material controller at TECNICAS REUNIDAS SINOPEC HANWAH JOINT VENTURE
  • Kuwait - Al Zour Mina Saud
  • February 2017 to September 2019

1 Duty start before toolbox meeting conducted our team and explain how to
safety working during material receiving time and how to safely material
unloading and storing the material as per standard and also safety rules
implemented to all
2 Material receiving time carefully checked as per document and
immediately report making and send to office, After qc come check the
material that time coordinate with them, once qc approved after material
issue the requirement of construction team
3 Follow the safety aspect during material receiving time and issue time
4 material storing as per standard rules follow up and safely
5 House keeping maintenance always in around the working area and
follow up environment rules
6 Material shipment date follow up and precaution action take for material
receiving and inform to our superior if any requirement need
7 Equipment (crane, forklift) safety followup and permit making for lifiting
equipment
PROJECT

MATERIAL WITH QUALAITY CONTROLLER at SK ENGINEERING &CONSTRUCTION
  • Saudi Arabia - Jubail
  • July 2012 to October 2016

◄ INVENTRY MAKING AND UP DATE THE MATERIAL list (IN &OUT) separate (Project material
Bulk item, local purchase construction material, consumable material, temporary material
And safety material (shoes, cover all and safety vest)
◄ Tools list inventory making and also tools register maintained
◄ Testing equipment’s calibration monitored and prepares sending the equipment for calibration
◄ Prepare the material requisition with Aramco standard as per the site requirements
◄ Coordinate our QC for material receiving inspection time and also arranging documents for
Material Inspection
◄ prepare &email sending to CPO for any balance material and follow up the balance material
◄ Material arranging from our (SK) Ware house to site

ELECTRICAL SUPERVISOR at OTV BESIX SANOTECH JV
  • United Arab Emirates - Abu Dhabi
  • July 2010 to May 2011

• Monitor Contractor’s Site activities to ensure compliance to Contractual requirements. Report & resolve non-conformances;
• Monitor Project progress in line with agreed time schedule, reporting delays.
• Preparing periodic Progress Reports;
• Monitor the receipt of material/equipment at site and ensure that only approved material/equipment are accepted for use at site. Verify Contractor’s documentation for the material/equipment received. Report & monitor abnormalities/damages, if any;
• Ensure compliance to HSEQ requirements at site including necessary documentation;
• Verification/review of Contractor’s invoices in line with progress of site works;
• Supervise site inspections & testing. Follow up with Contractor for completion of pending items and snags

TYPE OF EQUIPMENTS INSTALLATION
33KV SIEMENS PANEL SWITCHGEAR for receive 33kv incoming supply
33KV/11KV TRANSFORMER
11KV&6.6kv (SCHNIDER make) switch gear panels
11kv RMU’s (Ring main unit) control units
33kv, 11kv UG XLPE CABLE LAYING
Medium voltage &low voltage transformers (11kv/6.6kv, 11kv/415v)
LVGB PANELS INCLUDING ACB (Air circuit breakers up to 2500Amps)
MCC panel (UP TO 630 A MCCB Incomer controls)
VFD PANELS (up to 560 kW control capacity)
Soft starter panels (up to 250 kW control capacity)
Lighting Wiring and DBs (SMDB, FDB, PB)
UPS control PANEL with battery (UP TO 6VA)
BATTERY CHARGER control PANELS
PLC &RIO PANELS
JUNCTION BOX CONTROL PANELS (INCLUDING POWER, CONTROL&INSTRUMENTION)
CABLE TRAYS&LADDERS (HDG, EPOXY COATED HDG, GRP)
LV UG CABLES XLPE (POWER, CONTOL CABLES&Y/G CABLES)
INSTRUMENT CABLES (PROFIT BUS, MODBUS, FIBEROPTIC)
EARTHING RODS, Earth pits (FURSE Make) &Earth bus bar

SITE ELECTRICAL; ENGINEER at VA TECH WABAG INDIA LTD
  • India - Chennai
  • October 2007 to July 2009

110 MLD, STP (SEWAGE TREATMENT PLANT) AT DOHA SOUTH (QATAR)
DUTIES &RESPONSIBILITIES
 Preparation and implementation of Electrical preventive maintenance schedule and procedure follow up as per technical design specification.
 Coordination and execution of O&M (Doha south STW O&M Contracts) as per the contract considering all Electrical equipments.
 Maximum Plant availability by implementation of Electrical philosophy with quality output as per the contract.
 O&M Cost control by optimization of manpower and spares requirement.
 Site MIS report to submit to HO regularly on time including quality parameters, field electrical equipment status, and consumption of spares report and other utility requirement as per the contract requirement.
 Relationship development with client including customer satisfactIon
 Maintain the relationship internal department and cooperate the process department
 Maintain and follow up the safety procedure in our electrical PM(preventive maintenance)
EQUIPMENT HANDLING at 110 MLD plant DOHA South, QATAR
● MV Panel board maintenance with LT ACB’s Up to
2500 Amps Draw out type)
DG maintenance of up to1600KVA, 415V capacity
AMF PANEL with switchgear of 2500A ACB, 415V
● Maintenance of MCC panel with Up to MCCB 800A TP
Motor maintenance of Up to 3 phase induction motor
1100 KW, 690V with VFD (type ACS 627-1710-6, 690V)
Control of Starter maintenance
● Maintenance of APFC Up to400 KVAR panel with
VarlogicNR12 (Automatic power regulator)
● Maintenance of UPS, Battery and DC Battery charger
● Maintenance of Electric hoist up to7.5 ton capacity
● Operation of PLC SCADA Equipment to control Whole
Plant and monitoring the total plant operation.
● Trouble shooting in all VFD AND SOFT STARER, DOL, STAR
DELTA control circuit

ELECTRICAL ENGINEER at KADRIWOVENS(A UNIT KADRIMILLS CBE LTD
  • India
  • December 2004 to September 2007

Erection, Commissioning, testing And Maintenance of transformers, MCC panel MDB panel , HT &MV Panel boards, generators, lighting, underground Cables, Earthing system, Motors connection

ELECTRICAL ENGINEER at PREMIER TEX PRODUCTS PVT LTD
  • India
  • July 1997 to November 2004

Maintenance of transformers, circuit breakers, HT &MV Panel boards, generators, lighting, UG Cables, Earthing, Motors etc.) AND TROBLE SHOOTING OF PROCESS RELATED ELECTRICAL AND ELECTONICS FAULT

ELECTRICAL SUPERVISOR at NINANS LTD
  • India
  • June 1994 to June 1997

Maintenance of HV&LV equipments including SLIP RING MOTORS& AND STARTERS)AND TROUBLE SHOOTING OS PROCESS RELATED ELECTRICAL FAULT

ELECTRICAL SUPERVISOR at JOHNSONS ELECTRICAL TRADINGS
  • India - Chennai
  • January 1989 to May 1994

MV&LV INSTALLATION WORK
CONSTRUCTION OF TRANSFORMER GENERATOR, MV PANEL BOARD, CABLR TRAY&CABLE LAYING AND LIGHTING INSTALLATIPON

Education

Diploma, Electrical and Electronics Engineering
  • at VSVN POLYTECHNIC
  • April 1986

I am completed and passed inFIRST CLASS OF Diploma in Electrical and Electronics Engineering

Specialties & Skills

Construction
Site Supervision
material quality controller
Preventive Maintenance
ELECTRICAL

Languages

English
Intermediate
Malayalam
Beginner
Tamil
Expert

Memberships

The Electrical Licensing Board,Chennai,India
  • Electrical Supervisor
  • July 1993

Training and Certifications

diploma (Certificate)
Date Attended:
April 1986