Joemer Suba, Civil Inspector

Joemer Suba

Civil Inspector

ENERGOPROJEKT ENTEL

Location
Philippines
Education
Bachelor's degree, Computer Engineering
Experience
14 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 10 Months

Civil Inspector at ENERGOPROJEKT ENTEL
  • Qatar - Doha
  • My current job since February 2014

Conduct Site Inspection to ensure that the work is carried out accordingly and ensuring incorporated materials on construction projects are in compliance with the project plans and specifications.
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Assuring the acceptable quality of materials, processes, and workmanship in the project work.
Inspection of Construction Materials, Witnessing Trial Mixes and Material testing.
Drive contractors at all stage of works to maintain standards of safety and comply with Qatar Health, Safety and Environment Management System requirements.
Assure that KM Standards were followed and maintained in accordance with KM Quality System requirements.
Identification of non-conformity and recommendation of corrective action.
Make sure that any activity offered for his inspection has an approved shop drawing, method statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP).
Carry out all planned site inspections as per the intervention points marked in the relevant ITP.
All site inspection shall be carried out vide an official Inspection and Test request (ITR) submitted by the contractor through the proper Channels.
Inspection status shall be recorded in the ITR and any relevant check sheet as per the approved QCP. Any outstanding items shall be verified prior to closing the ITR. Verify with Independent Testing Laboratory (ITL) that all relevant test results related to specific ITR meets the project requirements.
Closely monitor site activities to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings. Make sure that all materials used comply with the approved Material Approval Request.
Make sure that the Contractor’s personnel are using the latest edition of the approved shop drawings, MS, QCP and ITP as per the project master index.
Closely monitor concrete pours and check continuously concrete materials delivered to site, ensure compliance with QA/QC procedures, and ensure all concrete tests are carried out as per contract requirements.
Frequency checks formwork/shuttering systems and ensure quality, safety and constructability aspects are met.
Make sure that any non-conformity has been reported through a Non Conformance Report (NCR applicable).
Reviewing the Close out Report as submitted by Contractor.
Review the relevant As-Built drawings as submitted by Contractor and make sure that all site conditions are properly addressed.

QA/QC Engineer at Hassanesco
  • Qatar - Doha
  • June 2013 to February 2014

Responsible for the implementation of quality control procedures and plans for providing the more efficient onsite construction work.
Develops and maintains quality standards that apply to onsite construction work, ensuring proper implementation.
Identifies, analyzes and resolves problems and issues with quality assurance and control for site construction.
Plans and coordinates QA/QC activities, making certain of quality control of the work in accordance to contract requirements.
Monitored the construction process and ensured that all the quality requirements are met.
Ability to prepare as-built plans in conjunction with the red marks for the entire substation relevant to civil works.
Updated all Quality Control methods regularly and carried the test plans.
Prepared all the required paperwork and maintained it.
Maintained all the calibrated equipment for inspection.
Assisted in the completion of all the technical records for the quality process.
Assisted the Construction Manager in performing the necessary changes and ensured that actions are taken to maintain the quality of the project.

Assistant Field QA/QC Manager at Kettaneh Construction Qatar
  • Qatar
  • September 2011 to May 2013

Conduct site inspection for progress and readiness of site and coordinate to Contractor/Consultant prior to issue Request for Inspection.
Support Field QA/QC Manager for site inspection to check whether non-compliance of site activity prior to QA/QC report and/or raise Internal Non-Conformance Report.
Assure proper material sample collection for third party material testing.
Conduct site inspection for Site Modification prior to prepare Field Modification Report
Regular audit on all file ensuring that all documents (NCR, RFI, ITP, FMR and MST) are properly submitted and file consist the latest revision register.
Conduct site inspection for Site Modification prior for Red Markings/ As-built revision of drawings.
st the latest revision register.

QA/QC Document Controller at Al Arab Material Testing Laboratories
  • Qatar - Doha
  • October 2006 to October 2007

Responsible for distributing controlled/uncontrolled documents as per approved ISO 9001:2008 based procedure.
Screening all calls, correspondence and apprise of matters affecting the office.
Record all incoming and outgoing transmittals, submittals, and reports.
Representing the office to, and interacting with, senior administrators and staff as well as outside organization and individuals.
Preparation and Submission of QA/QC Documents for Clients and Company’s various projects
Preparation and Analysis of Material Testing Results for Asphalt Mix Designs
Regular Monitoring of Asphalt Plant Production and Stockpile
Monitoring Schedules for Calibration of Material Testing Equipments
Preparation of Customers Monthly Statement of Accounts and Lab Employees Time cards

QA/QC Document Controller at Qatar Asphalt Company
  • Qatar - Doha
  • September 2005 to October 2006

Record all incoming and outgoing transmittals, submittals, and reports.
Issue design drawings to Contractor, Local Authorities and others as directed.
Maintain registers of drawings, issued to/received from, and approved by.
Maintain current drawing sets for engineers and architects and ensure superseded drawings are identified, collected and filed.
Maintain/Updates QA/QC Documents (NCR, RFI, ITP, FMR and MST) and submittal registers.
Record all incoming & outgoing submittals, and monitor company response time, advising company staff when responses are required to comply with contractual limits.
Collect superseded documents and store them in a secure file archive.
Validates any information contained in the document, as well as ensure that the document and any other files submitted with it are approved by the appropriate superiors.
Coordinating amongst the different departments within the company, and ensures that all documents are kept in the appropriate place and filed in the appropriate departmental archive.
Ensuring all document are well checked and submitted on time prior to the documents submission deadlines as per ISO 9001:2008 standard based company procedure.
Interacting with senior staffs for briefing and ensuring schedules and projects are maintained and accomplish on time.
Ensuring departmental policies and procedures are adhering to.
Sorting and Analysis of Managing Director Confidential Files, Company files, bank statements and vouchers
Review and Submit Clients Monthly Statement of Accounts

Education

Bachelor's degree, Computer Engineering
  • at Development for Advanced Technology Achievement College
  • April 2005
Bachelor's degree, Civil Engineering
  • at University of the Assumption
  • March 2001
High school or equivalent, Secondary Curiculum
  • at San Juan High School
  • March 1999

Bayt Tests

Computer Skills Test
Score 82%

Specialties & Skills

Site Supervision
Document Preparation
Administrative Support
Site Supervision
Microsoft Office
AutoCAD
Correspondence Exchange Management System

Languages

English
Intermediate
Arabic
Beginner