جيتيش thencherikundu, Electrical Maintenance Engineer

جيتيش thencherikundu

Electrical Maintenance Engineer

Al Ghanim International General Trading & Contracting Co.W.L.L

البلد
الكويت
التعليم
بكالوريوس, EEE
الخبرات
17 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 2 أشهر

Electrical Maintenance Engineer في Al Ghanim International General Trading & Contracting Co.W.L.L
  • الكويت - الأحمدى
  • أشغل هذه الوظيفة منذ يوليو 2021

Key Result Areas:
•Planning and scheduling of the maintenance activities of 11/3.3/0.440KV Substations, associated equipments in the field.
•Maintenance activities of:
•Power Transformers up to 3 MVA.
•Emergency Diesel Generators upto 1000 KVA
•HV/MV/LV Switchgears and Motors
•AC UPS, DC UPS and E-SCADA Systems.
•Checking of various schemes of Control, Relay and Switchgear panels.
•HVAC, Flame Proof DB and Lighting systems.
•VIEC Panel.
•Leading the preparation of substation for the FAT & SAT and test reports; coordinating testing and commissioning activities and providing advice on testing and commissioning procedures & documentation
•Ensuring the safe testing and commissioning of completed installations to achieve the necessary substation performance in accordance with project programme requirements
•Preparing and maintaining commission records of site observations, testing processes and checklists; performing functional and scheme checking of all panels in the substation

Significant Accomplishments:
•Ensured reliable operations by developing methods and upgrading manufacturing processes to eliminate waste, reduce cost and improve overall productivity & quality
•Liaised with various departments to meet internal customer needs

Testing And Commissioning Engineer في Al AHLEIA Switchgear Company
  • الكويت
  • يناير 2018 إلى يوليو 2021

Actively participating in planning and scheduling of the T&C activities of 400/132/33/11KV Substations, defining the pre-requisites and the priorities and complying with project tools, stakeholders’ requirements and project constraints of timing & location
Spearheading the testing of:
o Protective Relays
o Power Transformers up to 300 MVA.
o Shunt Reactors upto 250 MVAR
o Bus barstability, Transformer stability, REF stability, Reactor stability and Solkor stability.
o HV/MV/LV Switchgears and Motors
o Checking of various schemes of LCC, Control, Relay and Switchgear panels.
o Various equipment associated with the substation. (400/132/33/11kv)
o VSD (ABB ACS880)

Electrical Maintenance Engineer في AL-Rashed Group
  • الهند
  • أغسطس 2012 إلى يناير 2018

Maintenance of 11/.433 KV Ring Main Substations under the contract no. MEW/MC/4273-2011/2012 with Ministry of Electricity and Water, Kuwait)

• Led the maintenance of11/.433 KV Ring Main Substations which includes Distribution Transformers upto 1600KVA, circuit breakers (VCB, OCB), 11KV UG cables, Feeder pillers, Current transformers, Battery systems& RMU. Led a team of 20 members to install and upgrade equipment and for preventive maintenance, troubleshooting and repair of equipment; ensured documentation for maintenance related items

Substation Engineer في PS Tech
  • قطر
  • يوليو 2009 إلى يناير 2012

Primary Substations (220KV, 132KV and 66KV) under the contract no. GTC/270/2008 with Qatar General Electricity and Water Corporation (Kahramaa)

Managed the operations of 220, 132 & 66kv substations and Gas Insulated Switchgear (GIS) equipment. Led the analysis of control circuit diagrams and various protections schemes of power transformers, bus bars and feeders. Got authorization to issue permit to work on feeders up to 132 K V. Engaged in crisis management and took action as per the LD Centre

Substation Operator في Kerala State Electricity Board
  • الهند
  • يونيو 2007 إلى يونيو 2009

Well-accustomed in operation and maintenance of EHT equipment such as Power Transformers, Current Transformers, Potential Transformers, Circuit Breakers (Vacuum Circuit Breakers and Minimum Oil Circuit Breakers) and various Control & Protection Devices. Led the preparation of drawing, control circuit wiring, operations of control panel and erection of EHT equipment and performed shutdown works of substation equipment at 66KV substation

Faculty في ACE College
  • الهند - كيرالا
  • سبتمبر 2006 إلى مايو 2007

الخلفية التعليمية

بكالوريوس, EEE
  • في Jyothi Engineering College
  • يناير 2006

. (

Specialties & Skills

Testing
Operation
CABLING
DOCUMENTATION
TROUBLESHOOTING
UPGRADES
CRISIS MANAGEMENT
GRAPHIC DESIGN
MICROSOFT WORKS
OIL PAINTING
SCHEDULING

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس

التدريب و الشهادات

Basic Fire Watcher Safety Training (تدريب)
معهد التدريب:
TUTIS INTERNATIONAL KUWAIT
تاريخ الدورة:
February 2022
Competency SCBA Training Course (تدريب)
معهد التدريب:
GERMANISCHER LLOYD INDUSTRIAL SERVICES GMBH
تاريخ الدورة:
February 2022
Member of Kuwait Society of Engineers (الشهادة)
تاريخ الدورة:
January 2022
صالحة لغاية:
December 2022
MEW approval as Testing Engineer (الشهادة)
تاريخ الدورة:
February 2020
KOC Approval as Electrical Maintenance Engineer (الشهادة)
تاريخ الدورة:
April 2021