving program analyses and modifications to better meet participants’ needs. Additionally, my proven talents in overseeing multiple large-scale projects and driving continuous quality improvement initiatives will allow me to become an immediate asset to your company

Yours sincerely,

Jikky Mathew

QA/QC ENGINEER في SABIC
  • المملكة العربية السعودية - الجبيل
  • يناير 2015 إلى مايو 2016

 Supervision and monitor erection and installation of all electrical activities at site.
 Installation and fabrication of cable trays and supports,
 Installation of LCS(LOCAL CONTROL SYSTEM).
 Junction Boxes, telep0hone booth &RMOCP.
 Installation of lighting fixture.
 Installation of power & welding receptacles.
 Laying of LV & MV power and control cables as per cable schedules.
 Glanding and termination of all power and control cables.
 Grounding& Lighting systems.
 Installation & laying of lightning arrestor.
 Testing of all electrical equipments & cables.
 Material & man power planning with safety & quality as top most priority.
 Participating in project review meetings for tracking project progress.
 Coordination with Civil & Mech Company.
 Ensure on timely delivery of materials without hindering construction activity to achieve overall on timely completion of project.
 Coordination with QA/QC, design & engineering department.
 SABIC IR Team to ensure proper accountability of material for smooth process of handing over project & hindrance in cost recovery.
 Electrical punch list preparation and closing punch list after completion.
 Supervise and carry out effective implementation of work schedule to clear punch list.
 Coordinate with QA/QC to inspect the comments (punch) after completion and close as per their requirements.
 Monitor electrical scope of work and resource requirements for project completion and coordinating with other discipline engineers, coordination with affiliate discipline representative and contractor personnel to make the job easy for execution.

QA/QC ENGINEER في GE ENERGY
  • الهند - بنغالورو
  • أغسطس 2012 إلى أغسطس 2014

• Review of Project specifications, Procedures, Method statements, ITP (Inspection and Test Plan).
• To implement QA/QC procedures and test inspection plan for the project. And ensure that the work is done as per approved drawings.
• Experience in Quality Control works & quality assurance those products and supplies companies with the relevant standards that exit in the execution of the project.
• Co-ordinate to various disciplines Engineers on site and must implement the directions of the client representatives.
• It is the prime duty to hold any activities not complying with the approved standards and specification.
• Conducts activities concerned with the quality control and quality assurance of materials installation and test performing by following duties.
• Pre-commissioning of low voltage and high voltage cables, power transformers, switchgears control gears, lighting, distribution board and motors.
• Responsible for punch list clearing to ensure that the installation of all electrical equipments are completed and accepted by the clients.
• Preparation of electrical QC dossiers for submission to the client.
• Reporting any kind of non-conformities (NCR) to the Quality Control Supervisor.
• Preparing Surveillance report daily.
• Preparing weekly report of inspection activities.
• Ensure that project construction activities are conducted in accordance with quality system.
• Experience in Quality Control Works and quality assurance for the products with the relevant standards.
• Inspection of works carried out by contractor and use surveillance report to document both acceptable and deficient works found at the time of inspection.
• Coordination with client and contractor, attending weekly and monthly QA/QC meetings.
• Also responsible for the co-ordination and implementation of project activities.
• Responsible for assuring compliance with the approved quality control plan for all construction, inspection & testing activities at the site.
• Verify all samples, certificates of laboratory and field test and maintain all filling system for all quality control procedures, record, report etc.
• Preparing daily construction progress reports and two weeks look ahead reports for site engineers and follow up.
• Ensuring that project quality systems is properly implemented.

QA/QC ENGINEER في united electricals
  • الهند - سورات
  • سبتمبر 2011 إلى سبتمبر 2012

 Assist in electrical equipments installation, inspections.
 Ensure compliance with QA/QC procedures, Method Statements and ensure all tests are carried out as per Contract requirements
 Testing of LT & HT cables before and after laying
 Project evaluation, Submission of work report, submission of inspection request to the Client after the completion.
 Ensure the co-ordination in between civil & mechanical activities and cover any interface.
 Completion of project installation works as per project specification.
 Attending regular meeting with clients and consultant and keeping them informed of site progress.
 To supervise and monitor the site labour force through General Foreman and or Supervisors, monitoring the work of any subcontractors to complete the work as per customer's satisfaction.
 Responsible for the inspection of installation of Instruments, Conduits and fittings (above and below ground), Cable trays/ladder racks and Cables, Junction Boxes, Control Panels, Transformers, Switchgears, MCC panels, lightings& fittings, as per the project specification.
 Review of Project specifications, Procedures, Method statements, ITP (Inspection and Test Plan).
 To implement QA/QC procedures and test inspection plan for the project. And ensure that the work is done as per approved drawings.
 Experience in Quality Control works & quality assurance those products and supplies companies with the relevant standards that exit in the execution of the project.
 Co-ordinate to various disciplines Engineers on site and must implement the directions of the client representatives.

الخلفية التعليمية

بكالوريوس, ELECTRICAL AND ELECTRONICS ENGINEERING
  • في AMS ENGINNERING COLLEGE
  • مايو 2011

Year Education Board/University Percentage Scored 2005 X Kerala State Board 59% 2007 XII Kerala State Board 69% 2011 B.E(Electrical and Electronics Engineering) Anna University 70%

Specialties & Skills

MS Office tools
Circuit Analysis
Problem Solving
AutoCAD
Communications
GOOD AT MS OFFICE
GOOD IN COMMUNICATION
GOOD IN AUTOCAD TOOL
ADMINISTRATION SKILLS

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الالمانية
متوسط

الهوايات

  • PLAYING GMAES, WATCHING TV, SURFING INTERNET
    Guidelines And Rules Of Is09001:2008 Training Program Attended.