JOHN PAUL PRITHIVIRAJ, Assistant Manager- MEP (Project Management)

JOHN PAUL PRITHIVIRAJ

Assistant Manager- MEP (Project Management)

ASENTIS GROUP, indiya

Location
Sri Lanka
Education
Bachelor's degree, Mechanical Engineering
Experience
25 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 1 Months

Assistant Manager- MEP (Project Management) at ASENTIS GROUP, indiya
  • Sri Lanka - Colombo 2
  • My current job since January 2019

Project: M2M Beira Office Project, Construction Projects, Colombo 02, Srilanka

Working as a Assistant Manager-MEP as a part of a Project management team for Constructing Beira office project, Colombo-02, Srilanka

Responsibilities & Duties
Managing the construction project as installing and commissioning of MEP services such as HVAC system consist brine chiller associate with Thermal storage system, DOAS unit and heat Exchangers, Fire detecting and protection system, Sprinkler Hydrant, Passenger Elevator and car lifts, plumbing(water, waste, Soll and irrigation system), ELV and PA system.

• Assist all MEP Engineering support to the project manager to successful execution of Project
• Coordinate with Design consultant, Architect, Main contractor and MEP Contractors to resolve site discrepancy and technical issue
• Prepare accurate and comprehensive progress report
• Attend all progress meeting
• Ensure good M&E drawings management and the control of M&E technical documentation on site
• Ensure worksite safety quality work standard are in practice at all time

Project Manager/Senior MEP Engineer at Shan Builders,
  • Sri Lanka - Batticaloa
  • December 2017 to December 2018

Shan Builders is architectural, structural & MEP consulting and contracting company. Shan Builders is involved in designing and execution of all types of Luxury Villas, Industrial Warehouses, Residential and commercial buildings.
Responsibilities & Duties
• Designing and Estimating of Complete MEP services for villas, homes, shopping complex.
• Designing and Estimating HVAC, Plumbing, firefighting and Drainage System for Buildings.
• Site Inspection and co-ordination of complete MEP Works.
• Material Approval as per Specification and standards.
• Reviewing and approval of Workshop Drawings.
• Applying and getting approvals of NOC required, from various authorities
• Having regular meeting with Client and Contractors for smooth running of the Project.
• Preparing submittals for getting Quotations for all MEP work.
• Calling for tender, nominating contractors for the project.
• Preparing MEP Specification for every individual Project.
• Familiar with all authorities’ rules and regulations

Estimation Engineer at Al BLAGHA Holding (Dammam shipyard)
  • Saudi Arabia - Dammam
  • May 2016 to September 2017

Worked at Dammam shipyard as an Estimation Engineer for ship repair & building and off shore projects In Commercial Department
Responsibilities & Duties
• Prepare competitive quotes of various sizes for entire projects, estimating the cost of materials, labor and equipment and applying prices aimed at securing a strong profit margin.
• Create budgets for quotations and develop proposals in response to request-for-proposals (RFP)
• Ensure smooth operations by creating work schedules for production department complete with timelines, budgets and specification guidelines for construction and installation of polymer systems
• Collaborate with procurement, Marketing, Production, and Contractors in formulating project strategies and delivering customized the systems/solutions to meet clients’ requirements
• Develop, maintain and foster effective relationships with clients, providing update on projects and resolving any issues/concerns promptly to ensure their satisfaction
• Conduct on-site meetings, discussing project progress with crews and troubleshoot and resolve any issues/problems impeding smooth workflow or project deadlines
• Study Tender document, scope, drawings and contracts prior to coting
• Network with procurement dept., subcontractors, and suppliers for inviting quotation
• Develop Project plan, estimate, and submit proposal to CEO for approval

Estimated Projects
• Routine estimation for docking and berthing for repairing ships, barge, tugboat, Rig and off shore platforms
• HASBAH Offshore Gas facilitate increment Project-CRA welding of pipes
• Bahrain LNG platforms Project-pile fabrication and Passive fire protection
• Riyadh Metro Project- Passive Fire protection
• Jotune warehouse- Passive Fire protection
• Jack up Barge Renovation -Basra
• Coast guard Projects - Narjan & hail Vessel fire alarm and Helon system
Waj hovercraft Renovation project
• Dry-dock 1 renovation (22000 GRT)
• Production Building Renovation

Mechanical Engineer-HAMAD INTERNATIONAL AIRPORT – DOHA QATAR at LINC Facilities Management
  • Qatar - Doha
  • May 2015 to December 2015

PROJECTS : HAMAD INTERNATIONAL AIRPORT - DOHA QATAR
Involved in takeover newly build Hammad international Airport and maintain the following facilities

• HVAC Systems
VAV, CAV, Humidifier, Dehumidifier, Terminal units, AHUs, Exhaust fans, Grease Exhaust fans, Stair case pressurization fans, Centrifugal chilled water pumps, DX chillers
• Fire suppression systems
Sprinkler system, Deluge system, Pre Action system, FM 200 and Fire Extinguishers’
• Fire protection systems
Smoke detectors, Fire Alarm System, Fire smoke dampers, Fire rated doors
• BMS System
HVAC, Fire systems, Solar shading, Ventilation system monitoring and operating
• ENVAC System( Automatic waste disposal system)
DN 400, DN 200 Vacuum vast system, Buffer carousel, , Dust Filter, Vacuum Pump. Air Compressor, Cabbage Container, Cartoon Compactor, Filter container
• Solar Shade system
• Conveyance System
Escalators, Elevators, Moving walk ways
• Plumping &Portable Water System
Automatic sensor operated Water closets, Facets, Hand Driers, Water Heaters, Expansion tanks, Hot water circulating Pumps, Soap Dispensers, Drinking Fountain
Responsibilities & Duties
Attending Dash board meeting with HIA
Walk over inspection with HIA
Reporting to, OM, FM, DFM, HIA
Asset Data Collection
Spare part list identification
LOA, Method of statement, Relevant Drawing collecting
Providing site team with a required look ahead schedule and progress update
Approving MR and Coordinate with store keeper
Training and Simulation to Technicians

Senior Mechanical Engineer/Project manager at Ganthy Associates (Pvt) Limited
  • Sri Lanka - Batticaloa
  • August 2009 to September 2014

a) Ganthy Associates (Pvt) Limited Batticaloa (Aug2009- 2014)
Position: Senior Mechanical Engineer/Project manager
PROJECTS HANDLE

• Installation and maintenance of A/C system of hospital projects
• Construction and installation of modern rice milling complex (East Lanka Industrial Estate Pvt Ltd) -100 million
• Installation of boilers with heat recovery Systems (Brandix Lanka (pvt) Ltd)

• Consultancy service for Projects (Arch Nova - Participatory improvement of water supply sanitation and hygiene in resettlement areas -survey and estimate for renovating tank bund

Constructing & Estimating Ferro cement rain water storage tanks.
Schools Renovations and construction projects

• Constructions of Housing complex (Battcala100 houses)
• Schools Renovations and construction projects
• Installing tube wells for Schools and IDP sites (Unicef Projects

Asset Manager at UNOPS Batticaloa
  • Sri Lanka - Batticaloa
  • June 2007 to June 2009

b) UNOPS Batticaloa (since 31ST June2007 up to 30 June 2009)
Position: Asset Manager
• Maintenance of A/C system Vehicles, Generator, office Equipment and Construction equipments
• Building services
• Asset Management
• Computer Maintenance
• Procurement/logistics
Responsibilities & Duties

• Preparing BOQ for purchasing
• Preparing work request
• Scheduling Vehicles, drivers and technicians for sites and maintenance
• Maintenance Of vehicles as UN Standard and safety
• Approving Bills and time sheets
• Authorizing bills and log sheets for site equipments and technicians
• Approving and organizing assets mobilization among the sites
• Keeping records and updating all assets of all sites and office
• Organizing manpower, equipments and machineries as per the site retirements
• Site inspections
• Review / prepare and submit weekly, monthly progress reports H/O

Technical Consultant at UNICEF Batticaloa
  • Sri Lanka - Batticaloa
  • January 2006 to June 2007

d) UNOPS Batticaloa
FOR UNICEF PROJECT (since January 2006-june2007)
Position: Technical Consultant
• Constuction of permanent latrine construction project for tsunami affected people in Batticaloa District
• Construction of Construction of wells, urinals, tube wells, latrines plumbing’s System for Schools in baticaloa district
• Construction of wells, bladders, Water tanks, urinals, tube wells, latrines plumbing’s System for IDP sites (24 camps)

• Monitoring and implementing water sanitation activities for IDP sites in Batticaloa district
• Involved Designing of Portable toilets for Emergency sanitation response
• Involved Designing of septic treatment plant
Responsibilities & Duties

• Preparing BOQ for tendering
• Designing
• Involved Joint assessment with other UN Organization in IDP sites
• Estimation
• Invite, Evaluate & awarding tenders
• Approving Contractor Bills and time sheets
• Monitoring the project activities
• Liasoan with Government partner(Commissioner, Zonal Director), INGOS, NGOS, Contractors
• Organizing manpower, equipments and machineries as per the site retirements
• Site inspections
• Review / prepare and submit weekly, monthly progress reports to Unicef
• Preparing AutoCAD Drawings

Mechanical Engineer at UNIVERSITY OF QATAR
  • Qatar - Doha
  • September 2002 to December 2004

September2002-Dec 2004
• Installation of new women’s college
• Maintenance of (20, 000 TR HVAC Systems, potable irrigation water systems swimming pool and sand filter systems),

• Responsibilities & Duties

• Preparing of Project programming schedules according to the time frame
• Assisting to the director
• inspection and monitoring
• Weekly meeting with contractors project manager and engineers
• Weekly reporting to the director
• Attending breakdowns
• Commissioning newly constructed building
• Monitoring construction & maintenance

Mechanical Engineer at Engineering Services LTD
  • Sri Lanka - Colombo 3
  • September 2000 to September 2002

• Installation of boilers with heat recovery Systems (10, 000 Kg/hr - 02 nos )
• Maintenance and water treatment of all type boilers
• Fabrication and installation oil storage tanks and flue gas chimneys
• Maintenance all type of water treatment system(chillers, cooling towers, boilers, effluent plant and swimming pool
• Install oil storage tanks and pipe lines of 100MW Generator Power station
• Responsibilities & Duties
• Preparing of Project programming schedules, scope of work, time frame at the tendering stage
• Preparing of Project programming schedules according to the time frame Providing site team with a required look ahead schedule and progress update
• Inspecting and Selecting X-ray Quality Welders as per the consultant requirement
• Preparing of Project cost analysis of various projects
• Invite, Evaluate & awarding tenders
• Quantity Surveying and estimating from the Drawing and Catalogs
• Site mobilizing
• Planning and scheduling for required manpower/machineries/materials according to the scope of work
• Monitoring the progress and controls the activities
• Approving Bills and time sheets
• Organizing manpower, materials, equipments and machineries as per the site requirements
• Site inspection with clients, Consultant, Contractors, Engineers and foramens
• Review / prepare and submit client. Consultant, weekly, monthly progress reports.
• Conduct and coordinate progress meeting along with clients, Consultant, Contractors, Engineers and foramens
• Personally inspect and Ensured accurate Engineering and executed all required works in project as per the design specifications and Engineering standards at minimum cost in accordance with QA / QC procedures and company procedures
• Ensuring team manages the Planning / Project Control for all the phases of contract execution including establishing effective format of reporting
• Develop and Manage Project Control Team
.
• Review / prepare, submit, monitor / control submittals log.
And responsible for all other tasks involved with Project Planning / Controlling

Mechanical Engineer at Al Foodie general contracting
  • Saudi Arabia - Riyadh
  • May 1999 to May 2000

• Building maintenance ( HVAC System, Security System, Fire Alarm System, sewage Plumping and Electrical System for 22 no of Bank branches Riyadh & Dammam
• Maintenance of A.T.M s
• Maintenance engineer SAMBA H/O -Riyadh ( involved installation of HVAC energy storage System)

Mechanical Engineer at Frigi Engineering Service (Pvt) Ltd
  • Sri Lanka - Colombo 8
  • November 1996 to May 1999

• Installation of split water cool type Air conditioner, sewage system and Hot water system for 24 storey building(Crescat Development Project)
• Installation and Maintenance HVAC System
• Design Fabrication of ducts


Responsibilities & Duties

• Scheduling technicians & supervisor as per the service calls & Preventive maintenance
• Preparing BOQ for service order
• Estimation
• Inviting quotation
• Purchasing
• Liaisons with maintenance officer, Branch managers
• Q/C Inspection
• Reporting/Documenting as per the ISO 9001

Education

Bachelor's degree, Mechanical Engineering
  • at University of Peradeniya
  • September 1996

• Bachelor of Science in Mechanical Engineering at University of Peradeniya, Sri Lanka (4 years internal degree course) .

Specialties & Skills

Project Management
Planing
Plant Maintenance
Maintenance Management
Planning
BOILERS
HVAC ENGINEER
MAINTENANCE
SANITATION
ESTIMATING
Prodction
Computer
Desining

Languages

Tamil
Expert

Memberships

Associate Member of Institution of Engineers Sri Lanka
  • Member

Hobbies

  • Listening music