Electrical project –maintenance &design panel control engineer at hcww&gila
الشركة القابضة لمياة الشرب والصرف الصحى/جيلا( ال توكل الكهربائية)
Total years of experience :15 years, 8 Months
highlights
About “ IWSP”: it is capital investment program between European Development Partners’
“EDPS” &HCWW to implementation new project in water wastewater field, so this
Program called” improved water &wastewater program”.
About “GILA”: Is considered one of the largest commercial companies in Egypt.
Gila was founded in 1892 as one of the main establisher of the industry.
Gila is considered as the main pillar for distributing the products of the major international electrical
agencies in Egypt as well as a reliable partner for other distinguished companies
Schneider Electric's Certified Prisma Partner Gila who assembles &tests the Prisma switchboards
According to the standards of the IEC.
Technical support engineer “project Engineer”
1-prepare pre-selection of project with Master plan in HCWW
2-prepare simplified Feasibility study for selected project
3-selection of Engineering consultants
a-prepare prequalification documents & tender documents
b- support at Technical Bid Evaluation
4-preparation of Design Documents &Tender dossiers
5- Preparation tendering of work/supplies & observe implementation
Maintenance engineer
1- Familiar with all the electrical drawing catalogue as well as the corresponding equipment, materials, consumables, tools and manpower allocations
2- Familiar with all L.V&M.V panel construction& maintenance as well as metering devise
3-Familiar with all electrical& mechanical equipment maintenance for centrifugal pump, submersed pumps “flyget, wilo pump, wailler, Al-fared…."
4-Familier with all diesel generator construction& maintenance like Berkins, iveco, dawoo …..With ac generator "Stanford"
A- Design panel boards
1- prepare &study Technical offer for switch boards “ecodial program”
2- prepare S.LD & PANEL VEIW &CONTROL CIRCUIT
3- prepare shop drawing “ FOR APPROVAL& AS BUILT”
4- prepare material list for building
B- Achievement panel board building
1- Prepare material list for components’
2-prepare mechanical calculation &drawing for cupper bus bar &switchboard
3- Implementation all steps of panel board building
4- Test the final panel boards with quality dep.
2003 2008 Bachelor of Engineering, Faculty of Engineering, Electrical Power and Machine Department, Tanta University in Cairo. General Grade: Good (71%) Graduation Project: Dynamic Analysis and speed control of 3phase induction motor Subject of project: Automation system by using " inverter" Grade of Project: Excellent.