Total des années d'expérience: 20 Années, 3 Mois
février 2012
A juin 2014
Project Field Engineer (C&I)
à Rockwell Automation - vMonitor
Lieu :
Koweït - Al Koweït
Control & Instrumentation Project Engineering for Upstream Oil & Gas Projects, Site survey, Pilot projects & testing, Gantt Chart Plan, CAD Design for RTU Panel, General Arrangement, Layout, Wiring diagram, Bill of materials details, Field Instrumentation mounting and hook-up, System Architecture, FAT & SAT Management & Documentations.
SCADA Integration vMonitor TotalAccess, Design 3D Graphics HMI screens, Configurations, Functional Simulation, testing & Troubleshooting. RTU Sixnet & vMonitor IXC-2 & IRTU-800 configurations, Firmware & patches upgrades, Isagraf loading for logic control, Third party communication and Laboratory testing.
Field Instrumentation Wired & Wireless Transmitters Honeywell Multi gas & H2S detectors, Foxboro Diesel tank level gauge, vMonitor IsenseGP IsenseLCD configurations, testing, calibration, Installations and Troubleshooting.
Instrumentation Preventive and Corrective Maintenance Project of Natural flow & Artificial Lift Oil Wells for GE Woodgroup, Baker Hughes, Schlumberger and Al Khorayef regarding Oil well remote monitoring and controlling system. These included running Wells, Pre-Work over and Post Rig over.
SCADA Integration vMonitor TotalAccess, Design 3D Graphics HMI screens, Configurations, Functional Simulation, testing & Troubleshooting. RTU Sixnet & vMonitor IXC-2 & IRTU-800 configurations, Firmware & patches upgrades, Isagraf loading for logic control, Third party communication and Laboratory testing.
Field Instrumentation Wired & Wireless Transmitters Honeywell Multi gas & H2S detectors, Foxboro Diesel tank level gauge, vMonitor IsenseGP IsenseLCD configurations, testing, calibration, Installations and Troubleshooting.
Instrumentation Preventive and Corrective Maintenance Project of Natural flow & Artificial Lift Oil Wells for GE Woodgroup, Baker Hughes, Schlumberger and Al Khorayef regarding Oil well remote monitoring and controlling system. These included running Wells, Pre-Work over and Post Rig over.
octobre 2007
A janvier 2012
Controls and Instrumentation Engineer
à Kuwait Cement Company (KCC)
Lieu :
Koweït - Al Ahmadi
DCS Administration FLSmidth ECS / SDR, Allen Bradley RSLogix Frameworks 2.1 for PLC5/80, RSLogix500 for SLC500 & Flex I/O platforms, Panelview 300/600, for Rotary Kiln Plant, Star-up Burner, Oil Calciner Burner, Oil Kiln Burner (HFO) Heavy Fuel Oil Firing, Calciner Analyzer, Kiln Inlet Analyzer, Pre-Heater Analyzer, Material Transport, Ship-Unloader, Stacker, Reclaimer, Raw Mills, Pre-Heaters, Petroleum coke System, Atomizing Coal Mill, Cooler Grate, Baghouse, Cooling Water System, CF Silo and QCX Manual Mill.
SCADA & PLC Administration GE Fanuc Proficy IFix 3.5, ABB Advant OCS Controller, Allen Bradley RSLogix500 for Micrologix & SLC500, FlexIO, RSLogix5000 for Contrologix and FlexLogix Plarforms for Cement Mills, Pre-Grinding Mills, Pre-Grinding Hydraulic System, Weigh Feeders, Chlorine By-Pass System, Masonry Mills and Bag Filter Systems.
SCADA & PLC Administration GE Fanuc Proficy IFix 3.5, ABB Advant OCS Controller, Allen Bradley RSLogix500 for Micrologix & SLC500, FlexIO, RSLogix5000 for Contrologix and FlexLogix Plarforms for Cement Mills, Pre-Grinding Mills, Pre-Grinding Hydraulic System, Weigh Feeders, Chlorine By-Pass System, Masonry Mills and Bag Filter Systems.
novembre 1999
A octobre 2007
DCS / SCADA Administrator Control & Instrumentation Specialist
à 2X647 MW Steam Turbine Power Plant TEAM Energy
Lieu :
Philippines
1. DCS, SCADA HMI and PLC Administration, PLC logic programming and troubleshooting, SCADA and HMI graphics designs, modifications and implementation, Alarm management, Hardware management, LAN, Server and workstation Operating system and application software security.
2. Corrective and Preventive Maintenance of running equipment of field instrumentation, including Process major trouble shooting, completion of Task routine maintenance instructions and Job orders from the operations department.
3. Project Construction, Field and Site Acceptance test, Commissioning, Start-up and Proper Documentations
4. Rehabilitation, repair and calibration of field instruments and workshop equipment.
5. Conduct Technical Trainings to Technicians, junior technicians and On the job training Cadet Engineers.
2. Corrective and Preventive Maintenance of running equipment of field instrumentation, including Process major trouble shooting, completion of Task routine maintenance instructions and Job orders from the operations department.
3. Project Construction, Field and Site Acceptance test, Commissioning, Start-up and Proper Documentations
4. Rehabilitation, repair and calibration of field instruments and workshop equipment.
5. Conduct Technical Trainings to Technicians, junior technicians and On the job training Cadet Engineers.
octobre 1997
A novembre 1999
Electrical & Instrumentation Technician
à EEI Corporation
Lieu :
Philippines
1. Project Constructions, Commissioning and start-up.
2. Installation of field Instruments, sensing line tubing, Cable laying, Panel and instrument wire termination.
3. Rehabilitation, repair and calibration of field instruments. level transmitters pressure transmitters, temperature transmitters, flow meters, Solenoid Valves, calibrated control valves, pneumatic actuators and cylinders, pneumatic level controllers, positioners and pressure boosters.
4. Control loop checking, sensing line leak testing.
5. Field process troubleshooting, assisted operations and Maintenance department for warranty period.
2. Installation of field Instruments, sensing line tubing, Cable laying, Panel and instrument wire termination.
3. Rehabilitation, repair and calibration of field instruments. level transmitters pressure transmitters, temperature transmitters, flow meters, Solenoid Valves, calibrated control valves, pneumatic actuators and cylinders, pneumatic level controllers, positioners and pressure boosters.
4. Control loop checking, sensing line leak testing.
5. Field process troubleshooting, assisted operations and Maintenance department for warranty period.
mai 1994
A octobre 1997
Electronics Engineering Technician
à Active Electronics MAnufacturing Corporation
Lieu :
Philippines
1. Assisted Engineers for modification of electronics designs for Audio appliances products Midi and Mini Components, Home Theater, Radio Cassette Recorder, Power Amplifiers, Pre-Amplifiers and Karaoke units
2. Repairs and Troubleshooting of production’s QC and QA rejected units, problem from electrical power Supply, Rectifiers, Printed Circuit Board cards, wiring and semiconductor components.
3. Calibration Check and maintenance of electronics equipment used for set-up, testing and Measurement like oscilloscope, Audio generators, DC Power Supplies, Electrical Test jigs and Computer Test for circuit fault analysis
4. After sales warranty repairs and servicing.
2. Repairs and Troubleshooting of production’s QC and QA rejected units, problem from electrical power Supply, Rectifiers, Printed Circuit Board cards, wiring and semiconductor components.
3. Calibration Check and maintenance of electronics equipment used for set-up, testing and Measurement like oscilloscope, Audio generators, DC Power Supplies, Electrical Test jigs and Computer Test for circuit fault analysis
4. After sales warranty repairs and servicing.
Partager sur Facebook
Partager sur Twitter
Partager via Email