Network Operation Center (NOC) & Parking Building (Tier III Project)
STC, Delta Consulting Engineers.
November 19th, 2017 to present (Senior Mechanical Technical engineer),
- Preparation of (time schedule, Shop drawing LOG, Procurement LOG) for mechanical activities.
- Cooling load calculations for NOC & Utilities buildings (Chillers / AHU / FCU / Package unit).
- Exhaust fans calculation for NOC building.
- Pressurization & Smoke Exhaust fans calculation for NOC building.
- Fire fighting calculations for NOC & Car Parking buildings.
- Water Supply & EWH calculations for NOC & Car Parking buildings.
- Firefighting, Water supply, and drainage shop drawings for NOC & car parking buildings.
- Equipment layout and duct design for NOC & utility buildings.
- Co-ordination drawing for underground utility.
- Quantity survey for firefighting and plumbing work.
- 2500 Ton HVAC, Total budget 340, 000, 000 SAR.
• MEP Technical department
August 1st, 2017 to November 18th, 2017 (Senior Mechanical Technical engineer),
- Redesign duct routing for Sector Mosque BLDG 41 - C71 project - Royal commission Jubail.
- HAP Load calculation for Scheme 1 Al Mutrafiah Housing Project - Sabic.
• South Dharan House Ownership Project District 2A (Saudi Aramco).
Turner consultant.
February 16th, 2017 to August 1st, 2017 (Senior HVAC engineer),
- Leading the HVAC group (30 Duct man, Copper pipe fitter) to execute and finish the HVAC work in mock up villas (mini, ducted split, exhaust ducts).
- Quantity survey, procurement orders, red line drawings.
• Administration building & Multipurpose hall, Dammam University (High Rise Building).
IMAR, Urban Consultants, Saudi Consult.
Jun 23th, 2015 to February 15th, 2017 (Senior HVAC engineer),
- Design, and load calculation HVAC (District cooling / Chilled water / VAV).
- Design, and Calculation Exhaust ventilation, Smoke exhaust, Pressurization fan for admin building.
- Follow up, review material submittals for HVAC.
- Review Smoke exhaust, Pressurization fan Calculation for Multipurpose hall.
- Chilled water system Calculation.
- 3500 Ton HVAC, Total budget 350, 000, 000 SAR.
• Extension of Chilled water network, Dammam University (RTR pipes), (Temporary Duty).
Saudi Consult.
- Leading 10 pipe fitter group to execute and finish the network.
- Follow up, material delivery, and shop drawing for RTR Pipes.
- Quantity survey, Purchase orders, & Subcontractors invoices.
- 3.6 KM RTR pipes Total budget 10, 000, 000 SAR
• Prince Mohammed Bin Fahd University housing staff 1 & 2 (PMU), (Temporary Duty).
Dhaliliyah Consultant.
-Ventilation & fresh air calculation for PMU Warehouse
- Calculation for (Chilled water, Smoke exhaust, pressurization fan, Expansion tank) - PMU housing complex staff 1, and housing complex staff 2
• El HELAL Towers Jeddah Gate - EMAAR Middle East (High Rise Building).
Hosam Alabdulkarim Consultant (HAK).
December 23th, 2013 to Jun 22th, 2015 (Senior mechanical engineer),
- Leading the HVAC group (30 Duct man, Copper pipe fitter) to execute HVAC work.
- Calculation, and designs for Fire Protection, and plumbing.
- Design, and load calculation HVAC (mini, ducted split, air & water cooled package units).
- Follow up, review materials for HVAC.
- Shop drawing for HVAC (types & plans).
- Review coordination drawing.
- Follow up site mechanical activities for Tower 001.
- 1600 Ton HVAC, Total budget 250, 000, 000 SAR.
• Maadi Technology Zoon, Maadi Cairo Contact Center Bark, (MB4) Project (LEED certified).
Engineering Consultants Group (ECG).
- Leading mechanical group (12 pipe fitter, 10 plumber) to execute mechanical work.
- Follow up, and review material, and shop drawing for HVAC (VRV), Fire Protection, Plumbing.
- Review coordination drawing.
- Execution of Fire Protection (Water & FM200), plumbing (Boiler, Solar heater, Fuel tank).
- Fire Protection & plumbing as built.
- Quantity survey, Purchase orders, & subcontractors invoices.
- Preparation of time schedule for mechanical activities.
- 1050 Ton HVAC, Total budget 130, 000, 000 LE.
o Freelance work
- Hydraulic calculation for F.P. Toyota Yanbu Center
- Shop drawing for F.P. - Office of General Surveillance (Tabuk).
- Shop drawing for F.P. - Ministry of labor office (Jeddah office).
- Hydraulic calculation for water supply & Irrigation Ministry of labor office
(El Magmaaa, Riyadh).
- Shop drawing & hydraulic calculation for F.P. Ministry of labor office
(El Magmaaa, Riyadh).
- Review AC design load, samples check HAP calculation (Borj El Maabda, Mekkah).
• Extension of Boulak, South Muheit and junction screw pumping stations (Abu Rawash).
El Hattab consults for water and environment
April 12th 2010 to March 31St 2012,
-Follow up installation of screw pumps, gear boxes, motors, cranes, and gates for inlet outlet bay
-Follow up installation of ventilation system (fans, ducts and sand trap louvers).
-Design of power transition system running up the screw pumps for grouting process.
- Quantity survey, subcontractors invoice & Mechanical Quality Control plans.
- Total budget 80, 000, 000 LE.
• Information Technology Institute project, Smart village, B148.
Engineering Consultants Group (ECG).
February 15th 2007 to April 12th 2010,
- Follow up, review material, & shop drawing HVAC (District cooling), Fire Protection, FM200, CO2.
- Review coordination drawing.
- Follow up of HVAC, Fire (automatic sprinkler, FM200, and CO2), & irrigation system.
- Fire Protection, HVAC, and irrigation quantity survey & subcontractors invoice.
- Fire Protection & irrigation as built & operation and maintenance manual.
- Mechanical Quality Control plans.
- Preparation of time schedule for mechanical activities.
- 450 Ton HVAC.
- Total budget 50, 000, 000 LE.
- Installation & start-up equipment Production workshop.
- Installation of water supply, F.F. lines, cooling tower water system, fire fighting pumps, and setting up steel truss for cooling tower.
Graduation project: Design and set up of Paper Recycling Machine. Grade: Excellent