Project Manager في ES Marine and Industrial Co.
  • تركيا - Zonguldak
  • أشغل هذه الوظيفة منذ يونيو 2023

Construction of Cargo Jetty in Ereğli Port

Project Manager Railway في Yapi Merkezi Construction Co.
  • تنزانيا - Tabora
  • أغسطس 2022 إلى أبريل 2023

Electrified Standard Gauge Railway
Lot 4 from Tabora to Isaka
1 billion USD

Construction Project Manager في Porr Construction Co.
  • قطر - الوكرة
  • فبراير 2021 إلى أغسطس 2022

1) Project Manager for QFZA Walkway Project

2) Construction Manager for Expressway Interchanges and Roads' Project. (completed)

Owner And Manager في AlaNarin Construction Company W.L.L.
  • تركيا - اسطنبول
  • يونيو 2019 إلى يناير 2021

General Contracting-Infrastructure and Buildings

Construction Project Manager في Al Darwish Engineering W.L.L.
  • قطر - الدوحة
  • مايو 2018 إلى يونيو 2019

Project and Value :
Improvement of Al Nasr Roads, 123 Million QAR

Client: Public Works Authority, ASHGHAL


The Projects includes below activities to improve main roads;

Foul Sewer Line upgrade, Stormwater line, TSE Line, Water line, Chambers and Manholes construction, Protection of existing Utilities, Traffic Signalized Junctions, Roads Construction, Interlock-paving works, TDPs-Road diversions, Traffic signs and road markings, Dewatering and Overpumping works, Street lights, ITS, QNBN, Ooredoo, QAF and KME networks.

Duties
Delivery of the Project to the Specifications, Standards and to the satisfaction of the Client within the time and budget planned.
Overall Project Management having smooth cooperation between each department, overseeing a workforce of 1 Deputy Project Manager, 1 Technical Manager, 1 HSE Manager, 1 QA/QC Manager, 1 Planning Manager, 1 Surveying Manager, 2 Construction Managers, 10 Site Engineers and 600 workforce including 3 General Formen, 20 Formen, operators, skilled and unskilled workers,

Ensure good relationship with Consultant and Client,
Subcontractors Management
Proper Contract, Commercial Management and Risk Management,
Interface Management with Stakeholders, such as Kahramaa Water and Electricity, MOI, etc.

Assistant Project Manager في KBR
  • قطر - الدوحة
  • أكتوبر 2016 إلى مايو 2018

Projects and Values:

* E-Ring Road (P008-C2) - 2.2 billion QR
* New Orbital Highway and Truck Road (P23-C1) - 3.2 billion QR (currently working for)

Client: Public Works Authority, ASHGHAL


The Projects include;
● New Highways’ constructions and upgrades
● New Utilities’ constructions and upgrades
● Bridges, Viaducts, Underpasses, Tunnels’ Constructions

Duties
Delivery of the Project to the Specifications, Standards and to the satisfaction of the Client within the time and budget planned.
Main duties are as below but not limited to;
Overall Project Management and Coordination,
Monitoring and overseeing Supervision Consultant’s and Construction Contractor’s progress/performance, taking necessary actions for the possible blockers early in advance,
Design Management
Risk Management
Contract and Commercial Management
Land Acquisitions
Interface Management with Stakeholders,
Handover Management, Logistic Management

Project Manager في STFA Construction Company
  • عمان - خصب
  • يوليو 2014 إلى يونيو 2016

Project: Improvement of Existing Khasab to Tibat Coastal Road, Musandam, OMAN

Client: Ministry of Transport and Communication / Directorate General of Roads and Land Transport.


The Project includes;

● Construction of Coastal Road. 3 million cu.m Core fill (0-1000kg) and 1.5 million cu.m (1-3 to, 4-8 to rock) protection, Quarries’ operations, Blasting works. Construction of new box culverts and extension of existing culverts, Road pavement, Beach Protections and Junction improvements.

● Slope Stability and Protection works such as Wire-Mesh laying, Anchoring, Wrapping, Energy absorbing Rock-fall Barriers, Buttress Walls, and Shotcrete operations.

Duties
Be fully conversant with the terms and conditions of the project, and have complete understanding of scope of works. Managing with the aim that the project shall be implemented according to standard drawings and specifications
Managing resources and overseeing finances to ensure that the project progresses on time and on budget.
Overseeing a Project team of 1 Technical Manager, 1 HSE Manager, 1 QA/QC Manager, 1 Planning Manager, 1 Surveying Manager, 2 Construction Managers, 5 Site Engineers and 400 workforce including 2 General Formen, 6 Formen, operators, skilled and unskilled workers,
Managing and coordinating the Subcontractors and ensure Project Specifications are applied.
Prepare, execute and report all project activities in controlled and most efficient manner.
Maintain a good relationship with the Employer/Engineer.
Ensure that, during all phases of the project, the relevant QA and HSE requirements, PQP and other project specific procedures are established, distributed & implemented, with the strict compliance of all project personnel.
Construction of Staff and Workers Camp - capacity of 1, 000 people; complete Facilities and Network, Mess hall, Recreation Centers, Clinic, Sports Fields, Gym, Swimming Pool and Facilities, Laundry, Music and Hobby Center

Project Manager في Yuksel Construction Co.INC
  • قطر - الدوحة
  • يونيو 2013 إلى يونيو 2014

Project :
Construction of PMS Viaduct for Qatar Foundation Education City,
QATAR

Client Qatar Foundation

Value 100 Million QAR

Project information

The Project includes;
● Construction of 1, 096 meter Viaduct,
● Two-elevated Stations for Light-Railway of Public Mover System in Education City.

Duties

Overall responsibility for project, for delivering the project to completion within the allocated time and budget and to the satisfaction of the client and according to the Contract Specifications, HSE and Welfare Requirements.

Ensures effectiveness of the Quality Management System, organizing the project with qualified and experienced staff and implementing the management system through the preparation of PQP.

Controls, directs and coordinates with all members of the project team to ensure all aspects of the project are successfully completed to the client's requirements within contract stipulations.
Overseeing a Project team of 1 Commercial Manager, 1 Technical Office Enginner, 1 HSE Manager, 1 QA/QC Manager, 1 Planning Manager, 1 Surveying Manager, 1 Construction Managers, 3 Site Engineers and 450 workforce including 2 General Formen, 6 Formen, operators, skilled and unskilled workers,

Managing and coordinating the Subcontractors and ensure Project Specifications are applied.
Establishes work breakdown structures and budget.

Reviews all contract documents to ensure requirements are clearly defined and achievable.
Ensures that all works and documentation are complete and submitted for final handover of the project.

Ensures that project quality objectives are met to fulfil the established Quality policy.

Reviews Project quality management system to ensure suitability and continuous improvement through periodic review meeting.

Senior Structural Engineer في LBG (Louis Berger Group)
  • الكويت - الكويت
  • يناير 2011 إلى يونيو 2013

PACE Consultants, JV
Project Jahra Road Development Project, www.jahraroad.com
Client MPW-Municipality of Public Works
Value 264.76 Million KWD

Project information
As part of the strategic plans of motorway improvements in Kuwait, constantly being put forward by the Ministry of Public Works, Al-Jahra Road Project is one of which attempting to transform the simple 3-lane Jahra road into a grand unified highway.

Responsible for overall management of production and assembling of segments for bridges construction by Balance Cantilever methodology.

Duties
Managing of Construction Supervision team consisting of Engineers, Inspectors and Quantity Surveyors.
Direct Site Base communication with the Employer.
Manage and Monitor Contractor`s progress with respect to time, program, quality and safety,
Establishing schedule of regular meetings to ensure Project department is effectively managed,
Overall managing of production and assembling of segments for bridges construction by Balance Cantilever methodology.
Attending Technical and Project Progress meetings,
Prepare Monthly reports,
Review and certify daily records for Pre-casting works at Precast Yard (casting, pre-stressing, finishing, storage, transporting and assembling)
Review all Structural Documents, Method of Statements and assist in the completion of the Design review report.
Record all design work regarded as non-conforming.
Assist in the review of all Structural submittals.
Assume responsibility for supervision of all Structural activities of the Project.
Carry out regular inspections for all structural construction materials and works completed by the Contractor to ascertain compliance with drawings, specifications and contract documents.
Attend and witness the testing and commissioning of all structural elements,
Provide early warning of any technical problems arising or decisions required.

Project Manager في System Construction Company
  • ليبيا - بنغازي‎
  • أغسطس 2009 إلى أغسطس 2010

Company SYSTEM Construction Company
Project Garyounes University Facade Repair Works - Stage 1
Client ODAC-Organization for Development of Administrative Centers
Value 37, 000, 000 LD

Section Manager في BILFINGER BERGER, Bauaktiengesellschaf
  • قطر - الدوحة
  • فبراير 2006 إلى يونيو 2009

Project Doha Expressway - Package 1 & 2

Client ASHGHAL-Municipality of Public Works

Value 220, 000, 000 Euro

Project information

Scope of Project consists of construction of;
● Structural works - 1xViaduct, 2xFly-overs, 4xUnderpasses-2.5 km in total length, 3xPump Stations, Precast Wall Barriers, MSE Walls construction.
● Infrastructure works - Road works - 11 km Road Construction, Water works - Drainage, Sewage and Electrical lines and Chambers (Manholes) along the lines. Micro-tunneling works, Precast Elements.

Duties
Reporting directly to Construction and Project Manager.
Construction of 4 intersections comprising of 1xViaduct, 2xFly-overs, 2xTemporary Steel Bridges (Acrow USA), 4xUnderpasses, 3xPump Stations, Precast Wall Barriers, MSE Walls and app. 150x Infrastructure Manholes that are in total value of 100 million Euros.
Responsibility Includes 250, 000 m3 Concrete and 20, 000 tons of Reinforcement for the construction of Foundations, Carriageway Bottom Slabs, Retaining Walls, Piers, Top Slabs, Post-tensioned Bridges, Approach Slabs and Wall Barriers, and Precast Yard Organization in terms of production of precast wall barriers, infrastructure manholes.
Oversee a construction workforce of 3 Site Engineers, 6 Superintendents, 10 Supervisors and 650 Thai workers (45 groups) at peak.
Coordination between the Job-site and Engineer (MAUNSELL) and the Client (ASHGHAL) as per the Performance in terms of Progress on job-site of the activities such as but not limited to Waterstops, Waterproofing, Reinforcement, Formwork, Bearings, Concrete works and Post-tensioning operations.
Prepare, monitor and update the Master Plan and interfacing with the Budget for Structures Section. Prepare daily, weekly programmes, monthly Progress and Performance reports and time schedule. Supervise quantity take-offs. Preparing Inventory and Cost Adjustment reports.
Discussing with Resident Engineer (MAUNSELL) and Design Office (PARSONS) about Site and Design Queries and finding Technical solutions,
Coordinating Subcontractors’ (Acrow USA, Bilfinger Berger Vorspanntechnik-Post-tensioning, Machinery and Equipment, Steel, Concrete, Waterproofing, Drilling and Shot-crete for Soil Stability, Protective Coating) daily progresses, checking the monthly progress reports, invoices and payments.
Coordinating and scheduling Concrete Batch Plant’s daily concrete operations for all Project sections as well as raw material (cement, aggregates, gabbro) supply.
Preparing tenders for Project materials and Sub-contract works, obtaining and evaluating quotations,
Doing comparison tables. Analyzing the unit prices.

Construction Site Manager في BILFINGER BERGER
  • ليبيا - بنغازي‎
  • يناير 2005 إلى يناير 2006

Bauaktiengesellschaft, LIBYA Projects
Project Juliana Bridge - General Bridge Concrete Renovation works
Client Public Works Authority
Value 10, 000, 000 LD (Ten million Libyan Dinars

Project information
Scope of Project consists of;
● Establishing Cofferdam (Bulk Earthworks) and Dewatering works to ensure a safe, convenient working area.
● Re-strengthening job at Piers and Webs; Chipping out damaged concrete to behind of corroded re-bars, replacing the rebar and re-concreting, removal of ducts inside webs.
● Re-strengthening job at Barriers; Production of Precast Barriers and Installation,
● Testing of existing situation of Post-tensioning tendons
● Replacing of Handrails and Expansion Joints
● Bearings replacements
● Cosmetic repairs and Protective coating applications

Duties
Prepare daily, weekly and monthly Programs. Plan, monitor and apply the Time schedule.
Execute and ensure the Project in all terms is fulfilled (civil, mechanical) according to the approved drawings and specifications.
Maintain quality and enforce company safety policy and take security measurements.
Fulfill coordination between Project management and Job-site. Monitor daily quality program with Contract Documents and respond to Technical queries from Job-site.
Prepare Field Change requests and Change orders.
Oversee a workforce of 2 Superintendents, 4 Foremen and 80 workers (Indian, Pakistani, Egyptian, and Sudanese) at peak.

Site Manager في Bilfinger Berger
  • ليبيا - بنغازي‎
  • يناير 2003 إلى يناير 2005

Project: Wadi Harawa Irrigation Project
Client: GMRA-Great Man-Made River Authority


Scope of Project consists of;

Project information Scope of Project consists of construction of;
● Pump Station - 8 pumps each 83m3/h capacity,
Sub-Contractor Company to Bilfinger Berger BAU for Electrical installations is ABB.
● Rest House building 1, 200 m2, and
● Transmission Line in 58 kilometers. Gravity Line PVC, PN6, 15 km., Pressured Line uPVC and Ductile, PN 16 and PN 25, 43 km. and 56 pieces of Air valve chambers, 56 pieces of Drain valve chambers, and Control Chambers along the pipeline.
● Farm Tanks for irrigation water, 160 pieces. Tank connections. Protection concretes around.

Duties
Plan, monitor and evaluate the Time schedule. Prepare daily, weekly and monthly Progress reports, Work Performance reports. Execute and ensure the Project in all terms (civil, mechanical) according to the approved drawings and specifications. Supervise quantity take-offs. Maintain quality and enforce company safety policy and take security measurements. Participate in meetings weekly held with Client. Fulfill coordination between Project management and Client. Monitor Contractor (ABB) quality program with Contract Documents and respond to contractor technical queries. Prepare Field Change requests and Change orders. Also Monitor Project’s cash-flow, expenses for Client and execution. Prepare weekly Petty cash and financial reports to Management. Oversee a workforce of 2 Engineers, 1 Administrative Officer, 2 Superintendents, and 6 Foremen 200 people at peak.
Construction of Staff and Workers Camp - capacity of 500 people; complete Facilities and Network, Mess hall, Recreation Centers, Clinic, Sports Fields, Gym, Laundry, Music and Hobby Center

Site Manager في BILFINGER BERGER
  • ليبيا - بنغازي‎
  • يناير 2001 إلى يناير 2003

Bauaktiengesellschaft, LIBYA Projects

Project Western Wadis Pipe Route
Client GMRA-Great Man-Made River Authority
Value 5, 500, 000 LD (Five and half million Libyan Dinars

Project information
Remaining works of Western Wadis Pipe Route. Project consists of refurbishment and completion of 2 pieces of 30.000 m3 (Jarif and Tilal South), 2 pieces of 20.000 m3 (Tilal North and Quabaibah) water reservoirs together with Installation of inlet, outlet, overflow systems; Erection of 70 km. feeding ductile pipeline; construction and installation of Air Valves, Drain Valves and Control valve chambers.
Construction of Staff and Workers Camp - capacity of 2, 500 people; complete Facilities and Network, Mess hall, Recreation Centers, Clinic, Sports Fields, Laundry

Site Manager في ODAK Engineering and Construction Company
  • تركيا - أضنة
  • يناير 1999 إلى يناير 2001

Project: Adana - Catalan Water Supply and Sanitation Project
Client: ASKI-Adana Water and Drainage works Authority

Project information
In the scope of Adana Water Supply project which has been
undertaken by the consortium of Lurgi Bamag-STFA-ALKE,
execution of pipe laying works for the transmission lines in 1800 mm.
and 2200 mm. in diameter and in 30.2 km total length.
The components of the project are water treatment plant in
250.000m3/day capacity, transmission line in app. 38 km. total lengths.
Two lake crossings via service bridge, transmission tunnels (9 pieces),
reservoirs (9 pieces), pumping stations (7 pieces) and distribution
network in 55 km. total length.

Field Civil Engineer في VOEST ALPINE Oil Field Services, Austrian Co. Client AGOCO-Arabian Gulf Oil Company
  • يناير 1999 إلى يونيو 1999

Location Tobruk - LIBYA
Project information Civil and Mechanical works for installation of Feed and Reject water
lines to Refinery plant. Project consists of Ductile Pipe line and valves,
fittings, chambers installation, pipe supports, and earth works such as
excavation, bedding, and backfilling. Construction of 270 m2 control
building. Construction of Oil tank foundations. Corrosion protection by
paint for the Tanks.
Reason to leave Project end

Planning Engineer في BILFINGER BERGER, Bauaktiengesellschaf
  • ليبيا - طرابلس
  • يناير 1998 إلى يناير 1999

Client ODAC-Organization for Development of Administrative Centers

Duties
Technical office and Site execution works of a 10.000 m2 Administrative building,

Site Engineer في STFA, MARINE – OFFSHORE Construction CompanyClient GAMA Construction and Installation Co
  • تركيا - اسطنبول
  • مايو 1997 إلى أغسطس 1998

Project: Gas Plant -Cooling Water Intake and Discharge System

Client: GAMA Construction and Installation Co.
Location: Marmara Ereglisi-Tekirdag

Duties
Daily organization of both Onshore and Offshore activities. Responsible for dredging
works, establishing cofferdam, breakwater, driving sheet piles and earth works, construction
of Pump Station and Drop structure, deep sea pipe and culvert lying.

Transferred to Misurata - LIBYA
Project LISCO Wharf Repair, Misurata - LIBYA
Location Misurata - LIBYA

Duties
Site (Field) Engineer overseeing a workforce of 80-100 people on deep sea Harbor Wharf repairs. Responsibilities include underwater works such as inspection of pilings (and tubular pile driving), concreting of precast beams, slabs and Fender Blocks, Concrete corrosion repairs on the Wharf, Welding inspection of the rails for traveling loading unloading crane on wharf. Maintain project safety awareness and enforce security laws, standards and regulations. Ensure the quality control.

Production Engineer في ESTON, Zeytinoglu Holding
  • تركيا
  • يناير 1996 إلى يناير 1997

Daily organization of Precasting plant including material ordering. Prepare daily, weekly,
monthly progress reports. Monitor Contractor Quality Control Program acc to drawings and
specifications. Monitor as builts. Participate in progress meetings. Monitor production of Pre-
stressed concrete precast elements such as various kinds of beams and others. Evaluate
construction material testing results. Stock control, quality control, training personnel and
safety control.

Liason Officer , Engineer في Naval Force
  • تركيا - أنطاليا
  • يناير 1995 إلى يناير 1996

Military Service - Naval Officer
Civil Engineer and Liaison Officer in Naval Force

الخلفية التعليمية

بكالوريوس, Civil Engineer
  • في 9 Eylul University
  • فبراير 1995

Specialties & Skills

ADMINISTRATION
BUDGETING
CUSTOMER RELATIONS
ENGINEERING
MEETING FACILITATION
MICROSOFT OFFICE
MICROSOFT WORKS
PERSONNEL
PROGRESS
QUALITY

اللغات

العربية
متوسط
الانجليزية
متمرّس
الالمانية
متوسط
التركية
متمرّس