• Accomplish with site inspections with consultant/clients for all the construction activities for various buildings.
• Outperform with preparation and submissions of Request for Inspection (RFI), Material Approval Request (MAR) & Material Receiving Inspection Request (MRIR) and maintaining the records of all the submitted documents. Accomplish to review the site inspection and Test Plan (ITP) for all the civil and structural works including GRP pipe installation works.
• Accomplish to work and inspect all the construction activities for various buildings and structures like Balancing Tank, Outfall Area, Pretreatment Building, Biological Reactor, Distribution Chambers, Sludge Digestor Tanks, DAF, Gravity Thickeners, Solar Drying Facilities, Primary Clarifiers, Electrical Building, Electrical Substation, Administration Building etc.
Key Projects Handled
• Tabuk 2 Independent Sewage Treatment Plant (ISTP).
• Accomplished to work, execute and inspect with Saudi Aramco for all the construction activities (Substructure and Superstructure) for various buildings like multi-function building C306-4 & C306-1, Propane vaporizing system C406-2 and ship building C203.
• Outperformed with issuing Internal Non-Conformance Report (INCR) with reference to Project specifications and other applicable standard and approved IFC drawings.
• Developed to prepare the packages such as ECC & SCC and handover documents of all the Civil Structures. To witness the concrete testing on site & in laboratory.
• Responsible for monitoring conformance to quality, performance, specifications, and/or code requirements by performing inspection duties.
Key Projects Handled
• King Salman International Complex for Maritime Industries and Services.
• Outperformed to participate in punch lists, testing, and commissioning. Worked and inspected with clients for all the construction activities for various buildings like an Admin Building, Workshop Building, RO Building, limestone Filters Building, product water tank, Electrical Building in complete independent water project handed over to client (SWCC).
Key Projects Handled
• Al Jubail SWRO Phase 2 Desalination Project.
• Outperformed to review contractor documents such as project quality plan, method statements, etc. Accomplished to work and inspect with clients for all the construction activities for various buildings like a Workshop Building, RO Building, Fire Fighting building, Post treatment plant, WW system, DMPF foundations, sludge Dewatering system in complete independent water project handed over to client (Rabigh 3 company).
Key Projects Handled
• RABIGH III Independent Water Project (IWP).
• Outperformed to assess construction and installation methods of construction and ensure that QA/QC procedures are adequately implemented. Attend quality and construction meetings to discuss the project progress and issues for the on-going activities on the site.
• Worked and inspected with consultants for all the construction activities for various buildings like Fuel Oil Switchgear Building, Fly Ash Air Compressor Building, LSB Buildings, Admin Building, HFO Tanks, LFO Tanks and structures like Rainwater gutter trench, Lighting pole foundations, Concrete pavement, duct banks, Electrical pits in complete power and desalination plant was handed over to client (Saline Water Conversion Corporation).
Key Projects Handled
• SWCC YANBU POWER & DESALINATION PLANT PHASE-3
• Worked and executed all the construction activities for various buildings like 380kv, 132kv, 33kv, control room & fire pump house along with gantry foundations, grid transformers, super grid transformers, station service transformers, associated underground utilities such as manholes, hand holes, related duct banks with trenchs & final grading with asphalt in complete sub-station was handed over to client (Saudi Electricity Company).
• Supervised and giving a helping hand to the construction team for the ongoing activities.