Project:- 4-laning of Phagwara-Rupnagar section of NH344A from Km. 0.00 to Km. 80.820in the State of Punjab on Hybrid Annuity Mode (14400 Millions)
Client: - National Highway Authority of India (NHAI)
Project Includes 138 Structures (1 Elevated Structure of 99 spans, Length 3.5 km, 4 Grade Separators, 1 Railway Over Bridge, 2 Major Bridges, 37 Minor Bridges, 1 All Vehicle Under Pass, 1 Pedestrian Crossings and 91 Culverts)
Responsibilities:
• Supervised all the structure works including foundation (piling & open foundation), Sub-structure and Super-Structure (PSC/RCC/Steel Girders, Solid /Composite Slab), Culverts.
• To check and approve the reinforcement laid for major components of structures as per approved drawings and specifications.
• Supervising the Erection of girders, RE Block Casting and erection.
• To witness the Cube Tests of each component constructed.
• To prepare and update the Progress Report and Status of project completion as per submitted schedule.
• To co-ordinate with NHAI technical team and Concessionaire for any work stoppages/local interferences.
• To attend progress review meetings with Project Director, NHAI.
• To attend meetings with Project District Collector regarding local hindrances and issues for land acquisition, etc..
• To visit the manufacturer’s factory for testing of bearings/expansion joints, approval of other materials.
Project:- Development of Access Controlled 6 Lane Kundli - Manesar Expressway from km. 0+000 To km. 83+320 in the State of Haryana on BOT (Annuity) Basis (Balance Work) Development of Access Controlled 6 Lane Kundli - Manesar Expressway from km. 0+000 To km. 83+320 in the State of Haryana on BOT (Annuity) Basis (Balance Work) (15760 Millions)
Client: - Haryana State Industries and Infrastructures Development Corporation
Project Includes 205 Structures (3 Grade Separators, 4 Railway Over Bridges, 6 Major Bridges, 38 Interchanges, 7 Minor Bridges, 22 All Vehicle Under Passes, 23 cattle Crossings., 38 Pedestrian Crossings and 64 Culverts)
Responsibilities:
• Supervised all the structure works including foundation ( piling & well foundation), Sub-structure and Super-Structure( PSC/RCC Girders, Solid Slab), Culverts.
• To check and approve the reinforcement laid for major components of structures as per approved drawings and specifications.
• Supervising the Erection of girders, RE Wall Panel Casting and erection.
• To witness the Cube Tests of each component constructed.
• To prepare and update the Progress Report and Status of project completion as per submitted schedule.
• To co-ordinate with HSIIDC Engineers and Concessionaire for any work stoppages/local interferences.
• To attend progress review meetings with Principal Secretary, Haryana and MD, HSIIDC.
• To visit the manufacturer’s factory for testing of bearings, approval of other materials.
Project:- By Pass around Gumla Town connectiong NH-78 and NH-23 (R-G)in Jharkahnd (KM 0.00 to KM 12.842) (690 Millions) in EPC mode
Client- Ministry of Surface Road and Transport
Project Includes 38 Structures (2 Major Bridges, 6 Minor Bridges and 32 Culverts)
Responsibilities:
• To co-ordinate with Client(Authority), Authority’s Engineers, Design Director, etc.
• To co-ordinate with Design Director’s team for finalizing the Detailed Project Report and its approval from Safety Consultant, Proof Consultant and Authority’s Engineer.
• To arrange for initial set up by company, establish Site Camp & Site Laboratory
• To submit the Project Management Schedule and execute works in accordance with target dates.
• To prepare and submit IPC Bills to Client
• To get the Materials Approved by the Authority’s Engineer.
• To attend monthly Progress Review Meetings with client & Authority’s Engineer.
• To achieve desired progress as per the submitted/approved Project Schedule.
PMC of:
- Engineering Sanitary Landfill Project at Al Sohar town in Oman. (630 Millions)
- Client- Oman Environmental Holding Company (beáh)
- Construction of Landfill using HDPE Liners, Clay Liners, Geotextile, etc.
- Construction of Building and other Infrastructure facilities for Landfill Operations
- Constructions of Access Roads
- Weighbridge installation & Tyre Wash facility
- Leachate Evaporation Pond and UWA constructions
Highlights
Supervision of:
- The earthwork for construction of landfill including shaping.
- The installation of Liner materials .
- Construction of Building and Other infrastructure facilities.
- MEP works for all the facilities.
- LEP & UWA construction.
Prepared/Review:
- DPR, weekly progress report and monthly progress report for clients.
- Review the Project Management Schedule and monitor activities in accordance with target dates.
- Review the MPR, HSE report, other documents submitted by contractor
- Material Approval Sheets reviewed and forwarded to client for approval.
- Checking and forwarding the IPC claimed by contractor to Client.
- To conduct the Weekly & monthly Progress Review Meetings.
- To check and audit the HSE compliance by contractor
- To coordinate with client and contractor to achieve desired progress and quality.
- To witness Quality assurance tests at site and laboratory.
Projects Undertaken
Construction of:
- Soil Retention work for NH-21 (Kiratpur to Ner Chowk for IL& FS Transportation Networks Ltd). (220 Millions) It is a BOT Project(In Progress)
- Facia Panels including Casting, Shifting and Erection for approaches of Bridges in portion from Km 172 Km. to Km. 221 from Sesa to Orai including Orai Bye-Pass (NH-25) in UP under IRCON International Ltd. funded by ADB (160 millions). (Completed)
- Gabion Protection Work of Right bank of barrage for Maneri Dam on River Bhagirathi at Joshiyara, Uttarkashi (Uttrakhand) (130 millions) (In Progress)
- Gabion and Paramesh Retaining Wall for DLF Valley Project, Panchkula (80 millions). (Completed)
- Gabion and Paramesh Retaining Wall for Pioneer Urban Ltd, Gurgaon (13 millions). (Completed)
- Gabion and Terramesh Retaining Wall for Tata Projects Ltd., Kasauli, HP (35 Millions) (In Progress) EPS Project
Highlights
Executed:
- The casting, shifting and erection of RE Wall Panels.
- Installation and placing / construction of Gabion and Terra-Mesh/Para Mesh Retaining Wall.
Prepared:
- DPR, weekly progress report and monthly progress report for clients.
- Clearance and payment of RA bills to clients.
- MIS (Monthly Information System) for Head Office and maintained all documents as per ISO norms.
- Preparation of Budget & Profitability Statements, Risk Analysis, Cash inflow & outflow statements, etc.
Project Undertaken
Widening & Strengthening of State Highway from Dhamtari to Nagari (Package 10) in the state of Chhattisgarh under loan assistance from ADB (580 Million).
Highlights
Prepared:
- IPC and coordinated with consultants and clients in getting the payments.
- Work Program including the S-Curve.
- Working drawing all BBS for approval from consultants.
- Execution of all Concrete works in Culverts & Bridges.
Project Undertaken
Widening the Existing 4-Lane Portion from Km. 86 to Km. 96, covering Panipat City, on NH-1 in Haryana, to 6 Lanes and Construction of 6 Lane Elevated Structure on BOT basis for NHAI. (3250 million).
Highlights
Supervised all the structure works including RCC, PCC, Piling, Panel Casting & Erection for RE Wall.
Undertook a proof checking of working drawings of all components of the elevated portion, Vehicular Underpass, junctions, intersections, and the RE walls.
Reviewed the mix designs of all grade of RCC Concretes in accordance with the IRC standards.
Approved the materials such as Cement, Sand, Aggregates, Steel, Geogrids, Geotextile, etc.
Project Undertaken
Third National Highway Project of Four Laning and Strengthening of NH - 2 Package II-C (Fatehpur to Khaga) under loan assistance from World Bank (Rs. 3000 million).
Highlights
Checked and provided minor modifications as well as corrected the bridge drawings & bar bending schedules.
Scrutinized adherence of contractor’s temporary working drawings for being in accordance with standards.
Supervised all the concreting activities as well as other structural activities like Brickwork, R/Walls, RE Walls, Pipe Laying, etc.
Finalized the drawings and locations of various structures according to the site conditions.
Project Undertaken
Widening and Strengthening of Cuddapah - Renigunta Road (Andhra Pradesh State Highways Project-4) under the loan Assistance from World Bank (Rs. 1320 million).
Highlights
Prepared working drawings and bar bending schedules for various types of RCC structures, bridges & culverts.
Executed earthwork & structure construction for open foundation bridges.
Developed the Interim Payment Certificate for submission to the consultants.