Sr. Site Engineer
Al Jaber Engineering and Construction
مجموع سنوات الخبرة :19 years, 9 أشهر
• Managing and supervising the completion of MIA Underpass and Utility Building waterproofing and finishing works (GRC Cladding, Granite Stone Flooring, Internal and External Painting, Roof Louver, SS Grating, Aluminum screen mashrabiya cladding, SS handrails and cycle track on stairs)
• Successfully delivered the project within a tight timeline imposed by the urgency and time constraints driven by Qatar’s hosting of the FIFA World Cup.
• Effectively managed and supervised site operations with a primary focus on executing tasks such as site clearing, enabling, excavation for wet and dry utilities, pipe laying, crossing duct installation, road work preparation to finishing and hardscaping works.
• Collaborate closely with the on-site team, subcontractors, and consultant to ensure project compliance, safety, and overall quality.
• Provided proposals and recommendations to the Technical team in the event of conflicts between the approved design and the actual site conditions.
• Effectively managing and resolving site issues through a comprehensive approach that involves identifying, addressing, and overseeing the resolution of challenges that may arise during construction, thereby ensuring the project's seamless progress and successful completion.
• Transitioned from Technical Engineer to Senior Site Engineer role at the Manateq Oasis Project, reporting directly to the Project Manager and collaborating with the operations team and subcontractors.
• Played a key role in the review and preparation of Technical Document Submittals, ensuring alignment with QCS and Project Specifications for civil and architectural works.
• Conducted thorough reviews of shop drawings and collaborated with the Engineering Department to address site requirements and technical issues.
• Oversees the operations related to civil works and building external and internal finishing works, including glass curtain wall installation, marble finishing, modular office partitioning, glass partitions, wooden cladding, doors and hardware installation, as well as sanitary fixtures and accessories for the project.
• Prepare and deliver a weekly progress monitoring report for presentation at the Site Management meeting, ensuring it reflects the latest project developments and status updates.
• Thoroughly investigated, analyzed, and effectively resolved persistent water leakage issues in the building, which had been left unresolved by the previous contractor. The successful resolution was achieved within the allocated budget and timeline.
• Directly collaborated with the client's Project Manager (Kahramaa) and the building end user (KAP), ensuring effective communication and alignment of project objectives.
• Took charge of technical oversight and execution of operational tasks, thereby managing the project's overall operations.
• Executed the duties of a QC Engineer by preparing all QC-related documents and submittals and carrying out inspections in coordination with the client's representative.
• Successfully fulfilled dual responsibilities as Project Engineer and Site Architect for the Renovation of HMC Bone and Joint Center. The successful completion of the project earned the client’s trust that led to additional renovation work of HMC Pediatric Dental facility.
• Managed the Engineering Department in the preparation of engineering documentation, technical submittals and drawings, ensuring compliance with project requirements.
• Managed the execution of civil and architectural construction tasks, while also coordinating MEP (Mechanical, Electrical, and Plumbing) aspects of the project.
• Spearheaded the project handover process, including the preparation and submission of all necessary handover documentation, such as As-Built Drawings and Operation and Maintenance Manuals.
• Performed Quality Control inspections for civil and architectural works, including tasks like masonry, waterproofing, drywall installation, painting, carpentry, and the installation of façade cladding (Aluminum composite panel, glass curtain wall, precast GFRC, and natural stones), as well as internal floor and wall finishes.
• Participated in field quality tests for various elements, such as internal and external coatings, anchor bolts, waterproofing and glass curtain wall.
• Issued both internal and external Non-Conformance Reports when deviations from standards or specifications are identified.
• Prepared and submitted Method Statements for approval, which will guide the Construction Team in their implementation.
• Collaborated with the Construction team to develop action plans for resolving Non-Conformance Reports issued by the Consultant/Client, aligning with the Project Handing Over process.
• Conducted internal snagging activities and addressing the items on the snagging list provided by Consultant and Client Representatives, ensuring compliance with the Project Handing Over procedure. Managed the close-out of valid end user complaints during the Defects and Liabilities Period.
• Conducted Quality Trainings for site teams to enhance their awareness of quality procedures detailed in approved Method Statements, aiming to prevent defective works and recurrences.
• Performed Quality Control inspections for civil and architectural works, including tasks like excavation, masonry, waterproofing, drywall installation, painting, carpentry, and the installation of façade cladding (Aluminum composite panel, glass curtain wall, precast GFRC, and natural stones), as well as floor and wall finishes (wood, ceramic, natural stones, paint). These inspections ensure that site activities align with approved drawings, method statements, and specifications.
• Participated in field quality tests for various elements, such as external and internal coatings, anchor bolts, and façade curtain wall components.
• Issued both internal and external Non-Conformance Reports when deviations from standards or specifications are identified.
• Prepared and submitted Method Statements for approval, which will guide the Construction Team in their implementation.
• Collaborated with the Construction team to develop action plans for resolving Non-Conformance Reports issued by the Consultant/Client, aligning with the Project Handing Over process.
• Conducted internal snagging activities and addressing the items on the snagging list provided by Consultant and Client Representatives, ensuring compliance with the Project Handing Over procedure.
• Managed the close-out of valid end user complaints during the Defects and Liabilities Period.
• Conducted Quality Trainings for site teams to enhance their awareness of quality procedures detailed in approved Method Statements, aiming to prevent defective works and recurrences.
• Reviewed procedures and method statements to ensure compliance with the client's design specifications and contract terms.
• Prepared comprehensive inspection and test plans, actively driving corrective actions to address non-compliance.
• Directly oversaw the execution of test plans according to method statements, thoroughly assessing the quality of work to maintain standards.
• Led the site team in effectively resolving all outstanding issues during the project handover.
• Bachelor of Science in Architecture (2003), Technological University of the Philippines, Manila
• Graduate in Architecture Technology / Drafting Technology (1995), Technological University of the Philippines, Cavite