إسماعيل مصطفى, QA/QC Manager

إسماعيل مصطفى

QA/QC Manager

Engineering Consultants Group S.A (ECG)

البلد
مصر - الإسكندرية
التعليم
بكالوريوس, Civil Engineering
الخبرات
44 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :44 years, 3 أشهر

QA/QC Manager في Engineering Consultants Group S.A (ECG)
  • مصر
  • أشغل هذه الوظيفة منذ مايو 2014

Construction of buildings such as main workshop building, vehicle workshop, paint shop & blasting shed, maintenance building, main warehouse building, fire & safety building, technical building, canteen building, telecom building, refinery gate house, archive building, general service building, chemical warehouse building, central chiller plant building, substations and laydown area covered shed with associated power supply, fire fighting alarm system, potable water, utility water, drainage, irrigation, telecommunication, etc. that within the new refinery.

Project Manager في Engineering Consultants Group S.A (ECG)
  • الإمارات العربية المتحدة
  • أغسطس 2016 إلى مايو 2016

Management of engineering, procurement, design review for different disciplines, material selection for construction works and construction activities and quality surveillance necessary to complete the construction stages for following buildings :

Reception, EMAL Hall, Administration, Indoor Recreation, Outdoor Recreation, Canteen & Kitchen, Masjed, Emergency Response Center, Mobile Training, EHS Training, Substation Direct Cooling Plant, water supply/drainage networks, internal roads and landscaping .

Project Manager في Engineering Consultants Group S.A (ECG)
  • مصر
  • مايو 2014 إلى أغسطس 2014

Management of engineering, procurement and construction activities and quality surveillance necessary to complete the work for Main & Chemical Warehouses consisting of the following facilities:
•Main Warehouse Building
•Chemical Warehouse Building
•Back Yard Shelter
•Service Block
•External Works, which include road network, loading and unloading pavement, landscaping, - underground services, car parking spaces, lighting, fencing etc.
•Related Civil, Electrical, Mechanical, Structural, Sewage / Storm water, Oily sewer, Potable water, HVAC, Architectural, IT & Telecom network systems including Fire Protection & Detection System, CCTV system, PA system, access control, lighting protection including all tie-in/ hook-up for applicable item with existing refinery systems.
•Racking and shelving system.
•Provision of Furniture etc.

Technical Project في Abu Dhabi Gas Industries Ltd. (Gasco)
  • الإمارات العربية المتحدة
  • ديسمبر 2009 إلى يناير 2011

Construct Two hundred and forty two (240) accommodations and extension of existing Asab Recreation Center (ARC) to serve the anticipated new employee intake.
The new accommodation constructed to meet the requirements that with complete infrastructure and other services.

Senior Project Engineer
  • سبتمبر 2007 إلى يوليو 2009

Construct 456 accommodations to serve the anticipated new employee intake, complete with infrastructure and services.

Senior Resident Engineer في Year of Joining Mott MacDonald Group 1996
  • الإمارات العربية المتحدة
  • ديسمبر 2005 إلى سبتمبر 2007

Client Abu Dhabi Water Distribution Company (ADDC)

Contract Value DHS 27, 000, 000

•Construct of OD 355, OD 315 and OD 160 HDPE pipeline from Yafeena, Saadiat and Jubail Islands. Total length 35 km.
•Construct 21 km DI distribution network in Saadiat Island, diameters 100, 150, 200, 300, 400 and 600 mm connected with associated Valves and Turbine/ EM Flowmeters.
•Connect the Islands across marine channels with 14 m underneath seabed submarine pipelines. Total lengths 1400 m + 500 m, by utilize "Horizontal Directional Drilling Method".
•Water distribution different diameters network at Jubail Island. Total length 14 km.
•Construct 4x250, 000 gal GRP water irrigation storage tanks at Jubail Island.
•Construct 3 MIGD capacity pumping station at Jubail Island consist of 4 duty and 2 standby pump sets with associated switchgear and control facilities.

Senior Resident Engineer في Installation of Interface & Bulk Water Consumer Metering
  • نوفمبر 2003 إلى يناير 2005
Senior Resident Engineer في ADDC
  • الإمارات العربية المتحدة
  • يناير 2003 إلى نوفمبر 2003

Client Abu Dhabi Water Distribution Company (

senior resident engineer في Al Wagon Network, Al Ain
  • الإمارات العربية المتحدة
  • يناير 2002 إلى يناير 2003

Contract Value DHS 60, 000, 000

This fast track project involves the laying of a DN 1000 mm GRP water pipeline from Sweihan to the outskirts

Senior Resident Engineer في Umm Al Nar Desalination Station "B
  • يناير 2000 إلى يناير 2002

Client Al Ain Water Distribution Company (AADC)

Contract Value DHS 20, 000, 000 (Free Issue Materials)

Construct of water distribution system for the existing and new development areas in the Al Wagon, Al Quoa and Al Erad sectors of Al Ain. The work involve the construction of about 50 kms of ductile iron water pipeline of diameters varying from DN 100 to DN 900, construction of various pipeline structures like valve and fire hydrants chambers. The project also involved the construction of pre-cast and cast in situ valve chambers, installation of fire hydrants, 2000 house connections, hydraulic pressure testing, and disinfection and flushing of the system etc.

Senior Resident Engineer في Abu Dhabi Water & Electricity Authority
  • الإمارات العربية المتحدة
  • يناير 1996 إلى يناير 1998

Contract Value DHS 200, 000, 000

Supervise and construct the infrastructure and other civil works of 2x 12.5 MIGD MED desalination plant and associated structures such as the local pumping station, switchgear building, upgrading of the seawater intake and foundations for the MED units.

Modification in existing foundation of Units 1, 2 & 3 at UAN East to suit uprating works.
Supervision soil investigation activities for the new foundation of Unit 9 & 10 pump foundations and Control/Switchgear building.
Investigate and fix the suitable routes of pipelines such as seawater, reject, drainage and distillate pipelines.
Foundations relating desalination plant, associated Control/Switchgear building and pipe rack.
Excavation, bedding, installation, testing of GRP pipelines with different diameters for seawater, distillate water and reject pipes.

Representative في SIDEM INTERNATIONAL CO
  • الإمارات العربية المتحدة
  • يناير 1994 إلى يناير 1996

Three Desalination plants at Jabal Dhanna and Dalma
Civil

Consulting Engineer في DR. M. H. ALI EL-SAIE
  • الإمارات العربية المتحدة
  • يناير 1991 إلى يناير 1994
Senior Resident Engineer في EWBANK PREECE LIMITED
  • الإمارات العربية المتحدة
  • يناير 1990 إلى يناير 1991

Client Abu Dhabi Water & Electricity Department (WED)

Contract Value DHS 120, 000, 000

3 nos. 1 MIGD MED Desalination Plants at Sila.

Responsible for the supervision of following civil works:

Soil investigation for the site of plant and associated buildings.
Deep foundations relating desalination plants, seawater pump house, switchgear& control building.
Construction/finishing works for associated buildings.
Cable and pipe trenches.
Installation of seawater intake pipe 600 m length, (GRP. DN 900), under seabed.
Installation of outfall G.R.P. pipe and concrete outfall structure.
Road works.

Resident Engineer في DR. M. H. ALI EL-SAIE, CONSULTING ENGINEERS
  • الإمارات العربية المتحدة
  • يناير 1986 إلى يناير 1989

Client Abu Dhabi Water & Electricity Department (WED)

Contract Value DHS 700, 000, 000

Al Taweelah (A) G.T Power & Desalination Plant (Lot "D") which consists of 3 multi-stage flash evaporators, two auxiliary boilers (160 t/hr) and an exhaust heat recovery boiler (210 t/hr)

Lot "P", comprised of three Gas Turbine units of 200 MW capacities and an exhaust heat recovery boiler complete with all auxiliaries and ancillary equipment, together with gas and fuel oil system and fuel storage tanks.

Responsible for supervision of the following civil works:

Piling works, foundation construction and finishing works for associated multi-storey switchgear and control buildings and foundation for boiler and desalination plants.
Supervise the construction of seawater intake as well as the outfall structure.
Supervise the construction and finishing works of multi-storey industrial buildings.
Supervise the construction of steel structure for desalination and boiler plants.
Cable/Pipe trenches.
Installation of drain and over flow cement pipes.
Installation of potable water and fire fighting ductile iron cement lined pipelines

Project Engineer في ALI NIGM, CONSTRUCTING AND CONTRACTING CO. EGYPT
  • يناير 1977 إلى يناير 1986

Responsible for supervision of the following civil works:

Construction of administration multi-storey buildings.
Construction of Residential multi-storey buildings.
Construction of steel structure workshop and stores.
Construction of industrial building of refilling the cylinder of oxygen gas.
Road works.

Lieutenant في EGYPTIAN ARMY FORCES
  • يناير 1973 إلى يناير 1977

the Egyptian Armed Forces
Responsible for civil works related for military installations.

Senior Resident Engineer
  • إلى
Senior Resident Engineer في Abu Dhabi Water & Electricity Authority
  • الإمارات العربية المتحدة
  • إلى

Contract Value DHS 1.8 Billions

Supervise the site infrastructure and other civil works for 5 x 12.5 MIGD MSF desalination plants and associated buildings. The project consists the following:

150, 000 m3 of earthwork, soil improvement with more than 5000 number of stone piles, 1500 number of piles, 100, 000 m3 of reinforced concrete with protective coating, 5000 m of piping works, structural steel works, 50, 000 m2 of finishing works, sea water intake structure, outfall multi tunnels structure, and loading jetty marine works, dredging 250, 000 m3 of sea bed material and shore protection.

The civil works consisted of:
Site Reclamation / Preparation Works.
Seawater Intake Structure with intake channel and seawater pumping station.
Deep Foundations and supports for Five distillers, capacity 12.5 MGPD each.
Five boilers with associated installations.
Switch gear / Control Buildings.
Store facilities.
Chlorination building.
Gas Reducing Station.
Town Water Pumping Station.
Four Steel Storage Tanks of capacity 66, 000 m3 each.
Discharge Box Culvert about 1000 m length.
Outfall Structure.
Asphalt Roads and Paved areas with street lighting.
Cable/pipe trenches.
Piping works for sea water supply, distillate water, fire-fighting installations, potable water and drainage systems.

1998 to 1999 Addition of Units 9 & 10 Desalination Plants at Umm Al Nar West and Uprating of Existing UAN East Production Facilities

Senior Resident Engineer في Abu Dhabi Water & Electricity Authority
  • الإمارات العربية المتحدة
  • إلى

Contract Value DHS 20, 000, 000

The Project involved:

Construction of 62 insitu concrete valve chambers in Mussafah.
Rehabilitation and replacement of 700 nos. fire hydrants of different types in Abu Dhabi and Mussafah.
Raising or replacement of 500 nos. precast concrete hydrant chambers in Abu Dhabi and Mussaffah.
Investigate / evaluate & test of existing underground hydrants and valves at Abu Dhabi and Mussafah and preparing a condition report and rehabilitation advise for each unit.
Reviewing condition reports with Civil Defence Department
Checking material approval submittals
Survey material quantities and issue material orders to the Contractor
Prepare the Monthly Progress Reports
Prepare contractor's payment application and RCDRs
Management of the site supervision staff.

Resident Civil Engineer في MSF
  • الأردن
  • إلى

Client Abu Dhabi Water & Electricity Department (WED)

Contract Value DHS 450, 000, 000

Responsible for supervision of the following civil works:
Pilings and foundation works for the four no.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في he Alexandria University
  • يناير 2017

Specialties & Skills

CABLEADO
CUSTOMER RELATIONS
ENGINEERING
LIGHTING
MICROSOFT WORKS
MINISTRY OF DEFENCE
NETWORKING
PROGRESS
SUPERVISORY SKILLS